Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Dam Observation and Geotechnical Tests》 2002-04
Add to Favorite Get Latest Update

DAILY OPTIMAL SCHEDULING OF THREE GORGES CASCADED HYDROPOWER PLANTS

Zeng Yonghong, Quan Xianzhang, Li Chengjun (Huazhong University of Science and Technology, Wuhan 430074, China)  
Electricity interaction and hydraulic coupling between cascaded reservoirs lead to considerable complication of short-term economic operation of hydropower plants. Accordingly, the schemes of dispatch for plants are flexible and versatile. Based on three possible dispatch schemes of the Three Gorges cascaded hydropower plants, daily optimal operation is modeled in this paper and dynamic programming (DP) is employed to compute them. Results show DP is reliable and effective in solving the dispatch of cascaded hydropower.
【CateGory Index】: TV737
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved