Optimal Switching Device Placement Based on Niche Genetic Algorithm in Distribution Networks

Wang Yansong Chen Guoming Zhang Jiasheng Zhang Mengmeng (China University of Petroleum Dongying 257062 China)  
Distribution automation systems must be decided upon disconnection switch to improve power supply reliability. Optimal disconnection switch placement is a combinatorial optimization problem with multi-extreme value. The relationship between decrease of outage cost and increase of disconnection switch is explained by analyzing the technology problem of disconnection switch placement in distribution network. The line segment is selected and regarded as controlled variable in order to shorten the length of chromosome and reduce the search scale, in which the disconnection switch is possible placed. It is defined as the niche that the same numerary switches are placed. The niche genetic algorithm is proposed for optimal disconnection switch placement. The local optimal placement is obtained by eliminating through selection or contest in Niche , which is regarded as local extreme value. And then optimal number and placement of disconnection switch is obtained with request reliability after all local extreme value is search with different numerary switches. Test results show that the niche genetic algorithm is suitable for switch placement optimization. The numerical results prove to be a rapid search and good convergent.
【Fund】: 山东省自然科学基金(Y2003F02);; 中国石油大学青年博士基金(Y050503)资助项目。
【CateGory Index】: TM715
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【References】
Chinese Journal Full-text Database 5 Hits
1 Li Yulong Zong Wei Lü Xianyan He Qiuyu Yuan Qihong Wang Qian (North China Electric Power University Key Laboratory of Power System Protection and Dynamic Security Monitoring and Control under Ministry of Education Beijing 102206 China);An Immune Genetic Algorithm Based on Regulating New Definition of Antibody Density for Power System Reactive Power Optimization[J];Transactions of China Electrotechnical Society;2008-02
2 Pan Yiwei (Zhengzhou University);Optimal Planning of Sectionalizing Switches in Distribution Network System[J];Electrotechnical Application;2008-07
3 HUANG Ling,WEN Xi-shan,LAN Lei,YE Wan-qi(School of Electrical Engineering,Wuhan University,Wuhan 430072,China);Optimization of Grading Rings for UHV Composite Insulator by the Improved GA[J];High Voltage Engineering;2009-02
4 WANG Xin-gang1,AI Qian1,XU Wei-hua1,HAN Peng2(1.Electrical Engineering Department,Shanghai Jiao Tong University,Shanghai 200240,China;2.Power Dispatching and Communication Center,Shanxi Electric Power Company,Taiyuan 030001,China);Multi-objective optimal energy management of microgrid with distributed generation[J];Power System Protection and Control;2009-20
5 HAO Wen-bo, YU Ji-lai (Department of Electrical Engineering, Harbin Institute of Technology, Harbin 150001, Heilongjiang Province, China);Distribution Network Reconfiguration Algorithm Basing on Electrical Dissection Information of Load Path[J];Proceedings of the CSEE;2008-19
【Citations】
Chinese Journal Full-text Database 7 Hits
1 Xie Kaigui, Zhou Jiaqi (Chongqing University, Chongqing 400044, China);MODEL FOR OPTIMAL SWITCHING DEVICES BASED ON IMMUNE ALGORITHM IN ELECTRIC DISTRIBUTION NETWORKS[J];Automation of Electric Power Systems;2003-15
2 WANG Sai-yi, WANG Cheng-shan (Tianjin University, Tianjin 300072, China);Optimal Sectioned Switches Placements of Radial Lines in Distribution Network Systems[J];Automation of Electric Power Systems;2005-08
3 SHEN Xiao-dong,LIU Jun-yong,SUN Yi(Department of Electrical Information,Sichuan University,Chengdu 610065,China);Application of improved multi-step optimization algorithm in sectionalizing switch allocation in distribution network[J];Electric Power Automation Equipment;2003-12
4 WANG Dong, SHI Yan-kun, CONG Ji-yuan, SUN Hui, ZOU Ji-yan(Dalian University of Technology, Dalian 116024, China);Application of Catastrophic Genetic Algorithm to the Optimal Configuration of Switching Devices in Distribution System[J];High Voltage Apparatus;2004-03
5 WANG Tian hua 1, WANG Ping yang 2, FAN Ming tian 2 (1.Beijing Creative Distribution Automation CO.LTD,Beijing 100085,China; 2.Electric Power Research Institute China,Beijing 100085,China);OPTIMAL FEEDER AUTOMATION PLANNING USING BINARY PROGRAMMING[J];Proceedings of the Csee;2000-05
6 WAN Guo-cheng, REN Zhen, JING Yong, GAO Zhi-hua (Electrical Power College, South China Univ. of Tech., Guangzhou 510640, China);DEPLOYMENT OF DISCONNECT SWITCHES ON MAIN FEEDER[J];Proceedings of the Csee;2003-04
7 YANG Wen-yu1, LIU Jian1, 2, YU Jian-ming1, DONG Hai-peng2(1. Xi'an University of Technology, Xi'an 710048, China; 2. Xi'an University of Science & Technology, Xi'an 710054, China);Optimal allocation of sectionalizing and loop switches in distribution networks[J];Electric Power;2004-02
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 Yang Wenyu1 Liu Jian1,2 Yu Jianming1 Song Meng1 (1. Xi’an University of Technology Xi’an 710048 China 2. Xi’an University of Science & Technology Xi’an 710054 China);Distribution Network Optimal Planning Based on an Improved prim Algorithm[J];Transactions of China Electrotechnical Society;2005-03
2 0 Yang Wenyu1 Liu Jian1,2 Yu Jianming1 Yan Fei1 (1.Xi’an University of Technology Xi’an 710048 China 2.Xi’an University of Science and Technology Xi’an 710054 China);Distribution Network Flexible Planning Based on Risk Assessment[J];Transactions of China Electrotechnical Society;2005-08
3 Zhu Jianquan Wu Jiekang (Guangxi University Nanning 530004 China);Short-Term Scheduling Optimization of Cascade Hydro Plants Based on Hybrid Particle Swarm Optimization With Probabilistic Analysis[J];Transactions of China Electrotechnical Society;2008-11
4 Pan Yiwei (Zhengzhou University);Optimal Planning of Sectionalizing Switches in Distribution Network System[J];Electrotechnical Application;2008-07
5 LONG Xiao-hui1,LE Xiu-fan1,LUO Dong-liang2,XIANG Han-qi1,LUAN Xin1(1.School of Power Engineering in Hohai University,Nanjing 210098,China;2.Shandong Electric Power Engineering Consulting Institute,Jinan 250013,China);Application of Binary PSO Algorithm to Switch Installing Optimization in Distributing Network[J];Journal of Electric Power;2007-03
6 LEI Shao-lan~1,ZHOU Lin~2,DENG Qun~3,FANG Chong-qiu~4(1.Chongqing Communication College,Chongqing 400035,China;2.Chongqing Mobile Communication Company,Chongqing 400041,China;3.Chongqing Electric Power Company,Chongqing 401147,China;4.Panzhihua College,Panzhihua 617000,China);Distribution Network Reconfiguration Aiming at Equilibrium of Load by Immune Algorithm[J];Electric Power Science and Engineering;2006-03
7 ZHAO Yong-liang~(1,2), CAO Kan~1, XIE Kai-gui~1(1. Key Lab. Of New Technology of HV and Electrician of Education Ministry, School ofElectrical Engineering, Chongqing University, Chongqing 400044, China; 2. Ningxia Guyuan PowerSupply Bureau, Guyuan 756000, China);Application of Reliability Cost-Benefit Method in Optimizing Allocation of Switching Devices in Power Distribution Networks[J];Electrical Equipment;2006-12
8 LIU Jian , YANG Wen-yu (Xi'an University of Technology, Xi'an 710048, China) (Xi'an University of Science & Technology, Xi'an 710054, China);Distribution Networks Expansion Planning Based on Improved Minimum-cost Spanning Tree[J];Automation of Electric Power Systems;2005-17
9 XU Jing1, WANG Chengshan1, LI Xiaohui2, ZHANG Lai2, WU Bin2, XIAO Jun1 (1. Tianjin University, Tianjin 300072, China) (2. Tianjin Electric Power Research Institute, Tianjin 300022, China);Reconstruction Scheme Optimization of Distribution Network Based on Adaptive Genetic Algorithm[J];Automation of Electric Power Systems;2007-14
10 GE Shao-yun1,ZHANG Jing1,CHEN Li-jun2 (1.School of Electrical Engineering and Automation,Tianjin University,Tianjin 300072,China;2.Shantou Power Supply Company,Guangdong Power Grid Company,Shantou 515041,China);Optimization of the Tie Lines in Urban Distribution Network Based on Two-tie Connection Mode[J];Proceedings of the Chinese Society of Universities for Electric Power System and Automation;2007-05
China Proceedings of conference Full-text Database 1 Hits
1 ;单端供电配电线路上分段开关优化配置的研究[A];[C];2007
【Co-references】
Chinese Journal Full-text Database 10 Hits
1 WU Ye-jun~1,JIANG Jian-lin~2(1.Department of Basic Courses,Nanjing Institute of Technology,Nanjing 210013,China;2.Department of Mathematics,Nanjing University,Nanjing 210093,China);A heuristic algorithm for constrained multi-source Weber problem[J];Journal of Anhui University(Natural Sciences);2005-05
2 ZHENG Deling, LIANG Ruixing, FU Dongmei, LI Xiaogong, FANG Tong Information Engineering School, University of Science and Technology Beijing, Beijing 100083, China Material Science and Engineering School, University of Science and Technology Beijing, Beijing 100083, China Taikang Life Insurance Co, Ltd, Beijing 100031, China;Application of Artificial Immune System and Artificial Immune Genetic Algorithm to Optimization[J];Journal of University of Science and Technology Beijing;2003-03
3 WANG Ke ying,ZHANG Guang lie,SHENG Wen li (Department of electric Power Engineering,Northeast China Institute of Electric Power Engineering,Jilin city 132012);Applications of GPS in Transmission Line Fault Location and phasor Measurement[J];JOURNAL OF NORTHEAST CHINA INSTITUTE OF ELECTRIC POWER ENGINEERING;1999-02
4 DONG Ying, TANG Jia-fu, XU Bao-dong, WANG Ding-wei (School of Information Science & Engineering, Northeastern University, Shenyang 110004, China. Correspondent: DONG Ying, E-mail: dy-neu?@?sina.com);Application of Particle Swarm Optimization to Nonlinear Constrained Programming[J];JOURNAL OF NORTHEASTERN UNIVERSITY;2003-12
5 ZHANG Yu1,WU Guang-ya2,ZHANG Rui2(1.Central China Grid Company Limited,Wuhan 430077,China;2.Wuhan High Voltage Research Institute,Wuhan 430074,China);Approach to Key Technology of Line Insulators for 1000 kV a.c.Transmission Line[J];Insulators and Surge Arresters;2006-01
6 Gao Weixin Luo Xianjue (Xi’an Jiaotong University Xi’an 710049 China);A New Distribution Substation Planning Algorithm Based on Hopfield Neural Network[J];Transactions of China Electrotechnical Society;2005-05
7 Wang Haining Su Jianhui Zhang Guorong Mao Meiqin Ding Ming (Research Center of Photovoltaic System Engineering of Ministry of Education Hefei University of Technology Hefei 230009 China );Unitive Control of PV Grid Connected Generation and Reactive Compensation[J];Transactions of China Electrotechnical Society;2005-09
8 He Fang Cai Xingguo (Harbin Institute of Technology Harbin 150001 China);Network Reconfiguration of Shipboard Power System Based on Improved Genetic Arithmetic[J];Transactions of China Electrotechnical Society;2006-09
9 Xu Jingzhou Li Yang (Southeast University Nanjing 210096 China);Reliability Assessment of Complex Distribution System Using GO Method[J];Transactions of China Electrotechnical Society;2007-01
10 Wang Chengshan Xiao Zhaoxia Wang Shouxiang (Tianjin University Tianjin 300072 China);Multiple Feedback Loop Control Scheme for Inverters of the Micro Source in Microgrids[J];Transactions of China Electrotechnical Society;2009-02
【Secondary References】
Chinese Journal Full-text Database 9 Hits
1 SHI Biao1,LI Yu-xia1,YU Xin-hua2,YAN Wang1,HE Chang-sheng1,MENG Xin1 (1.School of Water Resources and Hydraulic Power,Xi'an University of Technology,Xi'an 710048,Shaanxi Province,China; 2.Technical Instisute of High Vocation,Qingdao Science and Technology University,Qingdao 261000,Shandong Province,China);Short-Term Load Forecasting Based on Modified Particle Swarm Optimization and Radial Basis Function Neural Network Model[J];Power System Technology;2009-17
2 Li Qing,Deng Fayu(School of Science,Xidian University,Xi'an 710071,China);Calculation of Potential Distribution of UHV Lines Insulatorstring[J];Electronic Science and Technology;2010-02
3 YAO Gang,WEN Xi-shan,LAN Lei(School of Electrical Engineering,Wuhan University,Wuhan 430072,China);Electric Field of Wet Contamination on Dielectric Surface and Creeping Discharge in Needle-board Electrodes[J];High Voltage Engineering;2010-06
4 ZHANG Qiang,WANG Wei-qing,LI Chang-kai(College of Electrical Engineering Xinjiang University,Urumuqi 830047,China);Effect of Grading Rings for Improving the Electric Field Distribution of Composite Insulators[J];Insulators and Surge Arresters;2010-04
5 WANG Xiu-yun,ZOU Lei,ZHANG Ying-xin,LI Hui,PAN Wen-ming(Electrical Engineering College,Northeast Dianli University,Jilin 132012,China);Reactive power optimization of power system based on the improved immune genetic algorithm[J];Power System Protection and Control;2010-01
6 Zhang Qiang,Wang Wei-qing,Li Chang-kai(College of Electrical Engineering Xinjiang University.Urumqi 830047,China);Improvement of Electric Field Distribution for Composite Insulators[J];North China Electric Power;2010-06
7 WANG Zhe,HE Pei(Institute of Computer and Communication Engineering,Changsha University of Science and Technology,Changsha 410114,China);Application of genetic algorithm with space contraction in TSP[J];Computer Engineering and Design;2009-16
8 LIU Ji-xin, ZHAO Ying-kai (College of Automation, Nanjing University of Technology, Nanjing 210009, China);Path planning of cellular Bayesian decision[J];Computer Engineering and Design;2009-17
9 WANG Lin-ping1,2,JIA Zhen-yuan1,WANG Fu-ji1,ZHAO Guo-kai1(1.Key Lab.for Precision and Non-traditional Machining Technology of Ministry of Education,Dalian Univ.of Technology,Dalian 116024,China;2.School of Electromechanical Automobile Engineering,Yantai Univ.,Yantai 264005,China);Methods of infeasible chromosome conversion[J];Systems Engineering and Electronics;2009-08
【Secondary Citations】
Chinese Journal Full-text Database 10 Hits
1 Wang Tianhua, Wang Pingyang, Fan Mingtian (Electric Power Research Institute, 100085, Beijing, China);AN OPTIMIZATION METHOD OF ALLOCATION OF SECTIONALIZING SWITCH IN LOOPED NETWORK FOR FEEDER AUTOMATION PLANNING[J];AUTOMATION OF ELECTRIC POWER SYSTEMS;1999-15
2 Zhang Yan (Shanghai Jiaotong University. 200030. Shanghai, China);RESEARCH ON COST-BENEFIT ANALYSIS OF ELECTRIC POWER NETWORK RELIABILITY PLANNING[J];AUTOMATION OF ELECTRIC POWER SYSTEMS;1999-15
3 Kang Qingping, Lu Jiming, Yang Guowang(North China Electric Power University. Baoding 071003, China);A METHOD FOR OPTIMIZING THE NUMBER OF SECTIONS OFFEEDER ON 10 kV DISTRIBUTION NETWORK[J];AUTOMATION OF ELECTRIC POWER SYSTEMS;2000-13
4 X ie K aigui1 ,Zhou Ping1 ,Zhou Jiaqi1 ,Sun Yujiang2 ,L ong Xiaoping2 1.Chongqing U niversity,Chongqing 40 0 0 44 ,China 2 .Chongqing Electric Power Com pany,Chongqing40 0 0 14,China;RELIABILITY EVALUATION ALGORITHM FOR COMPLEX MEDIUM VOLTAGE RADIAL DISTRIBUTION NETWORKSBASED ON FAULT- SPREADING- METHOD[J];Automation of Electric Power Systems;2001-04
5 Wang Chengshan 1, Wang Saiyi 1, Ge Shaoyun 1, Xie Yinghua 1, Yin Yexiu 1, Lin Ruixin 2 (1. Tianjin University, Tianjin 300072, China) (2. Fujian Electric Power Investigation and Design Institute, Fuzhou 350000, China);ECONOMY AND RELIABILITY ANALYSIS OF DIFFERENT CONNECTION MODES IN MV DISTRIBUTION SYSTEMS[J];Automation of Electric Power Systems;2002-24
6 Xie Kaigui, Zhou Jiaqi (Chongqing University, Chongqing 400044, China);MODEL FOR OPTIMAL SWITCHING DEVICES BASED ON IMMUNE ALGORITHM IN ELECTRIC DISTRIBUTION NETWORKS[J];Automation of Electric Power Systems;2003-15
7 Wang Chengshan, Wang Saiyi (Tianjin University, Tianjin 300072, China);THE INTELLIGENT PLANNING OF URBAN MID-VOLTAGE DISTRIBUTION NETWORK BASED ON SPATIAL GIS Part Two Automatic Routing of Multi-sectioned and Multi-linked Network[J];Automation of Electric Power Systems;2004-06
8 Bie Zhaohong,Wang Xiuli,Wang Xifan (Xi′an Jiaotong University, Xi′an 710049, China);Reliability Evaluation of Complicated Distribution Systems[J];JOURNAL OF XI'AN JIAOTONG UNIVERSITY;2000-08
9 LI Wei-xing, LI Zhi-min, LIU Ying-chun ( Harbin Institute of Technology, Harbin 150001, China);EVALUATION OF COMPLEX RADIAL DISTRIBUTION SYSTEM RELIABILITY[J];Proceedings of the Csee;2003-03
10 ;Reliability Analysis of Distribution Networks[J];ELECTRIC POWER;1997-05
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved