Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Energy Technology and Economics》 2011-02
Add to Favorite Get Latest Update

Decision-making Study in Different Life Phases for Transmission & Transformation Equipments Based on LCC

ZHANG Jianhao1,XUAN Rongsheng1,WANG Yi2,WANG Huifang2(1.Shaoxing Electric Power Bureau,Shaoxing 312000,China;2.College of Electrical Engineering,Zhejiang University,Hangzhou 310027,China)  
Power companies need to go through multiple decision-making processes in assets management.Isolated decision-making or indistinct decision-making targets will lead to unscientific decisions.Introducing life cycle cost(LCC) philosophy into management is the development trend in the future,and establishment of LCC-based decision-making targets is necessary and scientific.This paper first defines different life stages for transmission transformation equipment,studies LCC based decision-making targets,and then builds a LCC tree and analyzes its benefit constitution.Finally,the cost and benefit constitution in different phases including planning design,the operation maintenance,and discard are elaborated,and their corresponding decision-making models are established.
【CateGory Index】: TM73;F273.4
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Citations】
Chinese Journal Full-text Database 10 Hits
1 YE Ze,WANG ya-li(School of Management,Changsha University of Science and Technology,Changsha,Hunan 410076,China);An Analysis of the Decision-making Method of Asset Replacement of Power Grid Enterprise under the Condition of Regulatory Assets Regulation[J];Journal of Changsha University of Science & Technology(Social Science);2008-04
2 ZHANG Yong, WEI Bin (State Power Economic Research Institute, Beijing 100761, China);Reflections on Implementing Assets Life Cycle Management in Power Grid Corporations[J];Electric Power Technologic Economics;2008-04
3 LU Jun (Shaoxing Electric Power Bureau of Zhejiang Electric Power Company, Shaoxing 312000, China);Practice on Information Management for Fixed Assets in Power Supply Enterprises[J];Electric Power Technologic Economics;2008-05
4 GUO Ji-wei~1, LIU Gang~1, TANG Guo-qing~1, WANG Ying~2 (1.Electrical Engineering Department of Southeast University, Nanjing 210096, China; 2.State Development and Investment Company, Beijing 100037, China);Markov Decision Process on Electrical Equipments Maintenance Optimization[J];Proceedings of Electric Power System and Automation;2004-04
5 ZHANG Huai-yu,ZHU Song-lin,ZHANG Yang,LOU Qi-min,ZHANG Liang(Zhejiang Provincial Electric Power Company,Hangzhou 310014,Zhejiang Province,China);Research and Implementation of Condition-Based Maintenance Technology System for Power Transmission and Distribution Equipments[J];Power System Technology;2009-13
6 YU Li-jun (Jinhua Electric Power Bureau, Zhejiang Electric Power Corporation, Jinhua 321007, China);Two Key Issues and Countermeasures on Life Cycle Asset Management for Power Grid Enterprises[J];Energy Technology and Economics;2010-01
7 LIANG Yue-qing(Hubei Electric Power Survey and Design Institute, Wuhan 430024, China);Problems and Countermeasures in Cost Control of Power Transmission Projects at the Design Stage[J];Energy Technology and Economics;2010-02
8 ZHU Ji-mu~1,YU ZHeng-huan~1,HAN Tian-xiang~2(1. Power Plant of Baosteel Co.Ltd,Shanghai 200941;2. East China Electric Power Test & Research Institute,Shanghai 200433);Life cycle cost evaluation used for selection of different combinations ofsteam parameters for newly built generation unit[J];East China Electric Power;2004-11
9 XUE Yu-lan(Dept.of Production,East China Grid Company Limited,Shanghai 200002,China);Maintenance cost calculations based on Life Cycle Cost[J];East China Electric Power;2008-10
10 CHEN Hai-bo,XUE Yu-lan,HAN Tian-xiang,ZHENG Huai(East China Grid Company Limited,Shanghai 200002,China);Trend and challenge of asset management for power engineering[J];East China Electric Power;2009-01
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 LIU Sheng (Baoding Power Supply Company, Hebei Electric Power Company, Baoding 071051, China);Problems and Solutions in ERP Applications in Electric Power Company[J];Electric Power Technologic Economics;2009-03
2 YU Zhuo-zhou, LIU Jian-hua(College of Electrical and Information Engineering, Changsha University ofScience and Technology, Changsha, 410076, P.R.China);Method of Fault Prediction in Distribution Networks Every Month by Markov Chain with Weights[J];Proceedings of the Chinese Society of Universities for Electric Power System and its Automation;2008-05
3 CUI Qi-ming(Liaoning Anshan Power Supply Company, Anshan 114001, China);Electrical Power Equipment Condition Assessment Expert System Based on ESTA[J];Proceedings of the Chinese Society of Universities for Electric Power System and its Automation;2008-05
4 SHI Jing-nan,HAN Hong-li,XU Tao (Zhengzhou Electric Power Design Institute,Zhengzhou 450012,Henan Province,China);Application of Life Cycle Costs Analysis in Planning Design of Power Transformation Projects[J];Power System Technology;2009-09
5 Guangdong Power Grid Corporation Guangzhou Power Supply Bureau Li Dang;Optimization of on Power Supplying Equipment Maintenance Scheduling based on Improved Genetic Algorithm[J];Guangdong Power Transmission Technology;2009-04
6 LI Xiao-hui(Zhejiang Electric Power Corporation,Hangzhou 310007,China);Study on Financial Innovation for Power Grid Enterprises in Current Situation[J];Electric Power Technologic Economics;2009-04
7 WANG Xue-liang, HAO Zhen-yu, ZHANG Lin-lin (State Grid Energy Research Institute, Beijing 100052, China);Study on Measures to Strengthen Cost Management of Power Grid Companies[J];Energy Technology and Economics;2010-01
8 YU Li-jun (Jinhua Electric Power Bureau, Zhejiang Electric Power Corporation, Jinhua 321007, China);Two Key Issues and Countermeasures on Life Cycle Asset Management for Power Grid Enterprises[J];Energy Technology and Economics;2010-01
9 LIANG Yue-qing(Hubei Electric Power Survey and Design Institute, Wuhan 430024, China);Problems and Countermeasures in Cost Control of Power Transmission Projects at the Design Stage[J];Energy Technology and Economics;2010-02
10 WANG Dewen,ZHU Yongli,WANG Yan (North China Electric Power University,Baoding 071003,China);Condition Monitoring and Integrating Platform for Power Transmission and Transformation Equipment Based on IEC 61850[J];Automation of Electric Power Systems;2010-13
【Secondary Citations】
Chinese Journal Full-text Database 10 Hits
1 WANG Ren-zhong, LI Lei, SHENG Jin-bao(Dam Safety and Management Department, Nanjing Hydraulic Research Institute, Dame Safety Management Center of the Ministry of Water Resources, Nanjing 210029, China);On criterion of social and environmental risk of reservoir dams[J];Journal of Safety and Environment;2006-01
2 MIAO Xiao - peng (Anyang University);Approach to the Best Time Limit of Updating Equipment[J];Journal of Anyang University;2003-01
3 Zhang Yun(Department of Economy Management,Beijing Institute of Light Industry,Beijing 100037);THE LIFE CYCLE COST OF PRODUCTS[J];JOURNAL OF BEIJING INSTITOTE OF LIGHT INDUSRY;1996-02
4 JIANG Yi-min, MA Jun(Shanghai Electric Power Company, Shanghai 200002, China);Analysis of Life Cycle Cost of Transformer[J];Transformer;2006-12
5 JIN Xi,LU Zhe-min (1.Shanghai University of Electric Power,Shanghai 200090,China;2.Shanghai Electric Power Construction Corporation,Shanghai 200235,China);Application of life cycle cost analysis in planning of electric power grid restoration[J];Journal of Electric Power Science and Technology;2007-01
6 HUANG Jian-bo CHEN Shan-yi FU Fu-long (Business School of Middle-Southern University,Changsha Hunan 410083;China Huaneng Group,Beijing 100088);Study on Securitization of Power Creditor'Assets and Risk Management[J];Electric Power Technologic Economics;2006-02
7 CAO Meng-de (Shaoguan Power Supply Bureau,Shaoguan Guangdong 512026);Investigation and Analysis on Current Status in Assets Management for County Power Supply Utilities[J];Electric Power Technologic Economics;2006-06
8 SUN Zhen(Gansu Electric Power Corporation,Lanzhou 730050,China;School of Management,Lanzhou University,Lanzhou 730020,China);Treatment of Local Government's Assets for the Reform of Rural Power System[J];Electric Power Technologic Economics;2008-01
9 LI Cheng-ren,GAO Xiao,Li Ying(State Power Economic Research Institute,Beijing 100761,China);Why China's Regulatory Depreciation Rate of Fixed Assets of Power Grids Should Not Be Simply Determined by Referring to International Experiences[J];Electric Power Technologic Economics;2008-01
10 FENG Yong-sheng, MA Yuan (Graduate School of CASS, Beijing 100102, China);Disscuss on the Natural Monopoly of Transmission and Distribution Grids of Electricity Industry[J];Electric Power Technologic Economics;2008-02
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved