Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Electric Power Construction》 2009-02
Add to Favorite Get Latest Update

Development and Application of Working Cable Computation Software for Construction Cargo Cableway

BAI Xue-song1,MIAO Qian1,WANG Li-jun2,LV Ying2(1.China Electric Power Research Institute,Beijing 100055,China;2.Beijing Chenan Weiye Technology Co.,Ltd.,Beijing 100085,China)  
Construction cargo cableway is an economical means of construction material and tower material transportation in domestic line constructions.The accuracy of load cable design calculation directly affects the safety and economy of cableway operation.On the basis of suspending cable calculation theories,including catenary,and parabola,algorithms for 4 cases,such as single-span and single-load,single-span and multi-load,multi-span without load,and multi-span with multi-load,are developed.Working cable computation software for construction cargo cableway is developed using numerical analysis software Mathematica and C.NET technologies,resulting in parametric design,and high design accuracy and efficiency.
【Fund】: 国家电网公司重大科技创新专项(AKZ3060649)
【CateGory Index】: TP311.52;TM75
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved