Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Advanced Technology of Electrical Engineering and Energy》 2008-04
Add to Favorite Get Latest Update

A combined algorithm for reactive power optimization of distribution network

DANG Ke~1,WANG Dan-hua~1,DANG Tong~2(1.Northeast Dianli University,Jilin 132012,China;2.Chengdu Waste-to-Energy Co.,LTD,Chengdu 610108,China)  
The simple genetic algorithm is constrained by its poor converging performance and readily leads to local optimization.So in this paper,a combined GA,which can retain the advantages of GA,simulated annealing(SA) and tabu search(TS),is introduced.At first,according to the value of individual fitness the adaptive crossover and adaptive mutation are performed,and heuristic border upon mutation can speed up the anagenesis.Thus the diversity of group is increased and the local optimum can be avoided by simulated annealing.Then the tabu search with a specifical probability is used to improve the local search capacity.To improve the computation speed and accuracy,decimal integer encoding and reserving the elitist are adopted.One real system is used to test the performance of the combined genetic algorithm.Test results show that the hybrid genetic algorithm possesses following advantages: good computation speed and global convergence and high calculation accuracy.
【Key Words】: distribution network reactive power compensation local mutation combined algorithms
【CateGory Index】: TM714.3
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Citations】
Chinese Journal Full-text Database 8 Hits
1 WANG Zhi-tao,MEI Sheng-wei,HU Wei(Department of Electrical Engineering,Tsinghua University,Beijing 100084,China);Study on hybrid automatic voltage control strategy of substation[J];Advanced Technology of Electrical Engineering and Energy;2006-03
2 LIU Yao-nian,LI Ying-hong,ZHANG Bing-bing,LI Chun-liang(School of Electrical Engineering,Northeast Dianli University,Jilin 132012,China);Artificial fish school algorithm for optimal power flow problems[J];Advanced Technology of Electrical Engineering and Energy;2006-04
3 SUN Ying-yun,HE Guang-yu,MEI Sheng-wei(State Key Lab of Power Systems,Dept.of Electrical Engineering,Tsinghua University,Beijing 100084,China);A new optimal power flow algorithm based on filter interior point method[J];Advanced Technology of Electrical Engineering and Energy;2007-02
4 Xu Wenchao Guo Wei (Dept.of Electrical Engineering, Southeast University, Nanjing, 2 10096);SUMMARIZE OF REACTIVE POWER OPTIMIZATION MODEL AND ALGORITHM IN ELETRIC POWER SYSTEM[J];Proceedings of The Csu-epsa;2003-01
5 WANG Zhi-hua1, YIN Xiang-gen1, LI Guang-xi2 (1. School of Electric Power, Huazhong University of Science and Technology, Wuhan 430074, Hubei Province, China; 2. School of Electrical Engineering, Wuhan University, Wuhan 430072, Hubei Province, China);APPLICATION OF PSEUDO-PARALLEL GENETIC ALGORITHM IN REACTIVE POWER OPTIMIZATION[J];Power System Technology;2003-08
6 TAN Tao-liang;ZHANG Yao Electric Power Institute, South China University of Technology, Guangzhou 510640 Guangdong Province, China;REACTIVE POWER OPTIMIZATION BASED ON GENETIC/TABU SEARCH HYBRID ALGORITHM[J];Power System Technology;2004-11
7 LIU Ke-yan1,SHENG Wan-xing2,LI Yun-hua1 (1.School of Automation Science and Electrical Engineering,Beijing University of Aeronautics and Astronautics,Haidian District,Beijing 100083,China;2.China Electric Power Research Institute,Haidian District,Beijing 100085,China);Research on Reactive Power Optimization Based on Improved Genetic Simulated Annealing Algorithm[J];Power System Technology;2007-03
8 ;A Genetic Algorithm With Annealing Selection for Reactive Power Optimization[J];ELECTRIC POWER;1998-02
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 TAO Yu-min(School of Science,University of Science and Technology Liaoning,Anshan 114051,China);Estimation of genome reversal distance with genetic simulated annealing algorithm[J];Journal of University of Science and Technology Liaoning;2009-04
2 LI Lin,BAI Yun(College of Geophysics,Chengdu University of Technology,Sichuan Province,Chengdu 610059,China);Using Simulated Annealing Method in Magnetotelluric Inversion[J];Journal of Anyang Institute of Technology;2011-02
3 JIA Yu-liang,MIAO Li-xin (Graduate School at Shenzhen,Tsinghua University,Shenzhen Guangdong 518055,China);Optimization of Real-Time Storage Location Assignment in Automated Storage and Retrieval System[J];Journal of Beijing Jiaotong University(Social Sciences Edition);2007-04
4 CAO Shouhua,YUAN Zhenzhou,HAN Baoming,LI Dewei(School of Traffic and Transportation, Beijing Jiaotong University, Beijing 100044,China);Classification for Passenger Transport Integrative Hubs Based on SOFM Neural Network[J];Journal of Beijing Jiaotong University;2008-06
5 LI Haodong,HE Shiwei,SONG Rui,JI Lijun,SHEN Yongsheng(School of Traffic and Transportation,Beijing Jiaotong University,Beijing 100044,China);Synthetic Optimization of Train Formation Plan and Layout of Technical Service Station[J];Journal of Beijing Jiaotong University;2010-06
6 ZHAO Bo-wen1,2,YU Yong-gang1,PAN Yu-zhu1(1.School of Energy and Power Engineering,NUST,Nanjing 210094,China;2.The Third Institute of China Aerospace Science and Technology Corporation 8359,Beijing 10089,China);Numerical Simulation and Optimization Design on Annealing Algorithm of Traveling Charge[J];Chinese Journal of Explosives & Propellants;2010-05
7 XIA Zhi-an, ZHAO Ying-jun (College of Missile, Engineering University of PLA Air Force, Sanyuan 713800, China);Model of Equipment Part Replacing Cycle Optimization Based on GA[J];Ordnance Industry Automation;2008-08
8 WANG Wen-feng,LIU Ya-jie,GUO Bo (College of Information System and Management,National University of Defense Technology,Changsha 410073,Hunan,China);Research on the Armaments Repair Support Network Design Problem[J];Acta Armamentarii;2008-12
9 Chen Yunxia Gao Jieping(Dept.of System Engineering of Engineering Technology,Beijing University of Aeronautics and Astronautics,Beijing 100191,China)Xia Huafeng(Dept.of Materials,the Second Academy of China Aerospace Science & Industry Corn,Beijing 100854,China)Zeng Shengkui (Dept.of System Engineering of Engineering Technology,Beijing University of Aeronautics and Astronautics,Beijing 100191,China);Genetic algorithm-based decomposition method for multidisciplinary design optimization[J];Journal of Beijing University of Aeronautics and Astronautics;2009-06
10 Li Shaobao,Zhao Chunxiao(Department of Computer Teaching and Network Information,BUCEA Beijing 100044);Solution for the Maze Game Based on Multi-Agent Genetic Algorithm[J];Journal of Beijing University of Civil Engineering and Architecture;2011-03
China Proceedings of conference Full-text Database 10 Hits
1 ZHENG Liqun,JI Kaiqing,LI Dawei 1.School of Science,University of Science and Technology Liaoning,Anshan 114051,P.R.China 2.Editorial Department,University of Science and Technology Liaoning,Anshan 114051,P.R.China;On Material Dispatch Model in the Emergency Requirements Region[A];[C];2010
2 Li Yingdong He Minghao~* (Department of Microwave Engineering,Wuhan Radar Academy) (*Department of Automation,Tsing Hua University);UCA-MUSIC 2-D DOA EstimatesBased on Genetic Algorithms[A];[C];2001
3 YUAN Wei,SHI Gong-tao,JIANG Yong-mei (School of Electronic Science and Engineering,National University of Defense Technology,Hunan Changsha,410073;);A SAR image registration technique based on ROEWA operator and GA-Powell algorithm[A];[C];2009
4 Ji-Hong Shen~1 Yan Li~2 1 Harbin Engineering University,College of Science,Harbin 150001 2 Harbin Engineering University,College of Automation,Harbin 150001;Light Ray Optimization on Hexagonal Grid[A];[C];2010
5 Feng-Min Lu~1 Jian-Lin Jiang~1 Jin-Peng Xu~1 1 College of Science,Nanjing University of Aeronautics and Astronautics,Nanjing 211100;Partheno-genetic simulated annealing hybrid algorithm for multi-objective anti p-center problem[A];[C];2010
6 Li Zheng-wen Wang Xiu-li Hu Ze-chun (Department of Electrical Engineering,Xi'an Jiaotong University,Xi'an 710049,Shanxi Province.China);A Time-Based Control Strategy for Volt/Var Optimizatin in Distribution Systems[A];[C];2005
7 LI Guo-qing SUN Hao (Northeast Dianli University,Jilin 132012,Jilin province,China);Study of Available Transfer Capability Based on Improved Artificial Fish-swarm Algorithm[A];[C];2007
8 WANG Jiaotuan LI Wei School of Science,Hangzhou Dianzi University,Hangzhou,310018,P.R.China;The Rational Disposition of Sensor Covering Problem[A];[C];2007
9 QIU Wen-qian (Zhejiang Provincial Electric Power Design Institute, Hangzhou310014, Zhejiang Province. China);Algorithm of Electric Power Flow With Scope Restrictions on Varieties and Its Applications[A];[C];2006
10 WANG Cheng YANG Jing ZHANG Qian Department of computer science, Shandong University, 250061, China;An Image Registration Method Based on GA-PSO Algorithm[A];[C];2007
【Co-references】
Chinese Journal Full-text Database 10 Hits
1 Wang Chun1, 2 Cheng Haozhong1 Chen Ken2 (1. Nanchang University Nanchang 330031 China 2. Shanghai Jiaotong University Shanghai 200240 China);Integrated Optimization Algorithm of Dynamic Reactive Power for Distribution System[J];Transactions of China Electrotechnical Society;2008-02
2 Rong Fei Luo An Tang Ci Pan Hongbin (Hunan University Changsha 410082 China);Structure Design of Output Filter in STATCOM and Its Parameter Optimization[J];Transactions of China Electrotechnical Society;2008-04
3 HE Fa-wu(Guangzhou Institute of Railway Technology,Guangzhou 510430,China);Enhanced Fuzzy Linear Programming Method for Economic Load Dispatch of Electric Power Systems[J];Electric Power Science and Engineering;2007-03
4 Liu Mingbo1 ,Cheng Ying2 ,L in Shenghong1 1.South China U niversity of Technology,Guangzhou 5 10 6 40 ,China 2 .Suzhou Power Supply Bureau,Suzhou2 15 0 0 4,China;COMPARATIVE STUDIESOF INTERIOR-POINT LINEAR AND NONLINEAR PROGRAMMING ALGORITHMSFOR REACTIVE POWER OPTIMIZATION[J];Automation of Electric Power Systems;2002-01
5 ZHANG Yong-jun REN Zhen (South China University of Technology,Guangzhou 510640,China);Readjusting Cost of Dynamic Optimal Reactive Power Dispatch of Power Systems[J];Automation of Electric Power Systems;2005-02
6 LIU Ming-bo, YANG Yong(South China University of Technology, Guangzhou 510640, China) (Foshan Branch, Guang-dian Power Grid Group Co Ltd, Foshan 528000, China);Optimal Reactive Power Planning Incorporating Steady State Voltage Stability Constraints[J];Automation of Electric Power Systems;2005-05
7 ZHOU Ren-jun , REN Tie-ping , PENG Gao-hui , LIU Cheng-jun , WEN Lian-hong (1. Changsha University of Science and Technology, Changsha 410077, China) (2. Changsha Electric Power Bureau, Changsha 410015, China);Volt/VAR Optimization Considering Integrated Operation Economy of Distribution System and Equipment[J];Automation of Electric Power Systems;2005-07
8 WANG Xiu-li, LI Zheng-wen, HU Ze-chun (Xi'an Jiaotong University, Xi'an 710049, China );Time-interval Based Comprehensive Control Strategy for Daily Voltage/VAR Optimization in Distribution Systems[J];Automation of Electric Power Systems;2006-07
9 CAI Changchun1,DING Xiaoqun2,WANG Kuan2,SHEN Maoya2,WU Zhen3(1.Hohai University(Changzhou),Changzhou 213022,China;2.Hohai University,Nanjing 210098,China;3.Taixing Power Supply Company,Taizhou 225400,China);Simplified Method of Dynamic Reactive Power Optimization and Its Implementation[J];Automation of Electric Power Systems;2008-05
10 YAN Wei1, TIAN Tian1, ZHANG Haibing1, FU Jin2, MAO Guozhi2, LIU Zhihong2(1. State Key Laboratory of Power Transmission Equipment & System Security and New Technology,Chongqing University, Chongqing 400030, China; 2. Yangjiaping Power Supply Bureau, Chongqing 400051, China);Heuristic Strategy for Dynamic Reactive Power Optimization Incorporating Action Time Constraints Between Adjacent Time Intervals[J];Automation of Electric Power Systems;2008-10
【Secondary Citations】
Chinese Journal Full-text Database 10 Hits
1 BAI Jian she, DONG Hai ying, FAN Bo, XUE Jun yi (College of Electrical Engineering, Xian Jiaotong University, Xian 710049, China);Study of automatic voltage control approach based on fuzzy-expert inference for 500kV substations[J];Advanced Technology of Electrical Engineering and Energy;2003-04
2 LIU Yao-nian, PANG Song-ling, LIU Dai (Northeast China Institute of Electric Power Engineering, Jilin 132012, China );Short-term load forecasting method based on artificial fish-swarm algorithm of neural network[J];Advanced Technology of Electrical Engineering and Energy;2005-04
3 LIU Yao-nian,LI Ying-hong,ZHANG Bing-bing,LI Chun-liang(School of Electrical Engineering,Northeast Dianli University,Jilin 132012,China);Artificial fish school algorithm for optimal power flow problems[J];Advanced Technology of Electrical Engineering and Energy;2006-04
4 GUO Yuan-fan,YANG Feng,DONG Zhao-xia(College of Hydropower and Information Engineering in Huazhong University of Science and Technology,Wuhan 430074,China);Available transfer capability calculation using particle swarm optimization algorithm[J];Advanced Technology of Electrical Engineering and Energy;2006-04
5 Wang Zhengfeng; Xu Xianyong; Tang Zongquan(Hefei University of Technology 230009 China);Optimal Program for Reactive on Electical Market[J];ELECTROTECHNICAL JOURNAL;2000-06
6 Dong yuanhan, Zhang Wanchun (Chendu University of Science & Technology);A NEW LINEAR APPROACH TO THE OPTIMIZATION OF REACTIVE COMPENSATION PLANNING IN LARGE POWER SYSTEMS[J];Automation of Electric Power Systems;1987-05
7 Ju Ping; Wei Zhinong; Dong Feng (Hohai University. 210098. Nanjing. China);SIMULATED EVOLUTIONARY APPROACHES TO COMPOSITE OPTIMIZATION IN POWER SYSTEMS[J];AUTOMATION OF ELECTRIC POWER SYSTEMS;1998-11
8 Liu Yutian, Ma Li(Shandong University of Technology, Ji'nan 250061, China);REACTIVE POWER OPTIMIZATION BASED ON TABU SEARCH APPROACH[J];AUTOMATION OF ELECTRIC POWER SYSTEMS;2000-02
9 Dai Yan1 ,Ni Yixin2 ,Wen F ushuan1 ,H an Zhenxiang1 1.Zhejiang U niversity,Hangzhou3 10027,China 2 .The University of Hong Kong,Hong Kong,China;ANALYSIS OF REACTIVE POWER PRICING UNDER DEREGULATION[J];AUTOMATION OF ELECTRIC POWER SYSTEMS;2000-05
10 Cheng Ying,L iu Mingbo South China U niversity of Technology,Guangzhou 5 10 6 40 ,China;NONLINEAR PRIMAL- DUAL INTERIOR POINT ALGORITHM FOR DISCRETE REACTIVE POWER OPTIMIZATION[J];Automation of Electric Power Systems;2001-09
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved