Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Water Resource & Hydropower of Northeast China》 2005-09
Add to Favorite Get Latest Update

Influence of flood forecast error to flood control forecast operation

ZHOU Hui-cheng,YAN Jun-xia,WANG Ben-de  
The paper studies the influence of flood forecast error to flood control forecast operation of Biliuhe reservoir from two angles of flood gross amount and flood process,among them,flood gross amount study based on normal flood forecast error and based on distribution low of forecast error,reaches some conclusions,and puts forward some propositions for flood forecast error study.
【Fund】: 国家自然科学基金资助项目(50479056);; 教育部科学技术研究重点项目(01054)
【CateGory Index】: TV124
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【References】
Chinese Journal Full-text Database 2 Hits
1 YU Song1) LUO Wensheng2) LI Lihong2,3)(1)College of Water Sciences,Key Laboratory for Water and Sediment Sciences of Ministry of Education,Beijing Normal University,100875,Beijing,China;2)National Key Laboratory of Water Resources and Hydropower Engineering Science,Wuhan University,430072,Wuhan,China;3)Immigration Office of Sichuan Province,610017,Chengdu,China);REAL TIME RESERVOIR DISPATCHING WITH CONSIDERATION OF FORECASTING ERROR[J];Journal of Beijing Normal University(Natural Science);2009-Z1
2 FAN Zi-wu1,2,JIANG Shu-hai1,2(1.Nanjing Hydraulic Research Institute,Nanjing 210029,China;2.State Key Laboratory of Hydrology-Water Resources and Hydraulic Engineering,Nanjing 210029,China;Estimation of risk rate for dynamic control of reservoir limited water level during flood season[J];Hydro-Science and Engineering;2009-03
【Citations】
Chinese Journal Full-text Database 4 Hits
1 Zuo Baohe;Analysis of Error Distribution Feature in the Real-time HydrologicForecast Procedure[J];JOURNAL OF NORTH CHINA INSTITUTE OF WATER CONSERVANCY AND HYDROELECTRIC POWER;1997-02
2 ZHONG Pingan(College of Water Resources and Environment, Hohai Univ., Nanjing 210098, China);Study on limit levels for flood control[J];Journal of Hehai University (Natural Sciences );2002-06
3 QIU Rui-tian~1, WANG Ben-de~2, ZHOU Hui-cheng~2(1. Headquarter of National Flood Control and Drought Alleviation, Beijing 100053, China;2. School of Civil and Hydraulic Engineering, Dalian University of Technology, Dalian 116024, China);New idea for controlling  the limited elevation of reservoirs in the flood season[J];Advances In Water Science;2004-01
4 Zhu Xingming, An Bo, Wang Chengming, Lu Yuzhong, Hu Yufeng(Institute of Water Conservancy & Hydroelectric Power Research);Error Analysis of Real-time Flood Forecasting in Reservoir[J];HYDROLOGY;1997-06
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 LIU Zhuo-ye et al(Waterway and Water Conservancy Administration Bureau of Water Department,Shenyang,Liaoning 110003);Rosearch on the Dispatching Process in Reservoir Flood Prevention[J];Journal of Anhui Agricultural Sciences;2007-03
2 DONG Si-hui1, ZHOU Rong2, ZHOU Hui-cheng3(1 School of Environment Science and Engineering, Dalian Jiaotong University, Dalian 116028, Liaoning, China; 2 School of Management, Dalian Jiaotong University, Dalian 116028, Liaoning,China; 3 School of Civil and Hydraulic, Dalian University of Technology, Dalian 116024, Liaoning, China);Risk analysis on downstream of a reservoir when the flood control method is used: a case of Shenwo Reservoir[J];Journal of Safety and Environment;2006-02
3 CHEN Wei-gang(The Hydrology and Water Resource Bureau of Chuzhou,Chuzhou 239000,China);The automatic measure system of the flood management and regimen of Huanglishu Reservoir[J];Journal of Anhui Technical College of Water Resources and Hydroelectric Power;2005-02
4 SUN Shou-guo,et al.(School of Water Conservancy & Environmental Engineering,Changchun Institute of Technology,Changchun 130012,China);Application of excel runoff foresting[J];Journal of Changchun Institute of Technology(Natural Sciences Edition);2006-02
5 DONG Qian-jin1,WANG Xian-jia1,JI Hai1,WANG Jian-ping2(1.System Engineering Institute of Wuhan University,Wuhan 430072,China;2.School of Economics and Management of China Three Gorges University,Yichang 443002,China);MULTI-OBJECTIVE DECISION MAKING EVALUATION MODEL FOR FLOODWATER UTILIZATION IN THREE GORGES RESERVOIR[J];Resources and Environment in the Yangtze Basin;2007-02
6 FENG Ping~1 XU Xiang-guang~(1,2) LI Hai~1 (1.School of Civil Engineering,Tianjin University,Tianjin 300072,China;2.Commission of Haihe River Basin,Tianjin 300170,China);METHOD TO DIVIDE FLOOD SEASON BASED ON THE FUZZY SET ANALYSIS AND ITS APPLICATION[J];Resources and Environment in the Yangtze Basin;2008-03
7 JIANG Hao~1 KE Feng-hua~2 ZUO Zhen lu~1 1. Nanjing Automation Research Institute,Nanjing 210003,China 2. Wan'an Hydropower Plant,Wan'an 343800,China;Dynamic Risk Dispatching Model for Intercepting and Storing Flood Tail[J];Dam Observation and Geotechnical Tests;2005-06
8 ZHAO Yunfa, LIU Zhiwu, ZHANG Jishun (Three Gorges Cascade Dispatching & Communication Center, Yichang 443133, China);Discussion on Dynamic Limited Flood Water Level Control of Three Gorges Reservoir[J];Hydropower Automation and Dam Monitoring;2007-01
9 ZHONG Gang, WANG Diao-wu; XU Hai-jun;Analysis of flood control operation risk of Liaohe river basin in the year 2005[J];Water Resources & Hydropower of Northeast China;2006-10
10 WANG Kui-feng;Application and comparison of two runoff producing models in north region[J];Water Resources & Hydropower of Northeast China;2006-12
China Proceedings of conference Full-text Database 1 Hits
1 DING Tao LOU Yue-ping MA Xiao-bing (Zhejiang Institute of Hydraulic & Estuary,Hangzhou 310020,China);Research on Flood Water Resources Utilization in Littoral Plain River Networks[A];[C];2007
【Co-references】
Chinese Journal Full-text Database 10 Hits
1 TAN Ge~1, XIA Jun~1, LI Xin~2(1. Institute of Geographical Sciences and Natural Resources Research, Chinese Academy of Sciences, Beijing 100101, China;2. Cold and Arid Regions Environmental and Engineering Research Institute, Chinese Academy of Sciences, Lanzhou Gansu 730000, China);Hydrological Prediction in Ungauged Basins[J];Journal of Glaciology and Geocryology;2004-02
2 FANG Hong1, ZHENG Wen-rui2 (1. Department of maths. Huazhong Agricultual University, Wuhan 430070, China; 2. College of Maths. Jilin University, Changchun 130012,China);A Fuzzy Neural Network Method in Runoff Forecast[J];Journal of Jiling University (Earth Science Edition);2004-S1
3 SONG Bang- ke, XU Yu- ying;Study on risk analysis method for automatic measure and forecast system of reservoir rain regime[J];Water Resourse & Hydropower of Northeast China;2001-03
4 LI Fu-wei, DING Wen - chang;Analysis of Hunjiang river runoff characteristics in Huanren reservoir[J];Water Resourse & Hydropower of Northeast China;2001-06
5 HU Yu-feng;Analysis of real time flood forecast error cause in reservoir basin[J];Water Resourse & Hydropower of Northeast China;2002-01
6 XU Peng,WANG Guo-li;Application of flood classification forecast in flood control operation of Qinghe reservoir[J];Water Resources & Hydropower of Northeast China;2007-06
7 WANG Zhao-hong~1,QIU Wan-hua~1,LEUNG Mei-yung~2(1.School of Economics and Management,Beijing University of Aeronautics & Astronautics,Beijing 100083,China;2.Department of Building and Construction,City University ofHong Kong,Hong Kong,China);Applying Optimized Entropy Weight Model of Multicriteria Decision-making to Post-occupancy Evaluation[J];Journal of China University of Geosciences(Social Sciences Edition);2006-03
8 HAO Fanghua, CHEN Liqun, LIU Changming, ZHANG xuesong(Institute of Water Sciences, Beijing Normal University; 00875, China);Model Output Uncertainty Due to Spatial Variability of Rainfall[J];Progress In Geography;2003-05
9 JIN Ju liang 1, WEI Yi ming 2, DING Jing 3 (1.School of Civil Engineering, Hefei University of Technology,Hefei, Anhui 230009; 2. Institute of Policy & Management,Chinese Academy of Sciences,Beijing 100080; 3. College of Hydro elect;Application of Projection Pursuit Threshold Regressive Model for Predicting Annual Runoff[J];Scientia Geographica Sinica;2002-02
10 ZHOU Hui-cheng,LI Li-qin,WANG Ben-de(School of Civil and Hydraul.Eng.,Dalian Univ.of Technol.,Dalian 116024,China);Maximum entropy method used in error distribution of flood forecast[J];Journal of Dalian University of Technology;2007-03
【Secondary Citations】
Chinese Journal Full-text Database 10 Hits
1 // by Ju Zangshan, Liu Shihua, Yang jie and Kan Wenwei// Nanwan Reservoir Authority;Research on applied decision-making consultation about venture dispatch of Nanwan Reservoir[J];Large Dam and Safety;2002-02
2 Jia Dongxu(Northeast China Power Dispatching and Communication Center, Shenyang 110006, China);METHOD OF IMPROVING WATER POWER UTILIZATION RATE AT HYDROPOWER STATIONS[J];Dam Observation and Geotechnical Tests;2002-02
3 Cheng Chuntian;Wang Bende(Dept.of Givil Engineering,Daltan University ofTechnology,Dalian 116023 );FEASIBILITY ANALYSIS OP SHORT-TERM PRECIPITATION PORECAST OF METEOROLOGY IN RESERVOIR FLOOD OPERATION[J];EXPLORATION OF NATURE;1994-04
4 Zuo Baohe;Analysis of Error Distribution Feature in the Real-time HydrologicForecast Procedure[J];JOURNAL OF NORTH CHINA INSTITUTE OF WATER CONSERVANCY AND HYDROELECTRIC POWER;1997-02
5 Gao Geming(Jiangxi Province Electric Power Designing Institute Nanchang 30006)Chen Huiyuan Wan Jun(Wuhan Hydraulic and Electric Power University Wuhan 430072);RISK ANALYSIS OF BAIPENZHU RESERVOIR INTERCEPTING AND STORING FLOOD TAIL[J];JIANGXI HYDRAULIC SCIENCE & TECHNOLOGY;1997-04
6 Shi Guoning(Chinese Academy of Meteorological Science, Beijing 100081);The Cognitive and Socioeconomic Motivations for Probabilistic Weather Forecasting[J];Meteorological Monthly;1996-05
7 WAN Jun 1 CHEN Hui yuan 1 YANG Xiao dong 1 GAO Ge ming 2 (1.Dept. of Water Resource and River,Wuhan University of Hydraulic and Electric Engineering,Wuhan 430074,China; 2.Jiangxi Electric Design Institute,Nanchang 330006,China.);Risk Analysis of Water Accumulation in Flood Season for Baipenzhu Reservoir[J];HYDROELECTRIC ENERGY;2000-01
8 LI Wan xu (Shiquan Waterpower Station, Shiquan Shanxi 725200, China);Basic Process of Risk Scheduling[J];Hydroelectric Energy;2002-01
9 Huang Zhizhong;Zhou Zhihao(Hohai University, Nanjing, 210024);STUDY ON THE LARGE-SCALE AND MULTIOBJECTIVE DECISION MAKING MODEL OF MULTIRESERVOIR SYSTEMS FOR REAL-TIME FLOOD OPERATION[J];INTERNATIONAL JOURNAL HYDROELECTRIC ENERGY;1994-04
10 Fu Xiang Ji Changming (Wuhan University of Hydraulic and Electric Engineering, Wuhan, 430072);STUDY ON THE MAXIMUM FLOOD HAZARD RISK RATE IN RESERVOIR FLOOD SEASON OPERATION[J];HYDROELECTRIC ENERGY;1998-02
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved