Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Electric Power Construction》 2010-06
Add to Favorite Get Latest Update

Renovation of the Desulphurization-wastewater Treatment-system of Qinbei Power Plant

PEI Jun-feng,WU Wei,WANG Feng-ru(Huaneng Qinbei Power Plant,Jiyuan 454662,He'nan Province,China)  
The paper analyzes the causes for the abnormal operation of the desulphurization wastewater treatment system of Qinbei power plant,probes into the problems with the system design,and proposes some technical renovation measures for the system.
【CateGory Index】: X703
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Citations】
Chinese Journal Full-text Database 7 Hits
1 Lu Jia, Huang Qishun (Anhui Provincial Electric Power Test Research Institute, Hefei, 230022);Adjustment and Test on Industrial Waste Water System in Thermal Power Plant[J];Electric Power Construction;2003-01
2 Zou Qi (SP Electric Power Construction Research Institute, Beijing, 100055);Study on Waste Water Treatment System of Floating Bed Biological Membrane with Lime Mixture Coagulation[J];Electric Power Construction;2003-02
3 Tang Dongsheng (Guangdong Provincial Electric Power Design Research Institute, Guangzhou City, 510600);Selection of Treatment Options for Sea Water Circulating Cooling Water[J];Electric Power Construction;2003-05
4 ZENG De-yong (Huaneng Beijing Thermoelectrical Co.,Ltd.,Beijing 100023,China);Technical Performance Comparisons of Horizontal Dewatering Centrifuges for FGD Waste Water Treatment System[J];Electric Power Construction;2008-10
5 LIAO Yong-jing,ZENG Ting-hua,GUO Bin (Guangdong Power Grid Company Electric Power Science Research Institute,Guangzhou 510600,China);Analysis of Thermal Power Plant FGD Design Status in Guangdong[J];Electric Power Construction;2009-07
6 LIANG Chang-long (Sanhe Power Generation Limited Company,Sanhe 065201,China);Discussion about Scaling on GGH Heat Exchanging Components of Wet FGD[J];Electric Power Construction;2009-08
7 YOU Xiao-hong(Jiangsu Electric Power Design Institute,Nanjing 211102,China);Water Treatment System Optimized Design in Huaneng Chaohu Power Plant[J];Electric Power Construction;2010-02
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 LIANG Chang-long(Sanhe Power Generation Limited Liability Company,Sanhe 065201,China);Discussion of GGH Heat Exchanger Components Scaling for Wet Flue Gas Desulfurization[J];Journal of Anhui Electrical Engineering Professional Technique College;2008-03
2 LIU Bin;The application of temporary stack and duct block technology in retrofitted FGD project without GGH[J];Electric Power Environmental Protection;2008-03
3 ZHANG Cheng-wu,HUI Run-tang;Some suggestions on security and control of damper in WFGD system[J];Electric Power Environmental Protection;2008-03
4 ZHANG Jian-zhong;Discussion on problems of flue gas properties calculation methods in thermal power plants desulfurization and denitrification projects[J];Electric Power Environmental Protection;2008-04
5 CHEN Shui-long;Analysis and countermeasure for scaling and local caving at mist eliminator in power plant FGD system[J];Electric Power Environmental Protection;2008-04
6 XIAO Jia-rong;Application of damper in flue gas desulfurization system[J];Electric Power Environmental Protection;2008-06
7 XUE Jian-ming,XU Yue-yang,JIN Ding-qiang,et al;Innovation development and application of wet flue gas desulfurization process[J];Electric Power Environmental Protection;2009-01
8 SUN Wei-min,XUE Jian-ming,WANG Xiao-ming;Research on post evaluation system of flue gas desulfurization engineering project[J];Electric Power Environmental Protection;2009-01
9 ZHOU Zu-fei;Influencing factors on economic efficiency of FGD system and its improvement measures[J];Electric Power Environmental Protection;2009-02
10 ZHENG Heng (Beijing Guohua Electric Power Ltd. Co., Beijing 100025, China);Learning from Project Management of FGD Synchronized Commission[J];Electric Power Construction;2009-03
【Secondary Citations】
Chinese Journal Full-text Database 10 Hits
1 LIANG Chang-long(Sanhe Power Generation Limited Liability Company,Sanhe 065201,China);Discussion of GGH Heat Exchanger Components Scaling for Wet Flue Gas Desulfurization[J];Journal of Anhui Electrical Engineering Professional Technique College;2008-03
2 YANG Jie;Analysis on GGH scale deposit of WFGD system and its countermeasures[J];Electric Power Environmental Protection;2009-01
3 Lu Ming,Duan Chuanhe (Hebei Provincial Electric Power Survey Design Research Institute. Shijiazhuang City , 050031);Design Features on Flue Gas Duct of FDG Project in Dingzhou Power Plant[J];Electric Power Construction;2004-05
4 Zhang Xingshun,Zhang Shihai,Zhang Suyan(Shandong Huaju Energy Ltd.Co.,Zoucheng City Shandong Province,273515);Application of Centrifugal Dewatering Technology in Fuel Preparation System of CFB Boilers[J];Electric Power Construction;2006-05
5 Chen Hao(Shanghai No.1 Electric Power Installation Engineering Company, Shanghai City,200090);Installation of GGH in Wet FGD of Thermal Power Plants[J];Electric Power Construction;2006-06
6 YANG Jie (Hebei Electric Power Research Institute, Shijiazhuang 050021, China);Experiment Study of Stack Anticorrosion Measures after Wet FGD[J];Electric Power Construction;2007-04
7 LIAO Yong-jin1, WANG Li1, LUO Wen-bo2 (1. Guangdong Power Technology Research Institute of Guangdong Grid Company, Guangzhou 510600, China; 2. Guangdong Yudian Group Co. Ltd., Guangzhou 510630, China);Cost Research of Thermal Power Plant FGD System[J];Electric Power Construction;2007-04
8 XIE Chaohuan(Shaoguan Power Plant,Shaoguan,Guangdong,512132,China);Discussion on GGH Scaling in Desulphating System of a Fossil-fired Power Plant[J];Power Station Auxiliary Equipment;2008-04
9 Liu Fengru (Daqing Petrochemical Design Institute, 163714);Application of Horizontal Screw Centrifugal Dewaterer in Dewater of Refining "Three Sludge[J];Environment Protection In Petrochemical Industry;2002-04
10 LIAO Yong-jin,ZENG Ting-hua,WANG Li,GUO Bin (Guangdong Power Test and Research Institute,Guangzhou 510600,China);Analysis of design and operation for wet FGD system[J];Electric Power;2005-12
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved