Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Journal of Guangdong University of Technology(Social Sciences Edition)》 2012-01
Add to Favorite Get Latest Update

A Research on the Methodology in Project Risk Management

DENG Xiu-quan1,ZHANG Di1,CHEN Jun-jie2(1.School of Economics and Management,Beijing University of Aeronautics and Astronautics,Beijing 100191,P.R.China; 2.The Eighteenth Institute of China Academy of Launch Vehicle Technology,Beijing 100076,P.R.China)  
Project information collection and risk management method choice directly affect the effectiveness of risk management.On the basis of existing project risk management,this article presents five channels to collect detailed information on the project from historical statistics,theory,project information and other internal and external sources.Based on several criteria for method choice,it advances a new proposal of constructing method system by combining several methods to achieve more scientific and effective follow-up risk management.According to post-evaluation of risk management,the way to evaluate the methods after project risk management is proposed.Finally,the article,taking the actual risk management in the astronautics project for example,shows the process of information collection and method system establishment as a case of project risk management application.
【Fund】: 国家自然科学基金项目“基于Swarm的企业能力多主体仿真模型与演化机理研究”(70872008);; 航空科学基金项目“基于项目的企业分形应急生产网络理论及其在我国航空企业的应用研究”(2010ZG51076)
【CateGory Index】: F270.7;F426.5
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Citations】
Chinese Journal Full-text Database 10 Hits
1 ZHANG Zi-jian (School of Management, Tianjin University, Tianjin 30072, China);Study on the risk management system of equipment project[J];Ship Engineering;2008-01
2 CAO Zhao-xi1,GUO Peng1,LI Ling2(1.School of Management;2.Scocial Sciences Department,Northwestern Polytechnical University,Xi'an 710072,China);Risk Evaluation for Engineering Project in Its Whole Life Cycle Based on IAF Combinatorial Method[J];Industrial Engineering Journal;2007-03
3 SONG Gui-bao1a,YANG Jin-zhao1b,JI Li-chao2,SONG Heng1b,LUAN Xue-mei3 (1.Naval Aeronautical and Astronautical University a.Department of Airborne Vehicle Engineering;b.Graduate Students' Brigade,Yantai Shandong 264001,China;2.Military Representatives Workgroup of Navy in №7 Research Institute of Astronautical Science and Technology Group,Chengdu 610100,China;3.Yantai Post Office,Yantai Shandong 264001,China);Summarize of Risk Evaluation Methods in the Entire Life Cycle(ELC) of Equipments[J];Journal of Naval Aeronautical and Astronautical University;2010-01
4 Yin Zhijun, Chen Liwen, Wang Shuangzheng, Su Chunsheng (School of Management, Hebei University of Technology, Tianjin 300130,China);Study on The Advance of Project Risk Management in China[J];Optimization of Capital Construction;2002-04
5 ZHU Song-ling, ZHOU Ping, HAN Yi, YANG Hai-cheng h., Northwestern Polytechnical Univ., Xi'an710072, China);Research on risk analysis based on fuzzy AHP method[J];Computer Integrated Manufacturing Systems;2004-08
6 JIANG Ji-jiao, YANG Nai-ding , ZHU Zhi-ming (Sch. of Management, Northwestern Polytechnical Univ., Xi'an710072, China);Research on aviation enterprise integrated risk management system based on projects[J];Computer Integrated Manufacturing Systems;2005-01
7 WANG Hong-wei (ZhongTie shisi Bureau Group Compang,Ji’nan,250014,China);Construction project risk management research:The US experiences and the enlightenment[J];Technoeconomics & Management Research;2008-05
8 ;Risk Assessment of Venture Capital Program Based on Risk Matrix[J];Science & Technology Progress and Policy;2006-01
9 FU Zhi-min~(1,2), LI Han-ling~1(1. School of Management, Harbin Institute of Technology, Harbin 150001, China;2. The Second Academy, China Aerospace Science and Industry Corporation, Bejing 100854, China);Risk analysis, evaluation and correlation study foraerospace research and development project[J];Systems Engineering and Electronics;2005-01
10 GAO Feng,CHEN Ying-wu(System Engineering Institute,NUDT,Changsha 410073,China);Risk Management of Critical R&D Project:Research Overview[J];R&D Management;2005-06
【Secondary Citations】
Chinese Journal Full-text Database 10 Hits
1 XIE Sheng-qiang, ZOU Hui-wen ,CHEN De-mian(Investment Institute, Tongji University, Shanghai200092,China);Study of the risk distribution and the optimal risk control management in venture-capital investing projects[J];Journal of Anhui University(Natural Sciences);2003-01
2 SONG Yan-xue,ZHANG Zhi-feng,HUO Liang(College of Missile,Engineering University of PLA Air Force,Sanyuan 713800,China);Risk Assessment Model of Development Project for Weapon Equipment Based on BP Neural Network[J];Ordnance Industry Automation;2007-05
3 WANG Ying-lei, XU Zhe (School of Economics and Management, Beijing University of Aeronautics and Astronautics, Beijing 100083);A Analysis of the Huge Engineering Project's Combined Risk of Schedule and Cost[J];Journal of Beijing University of Aeronautics and Astronautics(Social Sciences Edition);2000-04
4 HAN Xiao1,HE Ming1, LI Jinlin1, YANG Yong2(1School of Management and Economics, Beijing Institute of Technology, Beijing100081, China; 2Dept. of Automatic Control, Beijing Institute of Technology, Beijing100081, China);Method of Evaluation for Risks in Research Projects Based on Grey Relevancy[J];Journal of Beijing Institute of Technology;2002-06
5 ZHANG Wen-jie,XIE Wu-jie;The Application of ISM in Risks Structure Analysis[J];Commercial Research;2002-03
6 HUANG Xin (Chongqing University of Posts and Telecommunications,Chongqing 400065);Design of the Index System for a Decision Support System of International Investment Estimation[J];Journal of Chongqing University of Posts and Telecommunications;2000-02
7 GOU Ming1, FAN Zheng-tang2 (1.Department of Marthematics, Northwest University, Xi'an 710069, China; 2.School of Economics, Northwest University, Xi'an 710069, China);Comparison of risk measuring portfolio model[J];Pure and Applied Mathematics;2002-04
8 FU Xiang, WANG Li-ping, JI Chang-ming (Water Resource & River Engineering Department, Wuhan University, Wuhan 430072, China);STUDIES ON THE GENERAL MODEL SYSTEM OF FLOOD HAZARD RISK EVALUTION[J];Resources and Enuironment In The Yangtza Basin;2000-04
9 LIU Guo-jing~1, ZHANG Lei~2(1.Management School,Xi'an Jiaotong University, Xi'an 710049,China;2.School of Economics and Finance, Xi'an Jiaotong University, Xi'an 710061, China);On the Loaning Program Risk Assessment Methods Based on Risk-matrix[J];The Study of Finance and Economics;2004-02
10 Wang Haichao,Yang Guangxi (The Department of Civil Engineering and Mechanics, Yanshan University, Qinhuangdao 066004). (Bohai Aluminium Industary Ltd., Qinhuangdao 066004).;Applicability - Studies of The Secondary Critical Path Planing in The Construction Optimum Management[J];JOURNAL OF YANSHAN UNIVERSITY;2000-01
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved