Design of Main Steam Drain System in Ling'Ao PhaseⅡNuclear Power Plant

CHEN Juan (Guangdong Electric Power Design Institute,Guangzhou 510663,Guangdong Province,China)  
In Ling'Ao phaseⅡnuclear power plant,the space under HP/LP cylinders is limited due to the application of half-speed turbine.Therefore,the setting of external drain flash tanks as Ling'Ao phaseⅠis not available.A new design concept is proposed in the study by combining the steam drain system design experience with the calculation of main steam condensate in various operation conditions.By cancel the external drain flash tanks,the feasibility of discharging steam drain from manifold to condenser flash box directly was proved.With the new arrangement,the system and equipment is simplified and the space problem is solved.
【CateGory Index】: TK263
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Citations】
Chinese Journal Full-text Database 1 Hits
1 REN Jia-fu,YANG Hong-ren(Dongfang Steam Turbine Works,Deyang 618000,China);Appropriate Steam Flow in Drain Pipes of High-Pressure Internal Casings[J];发电设备;2006-05
【Co-citations】
Chinese Journal Full-text Database 1 Hits
1 CHEN Juan (Guangdong Electric Power Design Institute,Guangzhou 510663,Guangdong Province,China);Design of Main Steam Drain System in Ling'Ao PhaseⅡNuclear Power Plant[J];电力技术;2010-Z2
Similar Journals
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved