Model and Algorithm of Furnace Charge Plan for Steelmaking-Continuous Casting Production Scheduling

Tang Lixin;Yang Zihou;Wang Mengguang  
An optimal furnace charge plan mixed integer programming model for steelmaking-continuous casting planning and scheduling is established. For solving this mixed integer programming model with constraint conditions,a strategy for constructing chromosomes and methods of crossover and mutation are proposed so as to make the solution at each iteration always feasible. Computation by using practical data shows the model and algorithm are effective.
【Fund】: 国家“八六三”高技术冶金部“八五”科技攻关重点项目
【CateGory Index】: TF345
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【References】
Chinese Journal Full-text Database 10 Hits
1 ZOU Caoyun;WANG Bao;WANG Bin;LIU Qing;State Key Laboratory of Advanced Metallurgy, University of Science and Technology Beijing;School of management and economics, Beijing Institute of Technology;;Optimal Charge Plan Model of Steelmaking Based on Multi-Objective Evolutionary Algorithm[J];金属材料与冶金工程;2015-06
2 ZHU Jun;Shanghai Baosight Software Co.,Ltd.;;A multiple-objective optimization algorithm of charge design problem of steel-making[J];宝钢技术;2015-01
3 CHEN Li;TANG Qiu-hua;CHEN Wei-ming;FLOUDAS C.A;LI Ming;School of Machinery and Automation,Wuhan University of Science and Technology;3rd Branch of Steel Plant,Wuhan Steel and Iron Company Limited;;Production scheduling of steelmaking-continuous casting integrated hybridizing constraint satisfaction and genetic optimization[J];计算机集成制造系统;2013-11
4 DU Bin;ZHU Jun;JIA Shujin;LIU Shixin;School of Information Science and Engineering,Northeastern University;Department of Automation,R&D Institute of Baosteel;;A Charge Optimization Model with a Consideration of Slab Design[J];同济大学学报(自然科学版);2013-10
5 BO Hong-guang;HUANG Wen-qiu;PAN Yu-tao;Faculty of Management and Economics,Dalian University of Technology;;Rules-based Order-grouping & Charging Composition Optimization in Steel Enterprises[J];工业工程与管理;2013-04
6 WANG Chuang~(1,2),LIU Qing~(1,2),LI Qing-yi~(1,2),WANG Bin~(1,2),XIE Fei-ming~4,WANG Bai-lin~(2,3) (1.State Key Laboratory of Advanced Metallurgy,University of Science and Technology Beijing,Beijing 100083,China; 2.School of Metallurgical and Ecological Engineering,University of Science and Technology Beijing,Beijing 100083,China; 3.Dongling School of Economics and Management.University of Science and Technology Beijing,Beijing 100083,China; 4.Fangda Special Steel Technology Co.,Ltd.,Nanchang Jiangxi 330012,China);Optimal charge plan model for steelmaking based on modified partheno-genetic algorithm[J];控制理论与应用;2013-06
7 ZENG Liang1,WANG Shan-shan2,YE Li-de1(1.Technology & Research Department,WISDRI Engineering & Research Co.,Ltd., Wuhan 430223,China;2.Wuchang Institute of Technology);An intelligent bi-level programming scheduling method for steelmaking and continuous casting(A)[J];冶金自动化;2012-05
8 Li Jihong,Li Lianghong,Hu Yunpeng;Steelmaking Shop Scheduling Optimization Method Design[J];科学之友;2012-06
9 ZHU Jun1,JIA Shu-jin2,DU Bin1,3,LIU Shi-xin1(1.School of Information Science & Engineering,Northeastern University,Shenyang 110819,China;2.Key Laboratory of System Control and Information Processing,Ministry of Education,Shanghai Jiaotong University,Shanghai 200240,China;3.Department of Automation,R & D Institute of Baosteel,Shanghai 201900,China.);PBIL and Maximum-Flow Based Algorithm of Charge Design Problem[J];东北大学学报(自然科学版);2012-01
10 Zhang Xuemei;Research on relationship between enterprise scale and cash holdings in online-game industry?——The empirical test come from Chinese online-game listed companies[J];上海管理科学;2011-06
China Proceedings of conference Full-text Database 7 Hits
1 Zheng Zhong;Hu Wanzhe;Long Jianyu;Gao Xiaoqiang;College of Materials Science and Engineering,Chongqing University;College of Economics and Business Administration,Chongqing University;;Charge design method for medium steel plate considering tapping time and capacity[A];[C];2016
2 LU Ke-bin~(1,2),HUANG Ke-wei~2,ZHANG Rui-you~1,WANG Ding-wei~1 (1.College of Information Science and Engineering,Northeastern University,Shenyang 110004,China; 2.Institute of Automation,Baosteel Technology Center,Shanghai 201900,China);Multi-objective model and algorithm for charge design problem of steel-making[A];[C];2009
3 Liu Qing Huang Xingwu Fu Pingyuan Li Jie (University of Science and Technology Beijing Xinjiang Bayi Iron and Steel Co.,Ltd Linfen Iron and Steel Co., Ltd. );SCHEDULING MODEL BASED ON PRODUCTIVE PROCESS ANALYSIS FOR FULLY CONTINUOUS CASTING OF STEEL[A];[C];2005
4 Lei Zhang Tianmu Ma Binglin Zheng (Research Center of Automation, Northeast University, ShenYang, 110004);The New Technology of Integrated Batch Planning(IBP)[A];[C];2005
5 WANG Hong-bing~1,XU An-jun~2,HE Dong-feng~2 (1.School of Information Engineering,University of Science and Technology Beijing,Beijing, 100083,China;2.School of Metallurgy and Ecology Engineering,University of Science and Technology Beijing,Beijing,100083,China);Solving the Combinatorial Optimization Problem of Steel-making Heat using Piecewise Genetic Algorithm[A];[C];2010
6 HUANG Hui~1,TU Nai-wei~1,MA Tian-mu~1,ZHENG Bing-lin~1,CHAI Tian-you~(1,2) 1.Key Laboratory of Process Industry Automation,Ministry of Education,Shenyang 110004,China, 2.Research Center of Automation,Northeastern University,Shenyang,110004,China;Vehicle Routing Problem based Model and Ant Colony Optimization Algorithm for Group Charge Problem of Ingot Casting[A];[C];2009
7 Ruiyou Zhang and Dingwei Wang are with College of Information Science and Engineering,Key Laboratory of Integrated Automation of Process Industry,Ministry of Education,Northeastern University,Shenyang 110819,China Kebin Lu,Kewei Huang,are with Institute of Automation,Baosteel Technology Center,Shanghai 201900,China;Graph-Based Model of Cast Planning Problem and Its Optimization[A];[C];2011
【Co-references】
Chinese Journal Full-text Database 10 Hits
1 WANG Chuang~(1,2),LIU Qing~(1,2),LI Qing-yi~(1,2),WANG Bin~(1,2),XIE Fei-ming~4,WANG Bai-lin~(2,3) (1.State Key Laboratory of Advanced Metallurgy,University of Science and Technology Beijing,Beijing 100083,China; 2.School of Metallurgical and Ecological Engineering,University of Science and Technology Beijing,Beijing 100083,China; 3.Dongling School of Economics and Management.University of Science and Technology Beijing,Beijing 100083,China; 4.Fangda Special Steel Technology Co.,Ltd.,Nanchang Jiangxi 330012,China);Optimal charge plan model for steelmaking based on modified partheno-genetic algorithm[J];控制理论与应用;2013-06
2 ZHU Jun1,JIA Shu-jin2,DU Bin1,3,LIU Shi-xin1(1.School of Information Science & Engineering,Northeastern University,Shenyang 110819,China;2.Key Laboratory of System Control and Information Processing,Ministry of Education,Shanghai Jiaotong University,Shanghai 200240,China;3.Department of Automation,R & D Institute of Baosteel,Shanghai 201900,China.);PBIL and Maximum-Flow Based Algorithm of Charge Design Problem[J];东北大学学报(自然科学版);2012-01
3 XUE Yun-can1,2,ZHENG Dong-liang1,2,YANG Qi-wen1,2(1.Jiangsu Key Laboratory of Power Transmission and Distribution Equipment Technology,Hohai University,Changzhou 213022,China;2.College of Computer and Information,Hohai University,Changzhou 213022,China);Optimum charge plan of steelmaking continuous casting based on the modified discrete particle swarm optimization algorithm[J];计算机集成制造系统;2011-07
4 WANG Chao1,2,LI Tie-ke1,2,ZHANG Wen-xue1,2,3(1.School of Economics & Management,University of Science & Technology Beijing,Beijing 100083,China;2.Engineering Research Center of MES Technology for Iron & Steel Production of Ministry of Education,Beijing 100083,China;3.School of Sciences,Ningxia Medical University,Yinchuan Ningxia 750004,China);Dynamic scheduling for steelmaking-continuous casting based on human-computer interaction[J];计算机应用研究;2011-04
5 ZHANG Li-ning1, QIU Di-shan1, LI Hao-ping2, HUANG Xiao-jun1(1. Key Laboratory of C4ISR Technology, National University of Defense Technology, Changsha Hunan 410073, China;2. Northern Electronic Equipment Institution, Beijing 100191, China);Task scheduling algorithm based on model decomposition for multi-machine with time windows[J];计算机应用;2010-11
6 YU Sheng-ping,CHAI Tian-you,ZHENG Bing-lin (Key Laboratory of Process Industry Automation,Ministry of Education, Northeastern University,Shenyang 110004,China);Hybrid intelligent optimal scheduling method for steelmaking and continuous casting and its application[J];系统工程学报;2010-03
7 ZHU Dao-fei1,2,ZHENG Zhong2,GAO Xiao-qiang21.Faculty of Metallurgical and Energy Engineering,Kunming University of Science and Technology,Kunming 650093,China 2.College of Material Science and Engineering,Chongqing University,Chongqing 400045,China;Hybrid genetic algorithm optimization-based production planning and simulation analysis for steelmaking and continuous casting[J];计算机工程与应用;2010-01
8 XIAO Yong-jun WANG Jing ZHANG Wen-xue(School of Economics and Management, University of Science and Technology Beijing,Beijing,100083,China) (School of Economics and Management, YanShan University, QinHuangDao, HeBei 066004,China);Research on Rescheduling of Steelmaking and Continuous Casting Hybrid Flowshop[J];微计算机信息;2009-27
9 LU Ke-bin1,2,HUANG Ke-wei2,ZHANG Rui-you1,WANG Ding-wei1 (1. College of Information Science and Engineering,Northeastern University,Shenyang 110004,China; 2. Institute of Automation,Baosteel Technology Center,Shanghai 201900,China);Multi-objective model and algorithm for charge design problem of steel-making[J];中南大学学报(自然科学版);2009-S1
10 YU Sheng-ping1,CHEN Wen-ming2,PANG Xin-fu1,CHAI Tian-you1,ZHENG Bing-lin1(1.Key Laboratory of Process Industry Automation of Ministry of Education,Northeastern University,Shenyang 110004,China;2.School of Economics and Management,University of Science and Technology Beijing,Beijing 100083,China);Simulating System of Dynamic Scheduling for Steelmaking and Continuous Casting Based on Graphic Edit Platform[J];系统仿真学报;2009-16
China Proceedings of conference Full-text Database 1 Hits
1 WANG Hong-bing~1,XU An-jun~2,HE Dong-feng~2 (1.School of Information Engineering,University of Science and Technology Beijing,Beijing, 100083,China;2.School of Metallurgy and Ecology Engineering,University of Science and Technology Beijing,Beijing,100083,China);Solving the Combinatorial Optimization Problem of Steel-making Heat using Piecewise Genetic Algorithm[A];[C];2010
【Secondary References】
Chinese Journal Full-text Database 10 Hits
1 ZHANG Chunsheng;LI Tieke;Renmin University of China;Petrochina Planning and Engineering Institute;University of Science and Technology Beijing;;Optimization Model and Algorithm for Lot Planning Coordination between Steelmaking and Hot Rolling[J];信息与控制;2017-01
2 LIU Qing;WANG Bin;WANG Zhou;DOU Kun;XIE Fei-ming;LU Xin-chun;State Key Laboratory of Advanced Metallurgy,University of Science and Technology Beijing;Fangda Special Steel Science and Technology Co.,Ltd.;;Fine manufacturing for steelmaking-continuous casting process of high quality steel[J];连铸;2016-03
3 XU Zhao-jun;ZHENG Zhong;GAO Xiao-qiang;College of Material Science and Engineering,Chongqing University;College of Economics and Business Administration,Chongqing University;;HGA combined with priority strategy for production planning of steelmaking-continuous casting[J];控制与决策;2016-08
4 Xie Yong;Hu Rong;Qian Bin;Chen Shaofeng;Zhang Guilian;Zhang Xiaodi;Faculty of Information Engineering and Automation,Kunming University of Science and Technology;;Improved population-based learning algorithm for solving vehicle routing problem with soft time windows[J];南京理工大学学报;2016-01
5 ZOU Caoyun;WANG Bao;WANG Bin;LIU Qing;State Key Laboratory of Advanced Metallurgy, University of Science and Technology Beijing;School of management and economics, Beijing Institute of Technology;;Optimal Charge Plan Model of Steelmaking Based on Multi-Objective Evolutionary Algorithm[J];金属材料与冶金工程;2015-06
6 WANG Chuang;WANG Xian-yong;LIU Peng-tao;Steelmaking Engineering & Research Institute,Beijing Shougang International Engineering Technology Co.,Ltd.;;Application of dynamic modes combining method in the scheduling simulation of steel plant[J];冶金自动化;2015-06
7 LIU Jian;WANG Bin;WANG Bailin;WANG Bao;ZOU Caoyun;LIU Qing;State Key Laboratory of Advanced Metallurgy,University of Science and Technology Beijing;Dongling School of Economics and Management,University of Science and Technology Beijing;;Optimization model and algorithm for slab hot rolling planning problem[J];计算机集成制造系统;2015-12
8 LIU Chao;WANG Sen;ZHOU Wei;LIU Li-lan;;Research of integrated scheduling method of steelmaking-continuous casting-hot rolling[J];制造业自动化;2015-09
9 WANG Jing;ZHENG Ya-nan;School of Economics and Management,Yanshan University;;Design of rescheduling model and algorithm for steelmaking and continuous casting with machine error[J];冶金自动化;2015-02
10 TANG Qiuhua;ZHENG Peng;ZHANG Liping;ZHANG Qimin;CHEN Li;College of Machinery and Automation,Wuhan University of Science and Technology;Wuhan Steel and Iron Company Limited;;Multi-buffered steelmaking production scheduling with heuristic rules and memetic algorithm[J];计算机集成制造系统;2015-11
China Proceedings of conference Full-text Database 1 Hits
1 Zheng Zhong;Hu Wanzhe;Long Jianyu;Gao Xiaoqiang;College of Materials Science and Engineering,Chongqing University;College of Economics and Business Administration,Chongqing University;;Charge design method for medium steel plate considering tapping time and capacity[A];[C];2016
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved