Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Journal of Northeast Forestry University》 2002-06
Add to Favorite Get Latest Update

The Altitude Control of Long Span Prestressed Continuous Frame Bridge

Zhu Deju(Northeast Forestry University, Harbin 150040, P. R. China); Yu Zhe(Harbin Civicism Second Company)  
In this paper, the altitude control method of long span prestressed continuous frame bridge is stated and the influencing factors related to altitude control are also analyzed by using Taolaizhao Songhua River especially large-scale bridge as an example. The calculational model is established first, and the deformation of each construction phase is calculated with the finite element program BSAS in forward analysis method and the precamber that is the basis of altitude control of each cantilever construction segment is gotten.
【CateGory Index】: U448
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【References】
Chinese Journal Full-text Database 9 Hits
1 LOU Yongping;WANG Zhiping;CHEN Lifeng;ZHANG Jiahua;Hangzhou Traffic Engineering Group.,Co.;Shanghai Construction Group Overseas Business Department;;Construction Technology for High Pier Prestressed and Long Span Continuous Concrete Beam Bridge in Mountain Area[J];建筑施工;2016-10
2 Zhang Zongwei;Zhou Xianxiang;Shanghai Construction No.1 (Group) Co.,Ltd.;;Construction Elevation Control over Suspension Pouring of Continuous Variable Cross-Section Box Girder[J];建筑施工;2015-02
3 XIANG Jun(Department of Civil Engineering,Huaiyin Institute of Technology,Huai'an 223001,China);Construction Technology Research for High-rise Joint Structure Deformation Control[J];煤炭技术;2012-12
4 WANG Yi(Hefei Branch of Anhui Hydraulic Research Institute,Hefei,Anhui 230088,China);Simulation Analysis of Continuous Girder Bridge in Cantilever Construction[J];水利与建筑工程学报;2012-04
5 DU Hong(Chongqing City Construction Investment Corporation,Chongqing 400015,China);Construction Monitoring of One Grand Bridge Crossing Yellow River in Inner Mongolia[J];交通标准化;2011-20
6 ZHENG Yong-hong(The 3rd Railway Survey and Design Institute Group Corporation,Tianjin 300251,China);Research on the Construction Control of Cantilever of Prestressed Continuous Bridge in Tianjin Nanjiang Haven[J];铁道工程学报;2009-10
7 LIU Tao(Railway the Third Survey and Design Group Co.,LTD,Tianjin 300142,China);The construction inspect of cantilever arm on prestress continuous beam bridge[J];水科学与工程技术;2008-03
8 Yang Honghao Tian Shanpo;Construction Monitoring and Control for Cantilever of Continuous Prestressed Concrete Girder Bridge with Large Span[J];铁道勘察;2007-04
9 JIANG Hao GUO Xue-dong;Research into height control of cantilever grouting pre-stressed concrete continuous beam bridge[J];山西建筑;2007-12
【Citations】
Chinese Journal Full-text Database 2 Hits
1 GU AN bang,CHANG\ Ying,YUE Yun xiang (Department of Bridge & Structural Engineering,Chongqing Jiaotong Institute,Chongqing 400074,China);The principle and method of construction control long span prestressed continuous rigid frame bridge[J];重庆交通学院学报;1999-04
2 GU AN bang,CHANG\ Ying,YUE Yun xiang (Department of Bridge & Structural Engineering,Chongqing Jiaotong Institute,Chongqing 400074,China);The construction control for Chongqing Huanghuayuan Jialin River bridge[J];重庆交通学院学报;1999-04
【Co-citations】
Chinese Journal Full-text Database 8 Hits
1 ZENG Liqiang;Huizhou Highway & Bridge Survey & Design Institute;;Design Parameters Optimization for Girder of Large Span Continuous Rigid Bridge Designed on Orthogonal Test[J];广东公路交通;2016-03
2 HAO Niebing;GU Anbang;School of Civil Engineering,Chongqing Jiaotong University;;Alignment Adjustment Method of Concrete Filled Steel Tubular Arch Bridge in Arch Rib Hoisting[J];重庆交通大学学报(自然科学版);2016-03
3 Wang Liang;China Railway 24th Bureau Group Xinyu Engineering Co.,Ltd;;Four hole a league long-span continuous beam construction scheme analysis and management[J];山西建筑;2016-08
4 YANG Yafang;The 1st Engineering Co.,Ltd.of China Railway 12th Bureau Group;;Research on monitoring technology for prestressed concrete continuous curved girder constructed by cantilever casting method[J];铁道建筑;2016-02
5 LI Youwei;Cantilevering of the Continuous Beams of Bawanghe Super-bridge[J];山西科技;2010-03
6 SHEN Guo-fei1,SUN Sheng-jiang2,SU Fang1,HU Jing-long1(1.College of Water Conservancy and Civil Engineering,Xinjiang Agricultural University,Urumqi 830052,China;2.School of Highway,Chang'an University,Xi'an 710064,China);Simulation Analysis on Construction Control of Long-span Continuous Rigid Frame Bridges[J];新疆农业大学学报;2009-04
7 ZHU Xian-yi;Cantilever constructional requirements and controlling methods of continuing bridge[J];山西建筑;2009-20
8 JIA Jinqing1,YU Fang1,YAN Changwang1,JIANG Rui2,WANG Haitao1(1.State Key Laboratory of Coastal and Offshore Engineering,Dalian University of Technology,Dalian 116024,China;2.College of Civil Engineering,Ludong University,Yantai 264025,China);Section stress analysis of continuous bridge cantilever construction[J];建筑结构学报;2008-S1
【Co-references】
Chinese Journal Full-text Database 10 Hits
1 LIU Li-xian MA Guo-lu ZHAO Deng-feng(Southwest University of Science and Technology,Mianyang 621010);Grid Division of ANSYS and Application Based on APDL[J];重庆科技学院学报(自然科学版);2008-05
2 Zhao Yunpeng,Wang Jinfeng,Yu Shiquan,Huang Zubo(Northeast Forestry University,Harbin 150040);The Temperature Deformation Velocity Study in Zhaosong Songhuajiang Extra Large-Scale Bridge Altitude Control[J];森林工程;2006-05
3 GONG Yaqi,LIU Xiaohu,YANG Wenbing(Hua Zhong University of Science and Technology,School of Civil Engineering & Mechanics,Wu Han,430074);Bridge Parametric Modeling Based on ANSYS[J];中南公路工程;2006-04
4 ZHOU Mi~(1,2),SONG Yi-fan~1,ZHAO Xiao-xing~1(1.Key Laboratory for Bridge and Tunnel of Shaanxi Province,Chang'an University,Xi'an 710064,China;2.State Key Laboratory for Disaster Reduction in Civil Engineering,Tongji University,Shanghai 200092,China);Control technique for construction of pre-stressed-concrete cantilever casting bridge[J];长安大学学报(自然科学版);2005-06
5 YU Hui,CAO Ming-xu (Research Institute of Jiangsu Province,Nanjing 210017,China );Flexibility Calculation of Continuous Beam Bridge of Prestreessed Concrete in Cantilever Segmental Construction Method[J];现代交通技术;2005-04
6 ZHANG Xie-dong~1, ZHAN Hao~1, SHU Hong-bo~1, DONG Xi-qiang~2(1. School of Transportation, Wuhan University of Technology,Wuhan 430063, China; 2. Shanghai Municipal Engineering Design and Research Institute, Shanghai 200092, China);Research of Closure Construction Techniques for Long-Span Prestressed Concrete Continuous Girder Bridge[J];桥梁建设;2005-02
7 Chen Hui Zhong;Discussion on the Support System of Structure Transition Plate in the High-rise Building[J];福建建设科技;2003-04
8 WANG Li-tao (Dept. of Mech.Engn. , Anhui University of Technology and Science, Wuhu 241000,China);Application skills of ANSYS——a general finite element analysis software package[J];安徽工程科技学院学报(自然科学版);2003-03
9 LIU Dai quan 1,LONG Zheng cong 1,WANG Jie jun 2,LI Quan lin 2 (1. Hunan Expressway Administration Bureau,Changsha 410001, China; 2. Civil Engineering College, Hunan University, Changsha 410082, China);Construction Control of PC Continuous Rigid Frame Bridge[J];公路;2003-01
10 Zhu Deju(Northeast Forestry University, Harbin 150040, P. R. China); Yu Zhe(Harbin Civicism Second Company);The Altitude Control of Long Span Prestressed Continuous Frame Bridge[J];东北林业大学学报;2002-06
【Secondary References】
Chinese Journal Full-text Database 10 Hits
1 SU Peng;Shanxi Transportation Research Institute;;Cantilever Construction Monitoring and Stability Analysis of High Pier Continuous Steel Bridges[J];水利与建筑工程学报;2016-03
2 DENG Hui;HUANG Shao-man;WAN San-jian;Jiujiang City Highway Administration Bureau directly under;;On continuous rigid frame bridge construction management control points analysis[J];黑龙江交通科技;2015-04
3 SHAN Xu;;The Bridge Type Selection of a Newly Built Passenger Dedicated Line Straddling Wuhan-Guangzhou Passenger Dedicated Line[J];铁道勘察;2014-05
4 DAI Gong-lian;WANG Wei-min;LIU Ke;School of Civil Engineering,Central South University;;Comparison of Closure Schemes for Railway Concrete Continuous Girder Based on Deformation[J];桥梁建设;2014-04
5 CHEN Wei 1 SHEN Changjiang 1 TANG Deyan 2(1 Faculty of Information Engineering,China University of Geosciences,388 Lumo Road,Wuhan 430074,China;2 School of Information Science and Engineering,Hunan University,252 South Lushan Road,Changsha 410082,China);The Adjustment of Deflection Parameters in the Prestressed Continuous Beam Model[J];测绘地理信息;2013-04
6 TIAN Qing;Design of 50 + 82 + 82 + 50 Meters Intercity Railway Continuous Beam China Railway Engineering Consultants Group,Co. Limited[J];铁道勘察;2013-03
7 MA Song-song YU Cong-cong(School of Civil Engineering & Architecture,Chongqing Jiaotong University,Chongqing 400074,China);PC continuous rigid frame bridge construction monitoring[J];山西建筑;2013-17
8 LI Yong-qin(Shanxi Vocational & Technical College of Construction,Taiyuan,Shanxi 030006,China);The Safety Accident Analysis and Prevention of Prestressed Concrete Continuous Beam Cantilever Casting Construction[J];山西交通科技;2012-05
9 LIU Ming(Hebei Provincial Communications Planning and Design Institute,Shijiazhuang 050011,China);Monitoring and Control Technology for Cantilever Construction of Prestressed Concrete Bridge[J];交通标准化;2012-16
10 ;Research on Stress Monitoring of Cantilever of Prestressed Continuous Bridge[J];安徽建筑;2012-01
【Secondary Citations】
Chinese Journal Full-text Database 2 Hits
1 Chen Dewei Zheng Xinguang Xiang Haifan (Tongji University);A CONSTRUCTION CONTROL SYSTEM FOR P.G.CABLE-STAYED BRIDGES[J];土木工程学报;1993-01
2 Lin Yuanpei;APPLICATION OF KALMAN'S FILTERING METHOD TO CABLE STAYED BRIDGE CONSTRUCTION[J];土木工程学报;1983-03
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved