Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Electric Power Construction》 2009-07
Add to Favorite Get Latest Update

Analysis of Thermal Power Plant FGD Design Status in Guangdong

LIAO Yong-jing,ZENG Ting-hua,GUO Bin (Guangdong Power Grid Company Electric Power Science Research Institute,Guangzhou 510600,China)  
Improvement of FGD availability and performance is a comprehensive job,including design,equipment and operation optimization, equipment good maintenance,of which the design optimization is the base.The paper investigates and analyses design conditions of 11 thermal power plants FGD,summarizes existing problems in FGD design,puts forward corresponding measures.
【CateGory Index】: X701.3
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【References】
Chinese Journal Full-text Database 1 Hits
1 PEI Jun-feng,WU Wei,WANG Feng-ru(Huaneng Qinbei Power Plant,Jiyuan 454662,He'nan Province,China);Renovation of the Desulphurization-wastewater Treatment-system of Qinbei Power Plant[J];Electric Power Construction;2010-06
【Citations】
Chinese Journal Full-text Database 2 Hits
1 LIAO Yong-jin1, WANG Li1, LUO Wen-bo2 (1. Guangdong Power Technology Research Institute of Guangdong Grid Company, Guangzhou 510600, China; 2. Guangdong Yudian Group Co. Ltd., Guangzhou 510630, China);Cost Research of Thermal Power Plant FGD System[J];Electric Power Construction;2007-04
2 LIAO Yong-jin,ZENG Ting-hua,WANG Li,GUO Bin (Guangdong Power Test and Research Institute,Guangzhou 510600,China);Analysis of design and operation for wet FGD system[J];Electric Power;2005-12
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 LIANG Chang-long(Sanhe Power Generation Limited Liability Company,Sanhe 065201,China);Discussion of GGH Heat Exchanger Components Scaling for Wet Flue Gas Desulfurization[J];Journal of Anhui Electrical Engineering Professional Technique College;2008-03
2 ;Research on stack anticorrosion technologies for the wet FGD system[J];Electric Power Environmental Protection;2005-03
3 ;Application of the regional characteristic analysis in the choice of the FGD process in Guangdong Province[J];Electric Power Environmental Protection;2006-04
4 ;Application of cost-benefit analysis method on desulfurization project's economic assessment in thermal power plants[J];Electric Power Environmental Protection;2006-04
5 LIAO Yong-jin,ZENG Ting-hua,GUO Bin,et al;Discussion on the performance test of FGD equipment in thermal power plants[J];Electric Power Environmental Protection;2007-02
6 ;The application of the biotech flue gas desulfurization technology[J];Electric Power Environmental Protection;2007-06
7 ;The application of wet desulfurization technology on burnning high sulf-coal units[J];Electric Power Environmental Protection;2008-01
8 HU Zhi-guang,PAN Xiao,CHANG Ai-ling;Study on developing help system of limestone/gypsum wet flue gas desulfurization[J];Electric Power Environmental Protection;2008-02
9 YAN Xiao-guang,XIONG Li-xiang,MA Hong-jin,et al;Technical characteristics of FCL ammonia flue gas desulfurization and its application[J];Electric Power Environmental Protection;2008-02
10 LIAO Yong-jin,ZENG Ting-hua,GUO Bin;Discussion on bypass system operation method of FGD equipment in thermal power plants[J];Electric Power Environmental Protection;2008-03
China Proceedings of conference Full-text Database 1 Hits
1 DONG Xuefeng, JIANG Dehou, ZHOU Xiaoxiang (Henan Power Experiment Institute, Zhengzhou 450052, China);Limestone-gypsum Wet Desulfurization Unit the Main Problems and Countermeasures[A];[C];2008
【Co-references】
Chinese Journal Full-text Database 6 Hits
1 Lu Jia, Huang Qishun (Anhui Provincial Electric Power Test Research Institute, Hefei, 230022);Adjustment and Test on Industrial Waste Water System in Thermal Power Plant[J];Electric Power Construction;2003-01
2 Zou Qi (SP Electric Power Construction Research Institute, Beijing, 100055);Study on Waste Water Treatment System of Floating Bed Biological Membrane with Lime Mixture Coagulation[J];Electric Power Construction;2003-02
3 Tang Dongsheng (Guangdong Provincial Electric Power Design Research Institute, Guangzhou City, 510600);Selection of Treatment Options for Sea Water Circulating Cooling Water[J];Electric Power Construction;2003-05
4 ZENG De-yong (Huaneng Beijing Thermoelectrical Co.,Ltd.,Beijing 100023,China);Technical Performance Comparisons of Horizontal Dewatering Centrifuges for FGD Waste Water Treatment System[J];Electric Power Construction;2008-10
5 LIANG Chang-long (Sanhe Power Generation Limited Company,Sanhe 065201,China);Discussion about Scaling on GGH Heat Exchanging Components of Wet FGD[J];Electric Power Construction;2009-08
6 YOU Xiao-hong(Jiangsu Electric Power Design Institute,Nanjing 211102,China);Water Treatment System Optimized Design in Huaneng Chaohu Power Plant[J];Electric Power Construction;2010-02
【Secondary Citations】
Chinese Journal Full-text Database 1 Hits
1 ;Design and Operation of Wet Flue Gas System in Lianzhou FGD Plant[J];North China Electric Power;2003-09
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved