Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Automation of Electric Power Systems》 2003-22
Add to Favorite Get Latest Update

DISCUSSION ON BIDDING FRAME AND MODE OF REGIONAL ELECTRICITY MARKET

Yao Jiangang(Hunan University, Changsha 410082, China)  
In accordance with the actual situation of national economy and the operation characteristics of power grid in China, the bidding frame and mode of generation side electricity market are analyzed, and the present situation of domestic and foreign researches in this area are surveyed. Particularly the constructive advice are proposed about the function and responsibility divisions between Regional Power Dispatch Telecommunication Center and Provincial Power Dispatch Telecommunication Center, as well as the safe and stable operation mode of the electricity market. In addition, a novel bidding mode, called combined capacity contract with efficiency priority, is proposed, which will provide the new idea to the construction of regional electricity market.
【CateGory Index】: F426.61
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved