Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Journal of Dalian University of Technology》 2011-02
Add to Favorite Get Latest Update

Research on project cost performance evaluation method using earned value of risk

LI Rui*1,2,LIU Yu-jun1,2,ZHANG Fan1,2,WANG Ji1,2,DENG Yan-ping1,21.State Key Laboratory of Structural Analysis for Industrial Equipment, Dalian University of Technology,Dalian 116024,China;2.Department of Naval Architecture,Dalian University of Technology,Dalian 116024,China  
Earned value management method is an effective tool of project integrated management.Based on the theory of earned schedule,the problem of earned value distribution is discussed.The problem,which commonly happens during the implementation,is a main reason causing the conservative evaluation results by means of the original method.To solve the problem,the concepts of unexpected earned value and earned value of risk are defined,and the cost performance evaluation method of project is revised.By using the revised method,a more reliable evaluation result of complete cost is proposed in the most life cycles,and the overall forecast accuracy is improved.
【Fund】: 国家自然科学基金资助项目(70671015)
【CateGory Index】: F224;F285
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Citations】
Chinese Journal Full-text Database 1 Hits
1 Qi Anbang;On the Multi-factors Integration Management Method for Project Management[J];Nankai Business Review;2002-06
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 ZHAO Hui,WANG Xue-qing(School of Management,Tianjin University,Tianjin 300072);Information System Construction of Compositive Project Management[J];Journal of Beijing Institute of Technology(Social Sciences Edition);2008-06
2 CHEN Xi,XU Rong,XU Wei,WANG Xu-feng(College of Civil Engineering,Tongji University,Shanghai 200092,China);STUDY ON ORGANIZATION DESIGN IN LIFE-CYCLE MANAGEMENT OF EXPO VILLAGE PROJECT[J];Low Temperature Architecture Technology;2010-09
3 GUO Shi-hong,HU Zhi-yuan,LIU Pei-feng(Xi'an University of Architecture and Technology,Xi'an,Shaanxi 710055,China);Quality Earned Value Method Based on Delghi Method[J];Journal of Water Resources and Architectural Engineering;2011-02
4 LU Ning,FENG Yangping,WANG Fang,ZHOU Xuan,WANG Wei(College of Architectural,Chang’an University,Xi’an 710061,China);Quality earned value for integrated management[J];Journal of Liaoning Technical University(Natural Science);2009-01
5 GAO Ming~1,CHEN Yong-qiang~1,QIAO Yue~2(1.School of Management,Tianjin University,Tianjin 300072;2.CCC First Harbor Consultants Co.,Ltd.,Tianjin 300222,China);Analysis of Time-cost-quality Trade-off in Engineering Project Management[J];Port Engineering Technology;2007-01
6 GAO Peng1,FENG Jun-wen1,WANG Hua-ting2(1.School of Economics and Management,Nanjing University of Science & Technology,Nanjing 210094,China;2.The State Key Laboratory of Intelligent Technology and System,Tsinghua University,Beijing 100084,China);Method for Scheduling Forecasting with Time-based Earned Value Technology[J];Systems Engineering;2009-12
7 Li Tao(Shijiazhuang Vocational Technology Institute, Shijiazhang, Hebei 050081);Cost Control of Engineering Project Based on Earned Value Theory[J];Reformation & Strategy;2009-06
8 WU Xiao-hong(Civil Engineering Department of Tangshan College,Hebei Tangshan 063000,China);A research on integrated management in large-scale topographic mapping[J];Science of Surveying and Mapping;2011-03
9 LIU Yan,Sun Yuan,LU Hui-min (College of Civil Engineering,Southeast University,Nanjing 210096,China);Improved earned value method based on fuzzy evaluation of engineering quality[J];Construction Management Modernization;2009-03
10 WANG Qian-kun,LIU Hong-hai (College of Civil Engineering and Architecture,Wuhan University of Science and Technology,Wuhan 430070,P.R.China);Objective Integration Plan and Performance Measurement Method Based on Project Triangle[J];Journal of Chongqing Jianzhu University;2006-05
China Proceedings of conference Full-text Database 1 Hits
1 XU Yuan1, QI Anbang2 , ZHANG Jie2 (1. Tianjin Chengtou Constructing Ltd.) (2. Project Management Research center of Nankai University);The research on the Total Element Integration Management Method of the Government Investment Project Constructing Agent Enterprise[A];[C];2008
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved