Survey and Analysis of Moscow"5. 25" Blackout

LU Zong - xiang (State Key Lab of Power Systems, Dept. of Electrical Engmeering, Tsinghua University, Beijing 100084, China)  
A power blackout happened in Moscow on June 25, 2005, which is one of the top ten biggest power failures in the world this century. A full aspects survey was described in this paper. There are four aspects of this power outage have to be addressed. The first question involves the sequence of events in the blackout. The second problem relates to the direct power losses and indirect effect of the blackout to various social departments, such as traffic, residential life, finance and stock market, packinghouse, government and medical section, telecom and industries. The third aspect deals with the treatment of emergency and investigation of the cause of this outage. The final aspect focuses on the guidelines of the action plan to increase reliability of the LIES of Russia. Afterwards, some question is pointed out to probe the universal mechanism of cascading failures occurred in complex power system. To answer these questions, two research projects are proposed at the final stage of this paper.
【CateGory Index】: TM711
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【References】
Chinese Journal Full-text Database 1 Hits
1 MA Hong-bin1,HE Jin-liang1,CHEN Qing-heng2(1.State Key Lab of Power Systems,Department of Electrical Engineering,Tsinghua University,Beijing 100084,China;2.Huizhou Power Supply Bureau,China Southern Power Grid Co.,Ltd.,Huizhou 516000,China);Vibration and Sound Waveform Analysis of 500 kV Single Phase Power Transformer[J];High Voltage Engineering;2008-08
【Citations】
Chinese Journal Full-text Database 1 Hits
1 LU Zong-xiang (Tsinghua University, Beijing 100084, China);Survey of the Research on the Complexity of Power Grids and Reliability Analysis of Blackouts[J];Automation of Electric Power Systems;2005-12
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 Tang Yanyu; Wang Shiming;PORBABILITY DIFFERENTIAL METHOD─A PROGRAMMED METHOD ROF CALCULATING DENSITY OF PROBABILITY DISTRIBUTION OF CONTINUOUS TYPE[J];JOURNAL OF ANHUI INSTITUTE OF ARCHITECTURE;1995-02
2 SUN Jun?suo 1,CHENG Kan 2 (1.Dept. of Mathematics and Physics,,Anshan Institute of I.& S.Technology,Anshan 114002,China;2.Institute of Applied Mathematics,Academia Sinica,Bijing 100080,China);Application of the Discrete Total Time on Test Transform[J];JOURNAL OF ANSHAN INSTITUTE OF IRON AND STEEL TECHNOLOGY;2000-04
3 BAI Hong-xin1,2,ZHAO Guo-hui1 (1. College of Science, Yanshan University,Qinhuangdao 066004,China; 2. Department of Mathematics and Computer, Baoding University,Baoding 071000,China);Reliability Analysis of Three Components Warm Standby Repairable System with Safety and Reliable Switch[J];Journal of Baoding University;2008-02
4 Wu Wei;Zheng Mu-qiao;Dong Xiu-yuan(Beijing Institute of Technology,Beijing 100081);The Reliability of Markovian Series Repairable Mechanical System for Dependent Components[J];;1996-01
5 TAN Shu-ping~(1,2),YUAN Hong-tao~3,HAN Lu-liang~3(1.Beijing Institute of Control Engineering,Beijing 100080,China;2.Academy of Mathematics and System Science,Chinese Academy of Science,Beijing 100080,China;3.Beijing Special Vehicle Research Institute,Beijing 100072,China);Analysis of Fault Stochastic Process for Armored Vehicles[J];Acta Armamentarii;2006-06
6 Cheng Weihu(Department of Applied Mathematics, Beijing Polytechnic University, Beijing, 100022 );The Confidence interval of Variation Coefficient and Reliability for Extreme Value Distribution[J];JOURNAL OF BEIJING POLYTECHNIC UNIVERSITY;1999-02
7 SUN Jin kang LI Zheng neng (Beijing University of Aeronautics and Astronautics, Dept. of Flight Vehicle Design and Applied Mechanics);Failure-Rate Analysis of Repairable Systems[J];Journal of Beijing University of Aeronautics and Astronautics;2001-05
8 KONG De liang WANG Shao ping (Beijing University of Aeronautics and Astronautics, School of Automation Science and Electrical Engineering);Study on Availability Analysis for Repairable System[J];Journal of Beijing University of Aeronautics and Astronautics;2002-02
9 Wang Shaoping Tao Jianfeng Cui Mingshan Jiao Zongxia (School of Automation Science and Electrical Engineering, Beijing University of Aeronautics and Astronautics, Beijing 100083, China);Study on iterative availability algorithm of Markov renewal equation[J];Journal of Beijing University of Aeronautics and Astronautics;2004-12
10 Lu Xiaohui (Department of Industrial Management);The Prior Distribution in Bayesian Method for the Exponential Case[J];Journal of Beijing Institute of Technology;1990-01
【Co-references】
Chinese Journal Full-text Database 10 Hits
1 LI Long-shu 1,LING Cheng 2 (1.Educational Department Key Laboratory of Intelligent Computing & Signal Processing,Anhui University, Hefei 230039,China; 2.Department of Computer Science and Engineering, Anhui University, Hefei 230039, China);Research on knowledge representation based on temporal logic[J];Journal of Anhui University(Natural Sciences);2002-02
2 HAN Qing-heng (Shenyang Transformer Research Institute,Shenyang110179,China);Comparative Analysis of Measuring Methods for Sound Level in Transformers and Reactors[J];Transformer;2002-10
3 WANG Shi-shan,JI Sheng-chang,LI Yan-ming (Xi'an Jiaotong University,Xi'an710049,China);Application Research on Transformer On-Line Monitoring with Vibration Method[J];Transformer;2002-S1
4 SHANG Pei-xiang,CAI Rui-ju,WANG Xin-wei( Shangqiu Electric Power Bureau , Shangqiu 476000, China ; Universitg of Stirling, UK; Beijing Power Supply Company , Beijing 100031, China);Operation Feasibility Analysis of HV and LV Electromagnetic Ring Circuit for Regional Weak Power Networks[J];Electrical Equipment;2004-04
5 WANG Mengyun (High Voltage Dept., China Electric Power Research Institute, Beijing 100085,China);Statistics and Analysis of 110 kV and the Above Transformer Fault in 2004[J];Electrical Equipment;2005-11
6 SONG Gao, CUI Jing-chun , YUAN Dalu(China Electric Power Research Institute, Beijing 100085,China);Operation Statistics and Analysis of High Voltage Switchgear in 2004[J];Electrical Equipment;2006-02
7 WU Jing-tao~1, XIE Xiao-rong~2, WANG Li-ding~1, HU Jiong~1, ZHANG Tao~1(1. Beijing Sifang Relay Protection Automation Inc., Beijing 100085,China ; 2. Tsinghua University, Beijing 100084,China);Development and Prospect of WAMS in Power System[J];Electrical Equipment;2006-03
8 Xue Yusheng (Nanjing Automation Research Institute);A THEORETICAL PROOF OF DEEAC[J];Automation of Electric Power Systems;1993-07
9 Mao Yubin, Wang Xiuli, Wang Xifan(Xi'an Jiaotong University. 710049. Xi'an. China);GENETIC ALGORITHM FOR THE OPTIMAL MULTISTAGE TRANSMISSION NETWORK PLANNING[J];AUTOMATION OF ELECTRIC POWER SYSTEMS;1998-12
10 Zhu Min. Wang Dingyi (Huazhong University of Science and Technology, 430074, Wuhan, China);DAILY OPTIMAL OPERATION OF CASCADE HYDROELECTRIC POWER STATIONSBASED ON ARTIFICIAL NEURAL NETWORK[J];AUTOMATION OF ELECTRIC POWER SYSTEMS;1999-10
【Secondary Citations】
Chinese Journal Full-text Database 2 Hits
1 Guo Yongji(Tsinghua University, Beijing 100084, China);TO FOCUS ON IMPROVING POWER SYSTEM RELIABILITY——A Pondering over the East North-America Major Blackout[J];Automation of Electric Power Systems;2003-19
2 Meng Zhongwei, Lu Zongxiang, Song Jingyan(Tsinghua University, Beijing 100084, China);COMPARISON ANALYSIS OF THE SMALL-WORLD TOPOLOGICAL MODEL OF CHINESE AND AMERICAN POWER GRIDS[J];Automation of Electric Power Systems;2004-15
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved