Study of Optimum Maintenance Cycle for Microcomputer-Controlled Relay Protection Devices Based on Reliability Analysis

REN Zhen1,LI Hong-ning1,WU Guo-pei1,2(1.Electric Power College,South China University of Technology,Guangzhou 510640,China; 2.Guangzhou Power Supply Bureau of GPGC,Guangzhou 510600,China)  
Current reliability models of microcomputer-controlled relay protection devices have insufficient accuracy resulting difficulties in application.The authors introduce self-checking coefficient,examine success coefficient and fault service coefficient,improve device reliability model and compute optimum maintenance cycle.Optimum maintenance cycle calculation software is also developed to dynamically evaluate device reliability.Finally,sensitivity analysis of factors affecting optimum device maintenance cycle is conducted and two influential factors,including self-checking coefficient and examine success coefficient are identified.
【CateGory Index】: TM774
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 WU Yi-chun (Anhui Power Training Center, Hefei 230022, China);Assessment for Peak Load Carrying Capability of Generation Unit[J];;2004-01
2 CHEN Shi-qing (Liupanshui Power Supply Bureau,Liupanshui 553001,China);Brief Discussion on Predictive Maintenance of Power Transformer[J];Transformer;2002-S1
3 Pi Hongqin (Yjyang Electric Power Department Hunan) Wan g Mingqi (Chaagsha Normal Unive rsity of Water Resou roes and Electric Power);RESEACH ON SOME QUESTIONS OF TRANSFORMER ECONOMICAL OPERATION[J];;1988-02
4 Zhang Xirong(Department of Adrm istrative E gi eeri g,NEEPI. Jili 132012);Analysis to Service Tactics on Equipment of Power Supply[J];JOURNAL OF NORTHEAST CHINA INSTITUTE OF ELECTRIC POWER ENGINEERING;1994-04
5 Shao Ticliang Zhang Fengyian (Northeast Forestry University) Fan Shijie(Daxinganling Mountain Power Bureau);RELIABILITY ANALYSIS OF POWER PLANTS IN DAXINGANLING MOUNTAIN FORESTRY AREA[J];Journal of Northeast Forestry University;1992-04
6 Lu Huaimin(Northeast Forestry University)Bai Xudong(Harbin Institute of Electrical Technology);STATISTICAL ANALYSIS OF RELIABILITY AND MAINTAINABILITY OF ENGINEERING MACHINERY[J];Journal of Northeast Forestry University;1993-02
7 Zhou Yaping Wu Lianyuan;An Algebric Methodology for Reliability Evaluation[J];;1988-04
8 WANG Qing-liang,HOU Yuan-bin,FU Zhou-xing,LI Zhong(Xi'an University of Science and Technology,Xi'an 710054,China);Reliability assessment of protective relaying based on operation risk theory[J];Advanced Technology of Electrical Engineering and Energy;2009-01
9 Zhang min Xu Zhuping (Xiangtan Polytechnique University);The Imitative Calculation for Reliability of Main Circuit[J];Electrotechnical Journal;2001-09
10 Zhu Jinhua (Zhejiang University);PSS/ADEPT Based Distribution Network Reliability Analysis[J];Electrotechnical Application;2006-07
【Secondary Citations】
Chinese Journal Full-text Database 7 Hits
1 Li Kui Lu Jianguo (Hebei University of Technololy)Hu Delin (SuzhouSub-Center of Machine Tool Electric Apparatus Test,Ministry of Machinery Industry);The Reliability Index of Protective Type ElectricalApparatus and its Theoreticalk Analysis[J];TRANSACTIONS OF CHINA ELECTROTECHNICAL SOCIETY;1997-03
2 Hong Mei; Ding Ming ;Dai Renchang (Electrical Engineering Department,Hefei University of TechnologyHefei, 230009 China);THE PROBABILISTIC MODELING OF PROTECTION SYSTEM AND ITS EFFECT ON COMPOSITE SYSTEM RELIABILITY[J];POWER SYSTEM TECHNOLOGY;1997-08
3 CHEN De\|shu (Huazhong University of Science & Technology, Wuhan 430074, China);STUDY ON EVALUATION OF PROTECTIVE RELAY OPERATION[J];POWER SYSTEM TECHNOLOGY;2000-03
4 XIA Ming-chao1, HUANG Yi-zhuang1, WANG Xun2 (1. Dept. of E.E., Tsinghua University, Beijing 100084, China; 2. East China Jiaotong University, Nanchang 330013, Jiangxi Province, China);DEVELOPMENT AND PRESENT SITUATION OF TRANSIENT BASED PROTECTIONS FOR HIGH VOLTAGE POWER TRANSMISSION LINES[J];Power System Technology;2002-11
5 ZHOU Yu-lan1, WANG Jun-yong1, SHU Zhi-huai2, CHENG Xiao2 (1. China Electric Power Research Institute, Beijing 100085, China; 2. State Grid Corporation of China, Beijing 100031, China);STATISTICS AND ANALYSIS OF OPERATION SITUATION OF PROTECTIVE RELAYINGS AND AUTOMATION DEVICES OF POWER SYSTEMS IN CHINA IN 2002[J];Power System Technology;2003-09
6 Chen Mingshi et al.;Comprehensive Analysis of Reliability for a Transmisson Line Protection Device Based Microprocessors[J];POWER SYSTEM ENGINEERING;1997-03
7 Yan Guohua,Yuan Dezhu,Cheng Li(Acheng Relay Corporation,150302,Acheng,China);RELIABILITY PREDICTION ON APPLICABLE PROGRAM OF MICROPROCESSOR BASED RELAY PROTECTION[J];RELAY;1998-06
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved