Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Automation of Electric Power Systems》 2001-08
Add to Favorite Get Latest Update

TRE IMPLEMENTATION OF PEAK AND VALLEY TIME PRICEFOR ELECTRICITY AND THE RESPONSE OF LARGE INDUSTRIES

Li Yang1. Wang Zhihua1. Lu Yi1, Li Junhong2, Zhang Changhu2(1. Southeast University, Naming 210096. China)(2. Naming Power Supply Bureau. Naming 210008, China)  
As one special time--of-use (TOU) tariff. peak and valley time price is one of the measures for implementing DSM.The structure and price-setting strategy of TOU tariff based on peak-valley and the econometric model of large user'sresponse are expounded by using price theory and economics theory. Then the analysis of the six large industries' responsesince the implementation of the TOU tariff in Naming is obtained. Some useful conclusions can be drawn from the study ofthe response that efficient results of load management can be obtained from reasonable structure of TOU and the response isaffected by a variety of factors.This project is supported by the Foundation of Ministry of Education of China for Outstanding Young Teacher.
【Fund】: 教育部青年骨干教师基金资助项目
【CateGory Index】: F426.6
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved