Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《JOURNAL OF NORTHEASTERN UNIVERSITY》 1995-03
Add to Favorite Get Latest Update

Job Shop Multiobjective Scheduling on a Single Machine

Huang Xiaoyuan; Liu Hailong  
A multiobjective scheduling model for Job Shop production system was proposed and established on a single machine, machine,including total flow time, number of tardy jobs, maximum tardiness,total tardiness,total earliness,total setup time,precedence relation,etc. Simulating test was thus performed to annealing simulation.
【Fund】: 中国科学院复杂系统开放实验室基金
【CateGory Index】: U284.59
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【References】
Chinese Journal Full-text Database 1 Hits
1 WANG Jun-qiang,SUN Shu-dong,WANG Dong-cheng,YANG Hong-an(Sch.of Electromechanical Eng.,Northwestern Polytechnical Univ.,Xi'an 710072,China);Management & control of manufacturing cells based on theory of constrains[J];计算机集成制造系统;2006-07
【Co-references】
Chinese Journal Full-text Database 10 Hits
1 WANG Jun-qiang, SUN Shu-dong, YU Jian-jun, SUN Qiang(Sch. of Mechatronic Eng., Northwestern Polytechnical Univ., Xi'an 710072, China);Integrated production planning management & control model[J];计算机集成制造系统;2005-09
2 WANG Jun-qiang, SUN Shu-dong, CHAI Yong-sheng,SI Shu-bin (Coll. of Mechanical and Electrical Eng., Northwestern Polytechnical Univ., Xi'an710072, China);Research and implementation of equipment management information system based on component[J];计算机集成制造系统;2004-09
3 YE Tao-feng, HAN Wen-min (School of Economics & Management, East China Ship-Building Institute, Zhenjiang 212003, China);A Method on Determining Bottleneck in Make-to-Order Production[J];工业工程与管理;2003-06
4 FU XUEFANG(Weifang University, Weifang,261041);Optimization of the Manufacturing Resources Planning Based on Genetic Algorithms[J];应用数学与计算数学学报;2001-02
5 XIONG Hong\|yun\+1, YANG Xiu\|fang\+2, HE Yue\+31. Institute of Information and Control, Changsha Railway University, Changsha 410075; 2. Xi'an University of Technology, Xi'an 710049; 3. Xi'an Jiaotong University, Xi'an 710049);A Study on Fuzzy Capacitated Dynamic Lot-Sizing Problem[J];系统工程理论与实践;2001-01
6 XuXuejun;A Study on Batch Methods Based on Bottleneck Resources[J];价值工程;2000-06
7 He Ting (AMTC of Harbin Institute of Technology) Liu Fei (Xuzhou Combustion Control Institute) Ma Yulin; Yang Hai (Harbin Institute of Technology);STUDY ON SHOP-FLOOR SCHEDULING[J];机械工程学报;2000-05
8 Li Aihua Yin Liuying(Department of Management Engineering,Wuhan Metallurgy University of S & T,Wuhan);A Model for Determining the Size of Time Buffers in DBR[J];中国管理科学;1998-01
9 Ma Shihua; Chen Rongqiu; Li Zhicheng;An Integrated Planning and Control System Based on MRP and OPT[J];中国机械工程;1995-06
10 Huang Xiaoyuan; Liu Hailong;Job Shop Multiobjective Scheduling on a Single Machine[J];东北大学学报;1995-03
【Secondary References】
Chinese Journal Full-text Database 10 Hits
1 Zhao Xi;Hefei University of Technology;;CARBON FOOTPRINT TOC OPTIMIZATION MANAGEMENT METHODS OF MANUFACTURES FOR ENERGY CONSERVATION AND EMISSIONS REDUCTION[J];环境工程;2015-S1
2 CUI Jun-Hua;CHEN Jin;DENG Yu-Feng;LIU Qin;School of Mechanical Engineering, Jiangnan University;;Workshop Production Planning Control Based on the Value Density of Job-shop[J];计算机系统应用;2015-06
3 Wang Xianhong;Shi Guoquan;Changchun University of Science and Technology;Changchun Railway Vehicles Co.Ltd.;;Construction of a Planning and Dispatching Model Based on Cellular Manufacturing and Time Task Bus[J];中国机械工程;2015-05
4 WANG Jun-qiang;CUI Fu-dong;ZHANG Cheng-wu;SUN Shu-dong;Performance Analysis Center of Production and Operations Systems,Northwestern Polytechnical University;Key Laboratory of Contemporary Design and Integrated Manufacturing Technology,Ministry of Education,Northwestern Polytechnical University;;Capacity partition method of machines in cloud manufacturing-oriented job shops[J];计算机集成制造系统;2014-09
5 WANG Jun-qiang1,2,KANG Yong1,2,CHEN Jian1,2,GUO Yin-zhou1,2,ZHANG Ying-feng1,2,SUN Shu-dong1,2(1.Institute of System Integrated & Engineering Management,Northwestern Polytechnical University,Xi'an 710072,China;2.Key Laboratory of Contemporary Design and Integrated Manufacturing Technology,Ministry of Education,Northwestern Polytechnical University,Xi'an 710072,China);Identification approach for bottleneck cluster in a Job Shop[J];计算机集成制造系统;2013-03
6 MA Jinshan :Lect.;School of Energy Science & Engineering,Henan Polytechnic University,Jiaozuo 45400,China.;Safety Refined Management Efficiency of Coal Mine Based on Theory of Constraints[J];武汉理工大学学报(信息与管理工程版);2011-05
7 WANG Ben,YE Wen-hua(Nanjing University of Aeronautics and Astronautics,Jiangsu Nanjing,210016,China);Study on Production Scheduling Method of Re-entrant Bottlenecking Equipment of Aeronautical Composite Materials[J];中国制造业信息化;2011-11
8 GAO Yang LU Xiao-jie(School of Management,Hefei University of Technology,Hefei Anhui,230009,China);DBR-based Control and Management Strategy in Overhaul of Lager-Scale Equipments[J];科技信息;2011-09
9 Fan Jiajing1,2 Feng Dingzhong1 1.Zhejiang University of Technology,Hangzhou,310014 2.Zhejiang University of Science and Technology,Hangzhou,310023;Study on Manufacturing Cellular Design Based on Advanced Genetic Algorithm[J];中国机械工程;2011-01
10 WANG Jun-qiang1,2,CHEN Jian1,2,ZHAI Ying-ni1,2,ZHANG Song-fei1,2,YANG Jian-bin1,2,SUN Shu-dong1,2(1.Institute of System Integration & Engineering Management,Northwestern Polytechnical University,Xi'an 710072,China;2.Ministry of Education Key Lab of Contemporary Design & Integrated Manufacturing Technology,Northwestern Polytechnical University,Xi'an 710072,China);Influence of bottleneck utilization on job shop scheduling under random disturbance[J];计算机集成制造系统;2010-12
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved