Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Automation of Electric Power Systems》 2003-12
Add to Favorite Get Latest Update

A CANDIDATE RESTORING TREE CUTTING BASED ALGORITHM FOR REAL-TIME DISTRIBUTION SYSTEM RESTORATION

Wu Wenchuan, Zhang Boming (Tsinghua University, Beijing 100084, China)  
A novel algorithm for distribution system restoration named candidate restoring tree cutting is presented, which restore the de-energized devices by cutting candidate restoring trees instead of combining of breakers. This algorithm fully exploits the radial structure of de-energized network and can easily keep the structure of radial network. A approximate method is adapted to solve capacity and voltage constraints,and the burden of load flow calculation in restoring decreases dramatically. This algorithm also can restore the network with multiple outage zones efficiently. A three phase power flow program is used in this paper, so the restoration method also concerns the characters of unbalanced system.
【CateGory Index】: TM732
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【References】
Chinese Journal Full-text Database 3 Hits
1 ZHU Xin-ju~1 WANG Yi~2 WAN Ming-ming~1 (1.School of Electrical Engineering,China Three Gorges University,Yichang 443002,China; 2.Xiangshan Power Supply Bureau,Ningbo 315700,China);Research on Optimization of Maintenance Planning for Power Distribution Network[J];Shaanxi Electric Power;2009-01
2 SUN Da-yan;LIN Ji-keng;YUAN Long;WANG Gang;WANG Wen-jie;QIN Ling;GUO Xing;Jiangsu Electric Power Company;Department of Electric Power of Electronic Information and Engineering School , Tongji University;Key Laboratory of Smart Grid of Ministry of Education, Tianjin University;Electrical Power Research Institute of Electrical Company of Liaoning Province;Binhai Utility of Electrical Company of Tianjin;;A New Method for Determining Optimal Load Transfer Scheme in Distribution Network[J];Electric Power;2013-11
3 CHEN Kening;WU Wenchuan;ZHANG Boming;LI Fei;State Key Lab of Control and Simulation of Power Systems and Generation Equipments (Dept. of Electrical Engineering,Tsinghua University);Guizhou Power Grid Corp.;;A Robust Restoration Method for Active Distribution Network Based on IGDT[J];Proceedings of the CSEE;2014-19
【Co-references】
Chinese Journal Full-text Database 10 Hits
1 HAN Zhenxiang, QIAN Yuanping, WEN Fushuan Department of Electrical Engineering, Zhejiang University, Hangzhou 310027, China;Tabu search approach to fault diagnosis in power systems using fuzzy abductive inference[J];JOURNAL OF TSINGHUA UNIVERSITY(SCIENCE AND TECHNOLOGY);1999-03
2 LIN Dan,\ LI Min\|qiang,\ KOU Ji\|song(Institute of Systems Engineering, Tianjin University, Tianjin 300072, China);A GA-Based Method for Solving Constrained Optimization Problems[J];Journal of Software;2001-04
3 WANG Qin-Hui, CHEN En-Hong+, WANG Xu-Fa (Department of Computer Science and Technology, University of Science and Technology of China, Hefei 230027, China);Research and Development of Distributed Constraint Satisfaction Problems[J];Journal of Software;2006-10
4 CHEN Kang1,2,ZHENG Wei-Min1,2 1(Tsinghua National Laboratory for Information Science and Technology,Tsinghua University,Beijing 100084,China) 2(Department of Computer Science and Technology,Tsinghua University,Beijing 100084,China);Cloud Computing:System Instances and Current Research[J];Journal of Software;2009-05
5 PAN Xiao-Ying1, LIU Fang2, JIAO Li-Cheng1 1(Key Laboratory of Intelligent Perception and Image Understanding of the Ministry of Education of China, Institute of Intelligent Information Processing, Xidian University, Xi’an 710071, China) 2(School of Computer Science and Engineering, Xidian University, Xi’an 710071, China);Multiobjective Social Evolutionary Algorithm Based on Multi-Agent[J];Journal of Software;2009-07
6 WENG Yi wu, SU Ming, WENG Shi lie (Institute of Mechanical & Power Engineering under the Shanghai Jiaotong University, Shanghai, China, Post Code: 200030) //Journal of Engineering for Thermal Energy & Power. 1);Specific Features of Advanced Micro Gas Turbines and Their Application Prospects[J];Journal of Engineering for Thermal Energy and Power;2003-02
7 LIANG Zhen-feng~1,YANG Xiao-ping~1,ZHANG Ping~2(1.College of Water Resources and Hydroelectric Power,Xi'an University of Science and Technology,Xi'an 710048,China;2.Northwest Investigation Design and Research Institute,CHECC,Xi'an 710065,China);Distributed power generation technology and its development in China[J];Northwest Hydro Power;2006-01
8 Fang Wendi;Micro-grid Technology of Distributed Energy System[J];Sichuan Electric Power Technology;2008-04
9 Du Jiangang;Study on Self-healing Function of Smart Distribution Grid under Typical Connection[J];Sichuan Electric Power Technology;2009-S1
10 ;An Improved Loop-Impedance Method For Distribution Power Flow[J];Shandong Electric Power;2001-01
【Secondary References】
Chinese Journal Full-text Database 10 Hits
1 Zhong Junyi Luo Feipeng Chen Housi;Supplementary Tool and Simulation of Establishing Maintenance Schedule for Distribution Network[J];Sichuan Electric Power Technology;2008-03
2 FENG Yan-xi,ZHOU Bu-xiang,TIAN Huai-yuan(College of Electrical and Information,Sichuan University,Chengdou 610065 China);Research on Distribution Network Restoration Based on Binary Local PSO[J];Journal of Xihua University(Natural Science Edition);2011-01
3 ZHANG Wei 1,SUN Yun-lian 2,HU Wen 2(1.Changde Electric Power Bureau,Changde 415000,Hunan,China;2.School of Electrical Engineering,Wuhan University,Wuhan 430072,Hubei,China);Studies on Related Technology and Framework of Self-Healing in Smart Distribution Grid[J];Power System and Clean Energy;2013-04
4 Chen Xiaojing;Kong Bing;Deng Yawen;;Research on Reconfiguration of Distribution Network Based on Multi-Agent Technology[J];Sichuan Electric Power Technology;2013-06
5 Dong Limei;Shu Qin;Tan Fangming;;Fault Recovery of Smart Distribution Network Based on Multi-agent[J];Sichuan Electric Power Technology;2014-04
6 ZHANG Zhonghui;XIE Yimiao;WANG Hui;LI Xiaowen;WAN Haixiang;School of Information Engineering,Nanchang University;;Voltage Risk Assessment of Grid Considering Randomness of Wind-solar System Output[J];Water Resources and Power;2014-07
7 ZHANG Hong-jing~1,HE Yuan-yi~(2,3),TONG Wei-ming~3(1.Harbin College,Harbin 150068,China;2.NanJing Artillery College,NanJing 211132,China;3.Harbin Institute of Technology,Harbin 150001,China);Research and Design of Configuration Software in Distribution Automation System[J];Microprocessors;2005-05
8 Gong Daisheng, Yang Dongshu, Wang Wenqing, Yang Desheng (Anhui Nanri Software Co.,LTD.,Hefei 230088,China);Information Systems Operation Quality Evaluation Model Based on BP Neural Network[J];Microcomputer Applications;2011-12
9 ZHU Xin-ju~1 WANG Yi~2 WAN Ming-ming~1 (1.School of Electrical Engineering,China Three Gorges University,Yichang 443002,China; 2.Xiangshan Power Supply Bureau,Ningbo 315700,China);Research on Optimization of Maintenance Planning for Power Distribution Network[J];Shaanxi Electric Power;2009-01
10 GUO Jian~1,SU Ling~2 (l.Shanxi Guangling Power Supply Company,Guangling,037500,China; 2.School of Electric and Electronic Engineering,North China Electric Power University,Beijing,102206,China);Application of Hybrid Optimal Algorithm Combined Genetic and Simulation Annealing in Distribution Maintenance Scheduling[J];Shaanxi Electric Power;2011-06
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved