Application of the Bill of Quantity Pricing in Power Grid Projects

WANG Hongru,WANG Hong(Beijing Electric Power Company Haidian Power Supply Bureau,Beijing 100086,China)  
As a method for project bidding and pricing,the bill of quantity(BOQ) has been generally used at home and abroad.Based on the requirements of "BOQ Pricing Specification for Electric Power Transmission Transformation Project" formulated by the State Grid Corporation of China,this paper discusses how to establish and apply the BOQ to power grid project construction,and analyzes the issues that attention should be paid to in application of BOQ pricing.
【CateGory Index】: F284
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Citations】
Chinese Journal Full-text Database 10 Hits
1 LIANG Yue-qing(Hubei Electric Power Survey and Design Institute, Wuhan 430024, China);Problems and Countermeasures in Cost Control of Power Transmission Projects at the Design Stage[J];Energy Technology and Economics;2010-02
2 LIANG Yue-qing(Hubei Electric Power Survey and Design Institute,Wuhan 430024,China);Cost Estimate Method for Transmission Line Project Based on Its Main Component Materials[J];Energy Technology and Economics;2010-07
3 ZHOU Xuewen(State Power Economic Research Institute,Beijing 100052,China);Application of Partnering Mode in Power Transmission Project Management[J];Energy Technology and Economics;2011-05
4 LU Yu1,ZHENG Yan1,ZHAO Biao1,TANG Yong2(1.State Power Economic Research Institute,Beijing 100052,China;2.Gaojing Co-generating Plant,Beijing 100041,China);Development and Application of Trace Analysis System for Budgeting and Calculation Code for Power Grid Construction Projects[J];Energy Technology and Economics;2011-08
5 XIAO Zhi(Mid-South Design & Research Institute of Hydro China Corporation,Changsha 410014,China);Problem Analysis and Countermeasures for Current Collection Lines Project of Wind Farm[J];Energy Technology and Economics;2011-10
6 CUI Wanfu,ZHENG Yan,LU Yu,LI Longfei,JI Kailin(State Power Economic Research Institutes,Beijing 100052,China);Cost Analysis of Transformation Projects in Jilin Province in 2010[J];Energy Technology and Economics;2012-01
7 Zhu Guangsheng(East China Grid Company Ltd.,Shanghai City,200002);Meanings of Valuation with Bill Quantity of Electric Power Construction in Practice and Its Environments[J];Electric Power Construction;2006-04
8 Zhang Miao;Determination of Construction Contract Price under the Bill of Quantities Means and its Adjustment[J];Anhui Architecture;2011-04
9 ZHANG Hai-ying (Hebei Tianxin Construction Group Limited Company,Cangzhou 061000,China);Thinking on Realization of Model of Quantity Bill Valuation[J];Journal of Hebei Engineering and Technical College;2009-04
10 CAO Jian-bing1,LI Jian-liang2,ZHAO Zuo-qi1,QI Fang3(1.Baotou Company of China Huadian Power Plant Operation Corporation Limited,Baotou 014013,China;2.State Power Machinery Research & Design Institute,Hangzhou 310030,China;3.Huadian Baotou Generation Corporation Limited,Baotou 014000,China);The successful experience analysis of benchmarking management[J];Huadian Technology;2008-12
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 LIANG Yue-qing(Hubei Electric Power Survey and Design Institute,Wuhan 430024,China);Cost Estimate Method for Transmission Line Project Based on Its Main Component Materials[J];Energy Technology and Economics;2010-07
2 ZHANG Jian,ZHANG Hao-yu,LI Jing-ru,ZHAO Biao(State PowerEconomic Research Institute,Beijing 100052,China);Analysis on Changes of the Power Transmission Project Cost in 2008[J];Energy Technology and Economics;2010-09
3 Bahtiwar·Mansur,CAO Ting-ting(Construction Management Bureau of Xinjiang Xiabandi Water Resources Project,Kashi 844000,China);Investment Control for Xinjiang Xiabandi Water Resources Project at Construction Phase[J];Energy Technology and Economics;2010-10
4 LIANG Yue-qing,LIANG Lv,DONG Dong(Hubei Electric Power Survey and Design Institute,Wuhan 430024,China);Influence of Stipulated Charge on the Cost of Short-Distance Overhead Transmission Lines[J];Energy Technology and Economics;2010-12
5 LI Damao,LIANG Yueqing,NIE Zan(Hubei Electric Power Survey and Design Institute,Wuhan 430024,China);Basic Strategies for Electric Power Design Company to Launch EPC Contracting Projects of Overseas Power Transmission Lines[J];Energy Technology and Economics;2011-01
6 ZHANG Jianhao1,XUAN Rongsheng1,WANG Yi2,WANG Huifang2(1.Shaoxing Electric Power Bureau,Shaoxing 312000,China;2.College of Electrical Engineering,Zhejiang University,Hangzhou 310027,China);Decision-making Study in Different Life Phases for Transmission & Transformation Equipments Based on LCC[J];Energy Technology and Economics;2011-02
7 CHEN Dabin,QI Lizhong(State Power Economic Research Institute,Beijing 100052,China);Analysis on the Impact of Conductor-lay Modes on the Economy of UHV AC Transmission Lines[J];Energy Technology and Economics;2011-04
8 HUANG Qing,SHAN Baoguo(State Grid Energy Research Institute,Beijing 100052,China);Brazil's Ten-Year Electricity Transmission Expansion Plan and Market Potential for Investment[J];Energy Technology and Economics;2011-05
9 LIANG Yueqing(Hubei Electric Power Survey and Design Institute,Wuhan 430024,China);Consequences Analysis and Suggestions on the Change of Sub-contractor for the Power Transmission Line Project in Myanmar[J];Energy Technology and Economics;2011-05
10 LU Yu1,ZHENG Yan1,ZHAO Biao1,TANG Yong2(1.State Power Economic Research Institute,Beijing 100052,China;2.Gaojing Co-generating Plant,Beijing 100041,China);Development and Application of Trace Analysis System for Budgeting and Calculation Code for Power Grid Construction Projects[J];Energy Technology and Economics;2011-08
China Proceedings of conference Full-text Database 1 Hits
1 DAI Bo (Henan Electric Power Survey & Design Institute,Zhengzhou 450007,Henan Province,China);Study on the Cost Level of 500 kV Transmission Line Projects[A];[C];2011
【Secondary Citations】
Chinese Journal Full-text Database 10 Hits
1 LUO Jie (Zhaoqing Power Supply Branch,Guangdian Group,China Southern Electric Power Grid Corporation,Zhaoqing,Guangdong Province,526060,China);Reform on Cost Management for Power Project[J];Electric Power Technologic Economics;2005-01
2 XIAO Li (Xiangneng Project Cost Consulting Service Limited Company,Changsha,Hunan Province,410007,China);Total Process Tracing Cost Auditing for Project Construction[J];Electric Power Technologic Economics;2005-01
3 HOU Yong JIA Fa-bin (Beijing Electric Power Construction Company,Beijing 100024,China);Risk Analysis and Countermeasures for Thermal Power Construction Enterprise[J];Electric Power Technologic Economics;2005-02
4 CHEN Guo-feng LI Mo TANG Wen-chang (Haerbin Power Plant Engineering Limited Company,Haerbin,Helongjiang Province,150046,China);Cost Control of EPC Contractor for Power Plant Project[J];Electric Power Technologic Economics;2005-02
5 MO Xiyong (Shenzhen Weiyanda Electric Power Supervision and Management Company,Shenzhen,Guangdong,518034);Analysis on Over-budgeting of Transmission Project and Countermeasure[J];Electric Power Technologic Economics;2005-03
6 QIN Guo-zhu (Beijing Power Construction Company,Beijing 100024);Problems of Low Cost Strategy Applied by Construction Business[J];Electric Power Technologic Economics;2005-05
7 ZHU Hui-rong ZHANG Wei-bo(China Electric Power Engineering Consulting Group Corporation,Beijing 100011;China Huadian Group Corporation,Beijing 100035);Experiences on Contract Management for Large Power Construction Project[J];Electric Power Technologic Economics;2005-05
8 YAN Ming-zhang (No.3 Power Construction Company of Shanxi Electric Power Corporation,Taiyuan Shanxi 030006);Survive Status of Thermal Power Construction Enterprise and Countermeasures for Stable Development[J];Electric Power Technologic Economics;2006-02
9 SHAO Hong (Shanxi University,Taiyuan Shanxi 030000);Contract Management for Power Construction Enterprise[J];Electric Power Technologic Economics;2006-02
10 GONG Jian-bei JIANG Miao(1.Quzhou Power Supply Bureau of Zhejiang Province,Quzhou Zhejiang 324000;2.No.12 Engineering Bureau of China Water Conservancy and Hydroelectric Power,Jinhua Zhejiang 321025);Implementation of Tendering Model Using List of Power Project Work to Calculate Price[J];Electric Power Technologic Economics;2006-05
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved