JFY-3 on-line partial discharge monitoring system for power transformers

LI Fu\|qi, JIANG Lei, LIN Du, ZHU De\|heng, TAN Ke\|xiong, XIE Liang\|pin (Department of Electrical Engineering, Tsinghua University, Beijing 100084, China)  
JFY\|3 on\|line partial discharge monitoring system for power transformers is developed to continuously monitor several power transformers with the functions of failure reminiscence, fault alarm and discharge point locating, etc. The features of developed multiple channels data acquisition setup facilitate the further use of digital signal processing methods. In order to locate the discharge source the electrical and ultrasonic signals of discharge are simultaneously monitored. Network technologies are used to carry out the communication between detecting system near transformers and upper stage computer to improve the reliability and performance of monitoring system itself. With satisfactory scalability and flexibility, the system has been put into operation on site.
【Fund】: 国家自然科学基金会;; 东北电力集团公司资助项目! (596 372 0 0 )
【CateGory Index】: TM835.4
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【References】
Chinese Journal Full-text Database 7 Hits
1 LI Xiao-gang1,WEI Jian-jun2,YANG Wen-hu3,LIAO Yan-qun3(1.Changchun UHV Bureau,Changchun 130000,China;2.XJTUSP Boyuan Electric Corporation,Xi'an 710054,China;3.Xi'an Jiaotong University,Xi'an 710045,China);Application of Portable PD On-Line Monitoring Device to 500kV Substation[J];Transformer;2007-03
2 HE Hang-wei, LIN Du, ZHU De-heng (Department of Electrical Engineering, Tsinghua University, Beijing 100084, China);Power equipment monitoring system and remote network communication components[J];Advanced Technology of Electrical Engineering and Energy;2002-03
3 WANG Tao1,HUANG Yue-hua1,HE Jing-liang1,WANG Yong 2,WEI Jian-jun 2,XU Yang 3(1.Fuxin Power Supply Company,Fuxin 123000,China; 2.XJTUSP Boyuan Electric Corporation,Xi'an 710054,China;3.XJTU State Key Laboratory of Electrical Insulation and Power Equipment,Xi'an 710049,China);Application of anti-interference techniques to on-line partialdischarge monitoring of power transformer[J];Electric Power Automation Equipment;2007-02
4 ;A Digital on-line Partial Discharge Monitoring System for Power Transformers[J];High Voltage Engineering;2002-07
5 ;Study of Large-scale Magnetic Core Current Sensors for Partial Discharge[J];High Voltage Engineering;2002-09
6 ;Rejection for Periodical Narrow-band Noises of On-site PD Monitoring Signals[J];High Voltage Engineering;2003-04
7 ZHANG Zhidong,SONG Jiancheng(College of Electrical and Power Engineering,Taiyuan University of Technology,Taiyuan 030024,Shanxi Province,China);Development of Pulse Current Sensor for On-Line Monitoring of Partial Discharge in Dry-Type Transformer[J];Power System Technology;2011-02
【Citations】
Chinese Journal Full-text Database 2 Hits
1 Jin Xianhe Zhu Deheng Tan Kexiong (Qinghua University);The Frequency Spectra of Acoustic Emission During Partial Discharge in Power Transformer Insulation[J];Transactions of China Electrotechnical Society;1989-04
2 Dong Xuzhu, Wang Zhongdong, Jing Weihong, Wang Changchang, Hao Dezhi  , Ma Weiping  Department of Electrical Engineering, Tsinghua University, Beijing 100084; Jilin Electric Power Test and Research Institute, Changchun 130021;Fixed on line monitoring system for power transformers[J];JOURNAL OF TSINGHUA UNIVERSITY(SCIENCE AND TECHNOLOGY);1997-09
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 GAO Ning,GAO Wen?sheng,LI Fu?qi,ZHU De ?heng (Tsinghua University,Beijing100084,China);Analysis of On-Site Noise in Partial Discharge Monitoring of Power Transformer[J];Transformer;2002-S1
2 CHEN Ming-zhong,NI Yong-hong (Yangzhou Polytechnic Institute,Yangzhou 225127,China);On-Line Monitoring and Diagnosis System for Transformer Based on Web[J];Transformer;2008-07
3 Wang Changchang Kuang Jinbo Tan Kexiong Jin Xianhe Zhu Deheng (Qinghua University);The Study of Signal Transmission System for On-Line Detecting Partial Discharge in Electrical Equipment[J];Transactions of China Electrotechnical Society;1992-01
4 Tan Kexiong Liu Hao Zhu Deheng Wang Changchang (Qinghua University);Computer-Aided System for Measuring Electric and Acoustic Signals of Partial Discharge[J];Transactions of China Electrotechnical Society;1992-02
5 LUO Ri-cheng , LI Wei-guo , LI Cheng-rong , XIONG Hao , CHANG Guang-hui ( Wuhan University, Wuhan 430072, China) ( North China Electric Power University, Beijing 102206, China);Ultrasonic Localization of Partial Discharge in Power Transformer Based on Improved Particle Swarm Optimization[J];Automation of Electric Power Systems;2005-18
6 LUO Ri-cheng1,2,LI Wei-guo1, XIONG Hao1,DENG Ben-zai2 (1.School of Electrical Engineering,Wuhan University,Wuhan 430072,Hubei Province,China; 2.School of Electrical Engineering,Changsha Science and Engineering University, Changsha 410077,Hunan Province,China);DEVELOPMENT OF ON-LINE MONITORING SYSTEM FOR PARTIAL DISCHARGE WITHIN POWER TRANSFORMER[J];Power System Technology;2004-16
7 Zhu Deheng, Tan Kexiong, Wang Changchang, Jin Xianhe, Li Fuqi;Computer-Aided On-Line Detection System for Detecting Partial Discharge in Power Transformer[J];High Voltage Engineering;1992-01
8 ;Analysis of On-site Noise for Partial Discharge Monitoring of Power Transformer[J];HIGH VOLTAGE ENGINEERING;2000-02
9 ZHAO Cai - hong, Jiyuan Vocational and Technical College, Jiyuan 454650, Henan, China;Analysis of Field Interference from a Transformer's Partial Discharge under Operation[J];Journal of Jiyuan Vocational and Technical College;2004-04
10 LI Fuqi, JIANG Lei, ZHU Deheng, TAN Kexiong Department of Electrical Engineering, Tsinghua University, Beijing 100084, China;New stationary on line discharge monitoring system for power transformers[J];JOURNAL OF TSINGHUA UNIVERSITY(SCIENCE AND TECHNOLOGY);1999-07
【Co-references】
Chinese Journal Full-text Database 10 Hits
1 XIA Ming-chao1,HUANG Yi-zhuang2,WU Jun-yong1(1.School of Electrical Engineering,Beijing Jiaotong University,Beijing 100044,China;2.Department of Electrical Engineering,Tsinghua University,Beijing 100084,China);Development and Current Situation of Substation Automation System[J];Journal of Beijing Jiaotong University;2007-05
2 JING Feng feng PANG Yan bin (College of Information Science and Technology, Beijing University of Chemical Technology, Beijing 100029, China);Real-time monitoring and control design based on Web[J];Journal of Beijing University of Chemical Technology;2003-03
3 ZHANG Feng ying, WANG Yu guang (Taiyuan Transformer Works., Taiyuan 030021, China);Ultrasonic Position Setting Measurement on Partial Discharge of Power Transformer[J];TRANSFORMER;2000-02
4 LIU Xian-yong, ZHOU Fang-jie(1.Beijing Institute of Technology, Beijing 100081, China; 2.Ningbo On-line Monitoring Systems Co., Ltd.,Ningbo 315800, China);Research on On-Line DGA with FTIR[J];Transformer;2002-06
5 LIU Hui 1 ,SUONAN Jia?le 1 ,SONG Guo?bing 1 ,LUO Jun?ming 2 (1.Xi'an Jiaotong University,Xi'an710048,China;2.Pingliang Electric Power Bureau,Pingliang744000,China);Dynamic Modeling Based on Transformer Top Oil Temperature[J];Transformer;2002-09
6 GUAN Gen?zhi,HE Jing?liang (Wuhan University,Wuhan430072,China);On-Line Insulation Monitoring Techniques and Condition Maintenance of Electric Equipment[J];Transformer;2002-S1
7 HUANG Sheng?jie 1 ,YAO Wen?bing 1 ,CHEN Chun?sheng 1 ,MEI Gang 1 ,MA Zhi ?liang 1 ,TANG Mei?yun 2 (1.Wuhan High Voltage Institute,Wuhan430074,China;2.Hunan Electric Power Test Institute,Changsha410007,China);Location Technique of PD On-Line Monitoring of Transformers in Substation[J];Transformer;2002-S1
8 WANG Xiao-rong 1 ,YANG Min-zhong 2 ,YAN Zhang 2 (1.China Electric Power Science Institute,Beijing100085,China;2.Xi'an Jiaotong University,Xi'an710049,China);Situation and Prospect of Anti-Interference Analysis in PD Test of Electric Equipment[J];Transformer;2002-S1
9 YANG Qi-ping1, XUE Wu-de1, LAN Zhi-da2(1.Shanghai Institute of Electric Power, Shanghai 200090, China; 2.East China Electric Power Test & Research Institute, Shanghai 200437, China);Aging Diagnosis and Expected Life Assessment for Transformer Insulation[J];Transformer;2004-02
10 SHANG Li-ping1, CAO Tie-ze1,2, LIU Xian-yong2,3, ZHOU Fang-jie2(1. Yanshan University, Qinhuangdao 066004, China; 2.Ningbo On-line Monitoring System Co., Ltd, Ningbo 315800, China; 3.Beijing Institute of Technology, Beijing 100081, China);Summary of On-Line Chromatograph Monitoring for Dissolved Gasses in Transformer Oil[J];Transformer;2004-08
【Secondary References】
Chinese Journal Full-text Database 10 Hits
1 LIU Hua-chang (Institute of Electronic Engineering of CAEP,Mianyang 621900,Sichuan,China);Anti-interference design for high voltage capacitor PD detection under DC[J];Electrical Measurement & Instrumentation;2008-07
2 CHANG Hong~1, RU Feng~2, XUE Jun-yi~1(1. School of Electrical Engineering, Xi'an Jiaotong University, Xi'an 710049, China;2. Jiangsu Provincial Electric Power Research Institute, Nanjing 210036, China);Interoperability analyses and system implement to IEC61850 semantic information model[J];Advanced Technology of Electrical Engineering and Energy;2005-03
3 XIONG Wei-hua, ZHAO Guang-zhou, LI Xiao-run (College of Electrical Engineering,Zhejiang University, Hangzhou 310027, China);Extracting Partial Discharge Signals Using AGR[J];Proceedings of Electric Power System and Automation;2005-01
4 ;Study of Large-scale Magnetic Core Current Sensors for Partial Discharge[J];High Voltage Engineering;2002-09
5 ZHOU Qian~1, TANG Ju~1, WEI Gang~2, TANG Shiyu~2(1. The Key Laboratory of High Voltage Engineering and Electrical New Technology, Ministry of Education, Chongqing University, Chongqing 430030, China; 2. Chongqing Power Ultra-high Voltage Bureau, Chongqing 430030, China);Periodicity Narrowband Interference Suppression Using Soft-Hard Filter[J];High Voltage Engineering;2005-07
6 SHEN Xiaojun~ 1 , JIANG Xiuchen~ 1 , BAI Jianshe~ 1 , DA Shipeng~ 2 , ZENG Yi~ 1 , XU Peng~ 1 (1. Dept. of Electrical Engineering, Shanghai Jiaotong University, Shanghai 200030, China; 2. Shanghai Subway Management Co. Ltd, Shanghai 200031, China);Research of Interference in On-line Discharge Detection in 1500 V Subway Direct Current Cable[J];High Voltage Engineering;2006-10
7 GUO Liang1,HUANG Hong-xin2,CHENG Yong-hong1,CHEN Xiao-lin1,MENG Yong-peng1(1.State Key Laboratory of Electrical Insulation and Power Equipment,Xi'an Jiaotong University,Xi'an 710049,China;2.Hangzhou Electric Power Company,Hangzhou 310009,China);Design of Digital Filter Used in Embedded Measuring System of PD[J];High Voltage Engineering;2007-08
8 YANG Ting-fang1,2,LIU Pei1,LI Jing-lu2,HU Yi3(1.School of Electrical and Electronic Engineering,Huazhong University of Science and Technology,Wuhan 430074,China;2.School of Electrical and Information Engineering,Changsha University of Science and Technology,Changsha 410076,China;3.Wuhan High Voltage Research Institute of SGCC,Wuhan 430074,China);New Fault Diagnosis Method of Power Transformer by Combination of FCM and IEC Three-ratio Method[J];High Voltage Engineering;2007-08
9 WU Peng, CHEN Zhi-yong, LI Rui-hua, GAO Nai-kui, XIE Heng-kun(State Key Laboratory of Electrical Insulation for Power Equipment, Xi'an Jiaotong University, Xi'an 710049, China);Experimental Research on Typical PD Models for Power Transformers[J];High Voltage Apparatus;2004-03
10 LIU Shuang-bao,LV Chao,WANG Li-xin,YU Ji-lai(School of Electrical Engineering and Automation,Harbin Institute of Technology,Harbin 150001,China);Depression of Narrowband Interference in Partial Discharge Signals of Transformers with Combined Generalized Morphological Filters[J];High Voltage Engineering;2009-09
China Proceedings of conference Full-text Database 3 Hits
1 LIU Hua Chang,YU Cheng Rong,RAN Han Zheng,HECheng Ji (the Institute of Electronic Engineering of CAEP,SiChuan MiangYang 621900);The analysis of anti-interference for High Voltage Capacitor PD detection under DC[A];[C];2005
2 FENG Xiao-hong Jiangsu Haian Power Supply Company,Haian 226600,China;On-Line Monitoring Technology of digital substation[A];[C];2008
3 Peng Fadong Li Peizhun Guo Liang Yan Li Chen Yu Cheng Yonghong (State Key Laboratory of Electrical Insulation and Power Equipment,Xi'an Jiaotong University,Xi'an 710049,China);High-precision Clock Synthesizing Technique of Parallel Acquisition Unit Based on FPGA Technology[A];[C];2007
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved