Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Automation of Electric Power Systems》 2004-12
Add to Favorite Get Latest Update

INVESTIGATION ON INCREMENTAL AND PARTIAL MODEL TRANSFERS BASED ON CIM

Liu Chongru, Sun Hongbin, Zhang Boming, Wang Zhinan (Tsinghua University, Beijing 100084, China)  
Based on the common information model (CIM) and CIM XML interoperability test, this paper proposes a set of criteria for incremental and partial model transfer. The problem of better exchanging system data has been solved by partial transfers of models, incremental data updating, and so on. Various incremental and partial model tests based on the original criteria are implemented. Satisfactory results have been obtained using the IEEE 14-node data as the self-operation test model. The criteria have been successfully applied in an actual system in China with thousands of nodes.
【Fund】: 国家重点基础研究专项经费资助项目(G1998020322);; 国家自然科学基金资助项目(50107005)
【CateGory Index】: TM734
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【References】
Chinese Journal Full-text Database 10 Hits
1 SHEN Bao-xing (Hangzhou Electric Power Bureau, Hangzhou 310014, China);Study on Management System of Line Losses in Distribution Network Based on CIM[J];Electrical Equipment;2007-02
2 WU Wen-chuan, SUN Hong-bin, ZHANG Bo-ming, WANG Zhi-nan,YAN Ya-qing, SHAO Li-dong, LIU Chong-ru, WANG Hao(Tsinghua University, Beijing 100084, China);Design of Integrated EMS/DTS System Based on IEC 61970[J];Automation of Electric Power Systems;2005-04
3 YAO Yu-bin, LIU Zhong-yao, CHEN Yong (Yantai Dongfang Electronic Information Industry Co Ltd, Yantai 264001, China);Transformer Representation Based on Common Information Model[J];Automation of Electric Power Systems;2005-18
4 YAO Jian-guo , ZHOU Da-ping , SHEN Bing-bing , DING Feng , ZHAO Jing-hu ZHUHong , ZHANG Zi-zhong , ZHANG Rui-peng (NARI Technology Development Co Ltd, Nanjing 210003, China) (Nanjing Power Supply Company, Nanjing 210024, China);Design and Implementation of a New Generation Distribution Automation and Management System[J];Automation of Electric Power Systems;2006-08
5 XIN Yao-zhong, TAO Hong-zhu, LI Yi-song, SHI Jun-jie (China National Electric Power Dispatching and Communication Center, Beijing 100031, China);E Language for Electric Power System Model Description[J];Automation of Electric Power Systems;2006-10
6 WANG Ning~1 YE Feng~2 XU Wenqing~2 YAO Yangchun~2 LU Xin~2 ZHOU Xin~2 WANG Yanrong~2 1.Beijing Jiaotong University,Beijing 100044,China 2.NARI-Relays Electric Co Ltd,Nanjing 211100,China;A CIM-supported Object-oriented Real-time Database Management System[J];Automation of Electric Power Systems;2006-16
7 SUN Hongbin1, LI Peng2, LI Mao2, ZHANG Boming1, LIU Yingshang2, WU Wenchuan1, LIU Chongru1, LIANG Shouyu2, FENG Yongqing2, YUAN Qihai1(1. State Key Lab of Power Systems, Department of Electrical Engineering, Tsinghua University, Beijing 100084, China)(2. China Southern Power Grid Company, Guangzhou 510623, China);Study and Design of Online Distributed Modeling System for China Southern Power Grid[J];Automation of Electric Power Systems;2007-10
8 XIE Shanyi1,LIANG Chenghui2,GAO Xinhua1,FAN Ying1,ZHOU Yilin1,GAO Ya1(1.Electric Power Research Institute of Guangdong Power Grid Corporation,Guangzhou 510600,China;2.Shandong University at Weihai,Weihai 264209,China);Application of CIM/CIS Interoperation Details in Multi-level Power Grid Dispatching[J];Automation of Electric Power Systems;2009-01
9 MI Weimin,LI Lixin,SHANG Xuewei,ZHOU Jingyang,QIAN Jing,XU Jiahui,PAN Yi(China Electric Power Research Institute,Beijing 100192,China);An Investigation on Hierarchical and Decomposition and Space-time Coordination Modeling for Interconnected Power Systems[J];Automation of Electric Power Systems;2009-15
10 XIE Shanyi,GAO Xinhua,ZHOU Yilin,GAO Ya(Electric Power Research Institute of Guangdong Power Grid Corporation,Guangzhou 510600,China);Integration of the IEC TC 57 CIM with the IEC 61850 SCL Model and Modeling of the UCIM[J];Automation of Electric Power Systems;2009-17
【Citations】
Chinese Journal Full-text Database 5 Hits
1 Zhang Shenming,H uang H aifeng Nanjing Autom ation Research Institue,Nanjing2 10 0 0 3,China;ARCHITECTURE OF POWER DISPATCHING AUTOMATION SYSTEM BASED ON IEC 61970 STANDARD[J];Automation of Electric Power Systems;2002-10
2 Zhang Shenming, Bu Fanqiang, Yao Jianguo, Yang Zhihong, Chen Mei, Zhao Jinghu, Cao Yang (Nanjing Automation Research Institute, Nanjing 210003, China);REAL-TIME DATABASE MANAGEMENT SYSTEM (DBMS) THAT CONFORMS TO IEC 61970 STANDARD[J];Automation of Electric Power Systems;2002-24
3 Liu Chongru 1, Sun Hongbin 1, Zhang Boming 1, Dong Yue 1, Xin Yaozhong 2 (1. Tsinghua University, Beijing 100084, China) (2. National Power Dispatching & Communication Center, Beijing 100031, China);AN INVESTIGATION ON A COMMON INFORMATION MODEL FOR ENERGY MANAGEMENT SYSTEM[J];Automation of Electric Power Systems;2003-14
4 Pan Yi, Zhou Jingyang, Li Qiang, Mi Weimin, Fan Tao (China Electric Power Research Institute, Beijing 100085, China);THE SEPARATION/COMBINATION OF POWER SYSTEM MODEL BASED ON CIM[J];Automation of Electric Power Systems;2003-15
5 XIN Yao\|zhong (National Power Dispaching & Communication Centre, Beijing 100761, China);DEVELOPMENT TREND OF POWER SYSTEM DISPATCHING AUTOMATION TECHNIQUE IN 21st CENTURY[J];Power System Technology;2001-12
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 ZHAO Yan-ping(Anhui Bozhou Power Supply Company,Bozhou 236800,China);Electricity Net Topology Analysis Based on Common Information Model[J];Journal of Anhui Electrical Engineering Professional Technique College;2006-01
2 WANG Xiao-tong(Dept.of Automation,Hefei Power Supply Company,Hefei 230022,China);Exploration on Configuration Schemes of the Modern Master Remote Control Station for Dispatching in Regional Power Grid[J];Journal of Anhui Electrical Engineering Professional Technique College;2009-03
3 Pan Guowei (North China Electric Power University);Research on the Application of Message Oriented Middleware in Electric Dispatching Automatization System[J];Electrotechnical Application;2008-10
4 Wang Xinghua(Guangdong University of Technology);Logical Analysis and Software Design of Data Import Between Superior and Subordinate Power Grid Dispatch Center[J];Electrotechnical Application;2008-20
5 LUO Jie(College of Electrical and Electronic Engineering,East China Jiaotong University,Nanchang 330013,China);The Application And Research Of the XML In EMS[J];Journal of Electric Power;2005-04
6 WANG Qing-qing,GAO Wei-qing (Xinchang Power Supply Bureau,shaoxing 312500,Zhejiang Province,China);Active Mode-Based Design of Integration Platform of Dispatching Parameters[J];Electric Power Construction;2010-10
7 ZHANG Qiang-zhong Network and Informationlization Center,Dalian University of Technology,Dalian 116024,China;Study and design of information integration platform for university based on CIM[J];Journal of Dalian University of Technology;2012-01
8 Li Meng,Qin Lijun,Guo Qing,Hao Cuijuan (School of Electrical and Electronic Engineering,North China Electric Power University,Beijing 102206,China);CIM-based Network Topology Analysis[J];Electric Power Science and Engineering;2011-09
9 ZHANG Da-li (Guangxi Power Grid Company, Nanning 530023, China);Development and Application on Integration of Power Dispatching and Distribution Automation in County-Level Power Network[J];Electrical Equipment;2008-04
10 ZHANG Qiang1,HENG Lei1,SUN Peng2(1.Jiangsu Pizhou Power Supply Company,Pizhou 221000,China;2.China Mining and Technology University,Xuzhou 221008,China);Application of Distribution Transformer Monitoring and Management System Based on GPRS Technique[J];Electrical Equipment;2008-05
China Proceedings of conference Full-text Database 10 Hits
1 ;昆明电网OPEN3000系统应用分析[A];[C];2011
2 ZHANG Boming, ZHOU Jianqun, HUANG Hongqing (Hangzhou linan city electricity, Lin’an 311300, Zhejiang, China);“Based on the Grid Control Integration” Intelligent Decision Support System of Information Management[A];[C];2010
3 Wang Cuiru~1 Xin Rui~1 Han Xiaona~2 1 School of computer science and technology North China Electric Power University,Baoding 071003; 2 School of computer science and technology North China Electric Power University,Beijing 102206;The Research of Knowledge Representation Based on Ontology for Power Network Dispatching System[A];[C];2008
4 ZHANG Kun-feng XU Hai-dan (Three Gorges Hydro Power Plant,Yichang 443000,Hubei Province,China).;Application of Message Queue Middleware in the SCADA/EMS[A];[C];2008
5 Guo Qing-lai, Sun Hong-bin, Zhang Bo-ming, Li Qin (State Key Lab of Power Systems, Dept. of Electrical Engineering, Tsinghua University, Beijing 100084, China);Extension of Common Information Model for Automatic Voltage Control System[A];[C];2006
6 QIAN Feng, GU Quan ( NARI-Relays Electric Co.Ltd, Nanjing 211100, China; Department of Electrical Engineering, South East University, Nanjing 210096, China);The Network Frame Topology and the Judgement of Connecting Equipments Between Islands in the Electrical Dispatching System[A];[C];2006
7 YANG Sheng-chun, YAO Jian-guo, GAO zong-he, YANG Zhi-hong (NARI Technology Development Limited Company, Nanjing 210003, Jiangsu Province, China);Intelligent Dispatching Decision-making System Based on Integration of Power Dispatching Automation System[A];[C];2006
8 JIANG Bin, TANG Xiao-li, YE Qing-hua (Nari-relays Electric CO.,LTD, Nanjing 211110, Jiangsu Province, China);Realization Scheme of Power Grid Web Technology Based on SVG[A];[C];2006
9 LI Ya-ping, YAO Jian-guo, HUANG Hai-feng, CAO Yang, Han Tao, Song Xin (Nanjing Automation Research Institute, Nangjing 210003, Jiangsu Province, China);Interoperation of Geographical Wiring Diagrams Based on SVG[A];[C];2006
10 ;Online security monitoring of Power Systems[A];[C];2014
【Co-references】
Chinese Journal Full-text Database 10 Hits
1 GAO Qing-wei,ZHANG Dao-xin,CHENG Pu (Department of Automation of Anhui University,Hefei 230039,China);Restrain Method on DFT Frequency Spectrum Leakage Base on Symmetry Extension[J];JOURNAL OF ANHUI UNIVERSITY(NATURAL SCIENCES);2000-02
2 DING Shi-jun,TAO Ben-zao(School of Geodesy and Geomation,Wuhan University,Huban 430079);Semiparametric model and appliation of deformation analysis[J];Science of Surveying and Mapping;2004-05
3 LI Jinlian ①②, LIU Xiaomei ②,HE Qiaoning ③(①Chinese Academy Of Sciences Nanjing Institute Of Geography & Limnology, Nanjing 210008, P.R.China ;②Graduate school, Chinese Academy of Sciences, Beijing 100039,China;③HOHAI University);The organizationand realization of watershed data based on geodatabase data module[J];Science of Surveying and Mapping;2005-06
4 PEI Ya bo,LI Guang lan,LUN Xiao wei,YANG Tang tang,Hu Da guo;Design of the Check_-up System of Primary Spatial Data for GIS[J];Bulletin of Surveying and Mapping;2003-10
5 LIU Ren yi 1, LIU Nan 1,SU Guo zhong 2 (1. Xixi Campus,Zhejiang University, Hangzhou 310028,China; 2. Hainan Provincial Geomatics Inform ation Center, Haikou 570203,China);Manipulation of Spatial Graphical Data in RDBMS and Its Implementation in Application of GIS[J];ACTA GEODAETICA ET CARTOGRAPHIC SINICA;2000-04
6 HUANG Weiduo1,XU Chang1,DUAN Yonggang1,DENG Chengfa2(1.Zhejiang Water Conservancy and Hydropower College,Hangzhou 310018,China;2.Zhejiang Institute of Hydraulics & Estuary;Hangzhou 310020,China);Application of Principal Component Regression to Dam Safety Monitoring[J];Hydropower Automation and Dam Monitoring;2009-01
7 TANG Lin,ZHANG Yan,LI Hong-bin (School of Electrical and Electronic Engineering, Huazhong University of Science and Technology, Wuhan 430074, China);Application of Interpolation Algorithm for Harmonic Analysis of HVDC[J];Electrical Measurement & Instrumentation;2006-01
8 CHANG Hong~1, RU Feng~2, XUE Jun-yi~1(1. School of Electrical Engineering, Xi'an Jiaotong University, Xi'an 710049, China;2. Jiangsu Provincial Electric Power Research Institute, Nanjing 210036, China);Interoperability analyses and system implement to IEC61850 semantic information model[J];Advanced Technology of Electrical Engineering and Energy;2005-03
9 Chen Mingkai Zheng Xiangji Wang Xiaoqiang (Fuzhou University Fuzhou 350002 China);A Novel Algorithm for Reducing Spectrum Leakage Based on Equal Angle-Interval Sampling Principle[J];Transactions of China Electrotechnical Society;2005-08
10 Hong Lucheng1 Shi Libao1 Yao Liangzhong2 Masoud Bazargan2 Ni Yixin1 (1. Graduate School at Shenzhen,National Key Laboratory of Power Systems in Shenzhen Tsinghua University Shenzhen 518055 China 2. AREVA T&D Technology Centre Stafford ST17 4LX UK);Fuzzy Modelling and Solution of Load Flow Incorporating Uncertainties of Wind Farm Generation[J];Transactions of China Electrotechnical Society;2010-08
China Proceedings of conference Full-text Database 1 Hits
1 He Zhaoyang ( Huazhong University of Science and Technology);Research on On-line Automatic Analysis of Power System Operation Status[A];[C];2004
【Secondary References】
Chinese Journal Full-text Database 10 Hits
1 HU Yan1,TAI Neng-ling1,WANG Jing2(1.School of Electronic Information and Electrical Engineering,Shanghai Jiao Tong University,Shanghai 200240,China;2.Hubei Power Dispatching Centre,Wuhan 430077,China);Data model research of operating command expert system for underground substations[J];Journal of Electric Power Science and Technology;2010-02
2 QIAN Cheng,WU Ning,CHEN Yi,XIANG Nan(State Grid Electric Power Research Institute,Nanjing 210003,China);Application of Reusable Pattern in IEC 61850 Unified Modeling[J];Hydropower Automation and Dam Monitoring;2012-02
3 WU Wen-zhong(Experimental Teaching Center,Guangdong University of Finance,Guangzhou 510521,China);Development of Smart Meter Based on LonWorks Technology[J];Electrical Measurement & Instrumentation;2011-03
4 Guan Feng (Beijing Jiaotong University);Research and Design of Training Simulation System on Local Area Network for Power Substation[J];Electrotechnical Application;2007-03
5 FANG Guo-zhi,SONG Guo-yi (School of Measure-control Technology & Communication Engineering,Harbin University of Science and Technology,Harbin 150040,China);A circuits model of transformer for direct analysis and calculation[J];Electric Machines and Control;2007-03
6 WANG Huapeng,YANG Wei,XU Zhi,LIU Xiaoping,LIU Yang,LI Jinsong(China Electric Power Research Institute,Beijing 100192,China);Research on Model Conversion Technology of Source Servicing in Unified Information Platform of Smart Substation[J];Electric Power Construction;2012-01
7 ZHANG Qiang-zhong Network and Informationlization Center,Dalian University of Technology,Dalian 116024,China;Study and design of information integration platform for university based on CIM[J];Journal of Dalian University of Technology;2012-01
8 Dong Lixin1,Lei Huiling2(1.Xinjiang Tianye Group TianChen Generating Company,Shihezi 832000,China;2.Xinjiang Tianfu Electric Power Company,Shihezi 832000,China);Research on Relay Protection Professional Informatization Construction[J];Electric Power Science and Engineering;2011-01
9 CHEN Qing-he, LIU Dong, LI Li-fang(Shanghai Jiaotong University, Shanghai 200030, China;CIM Based Three-phase Power Flow for Distribution Systems[J];Automation of Electric Power Systems;2005-23
10 LI Ya-ping, YAO Jian-guo, HUANG Hai-feng, CAO Yang, HAN Tao, SONG Xin Nanjing Automation Research Institute, Nanjing 210003, China;Application of SVG in the Dispatching Automation System of Power Network[J];Automation of Electric Power Systems;2005-23
China Proceedings of conference Full-text Database 10 Hits
1 Zhao Ying(Yunnan Power Grid Dispatching Control Center,Yunnan,650011,China);Dispatching information integration based on service-oriented architecture[A];[C];2011
2 QIN Zhi-jun WEI Hua(Guangxi University,Nanning 530004,China);THE DESIGN AND IMPLEMENTATION OF DISTRIBUTED ALARM SUB-SYSTEM IN THE EMS DISTRIBUTED SUPPORT PLATFORM[A];[C];2006
3 Guo Qing-lai, Sun Hong-bin, Zhang Bo-ming, Li Qin (State Key Lab of Power Systems, Dept. of Electrical Engineering, Tsinghua University, Beijing 100084, China);Extension of Common Information Model for Automatic Voltage Control System[A];[C];2006
4 LI Ya-ping, YAO Jian-guo, HUANG Hai-feng, CAO Yang, Han Tao, Song Xin (Nanjing Automation Research Institute, Nangjing 210003, Jiangsu Province, China);Interoperation of Geographical Wiring Diagrams Based on SVG[A];[C];2006
5 DU Hong-wei, XU Xian-feng, SU Biao-long ,ZHAO Jing-hu, WANG Wei, MAO Xiao-wu, JIANG Yong ( Nanjing Automation Research Institute, Nanjing 210003,Jiangsu Province,China, Nanjing Power Supply Company,Nanjing 210024,Jiangsu Province,China);Design and Implementation of Dispatch Work Management Systems on Distribution Network[A];[C];2006
6 LI Weiqing LIN Changnian YANG Xuanhuai WU Huizhong Nanjing University of Sci & Tech, Nanjing 210094; China Electric Power Research Institute Beijing 100085;HLA-based Emergency Simulation of Power System[A];[C];2006
7 WANG Lihua,WANG Zhimin,REN Yanming,YU Bin (Beijing Sifang Automation Co.,Ltd,100085,China);Design and Realization of IEC61850 Communication Module Based on Plag-in Technique[A];[C];2011
8 LI Peng,WANG Xuelun(Tianjin Electric Power Design Institute,Tianjin 300400,China);Intelligent Distribution Automation System and Information Fusion[A];[C];2013
9 BAI Richang;LI Ying;SHUAI Lingling;CHEN Ying;Jiangxi Electric Power Company Extra-high Voltage Sub-company;State Key Lab of Power Systems,Dept.of Elec.Eng.,Tsinghua University;;Design of a Power System Information Platform Based on CIM[A];[C];2012
10 Shuai Lingling;Tian Guoying;Li Xiaolu;Zhou You;Jiangxi Electric Power Company Extra-high Voltage Sub-company;SDQI;Yantai Dongfang Electronics Information Industry Co.,Ltd.;;Vertical integration study on power grid model of remote terminal unit and monitor center[A];[C];2012
【Secondary Citations】
Chinese Journal Full-text Database 6 Hits
1 Dong Yue,Sun H ongbin,Zhang Boming,Wu Wenchuan,L iu Chongru Tsinghua University,Beijing10 0 0 84,China;IMPORT/EXPORT TECHNIQUE BASED ON COMMON INFORMATION MODEL CIM IN EMS[J];Automation of Electric Power Systems;2002-03
2 Zhang Shenming,H uang H aifeng Nanjing Autom ation Research Institue,Nanjing2 10 0 0 3,China;ARCHITECTURE OF POWER DISPATCHING AUTOMATION SYSTEM BASED ON IEC 61970 STANDARD[J];Automation of Electric Power Systems;2002-10
3 Zhang Shenming, Liu Guoding (Nanjing Automation Research Institute, Nanjing 210003, China);INTRODUCTION OF STANDARD IEC 61970[J];Automation of Electric Power Systems;2002-14
4 Zhang Shenming, Bu Fanqiang, Yao Jianguo, Yang Zhihong, Chen Mei, Zhao Jinghu, Cao Yang (Nanjing Automation Research Institute, Nanjing 210003, China);REAL-TIME DATABASE MANAGEMENT SYSTEM (DBMS) THAT CONFORMS TO IEC 61970 STANDARD[J];Automation of Electric Power Systems;2002-24
5 XIN Yao\|zhong (National Power Dispaching & Communication Centre, Beijing 100761, China);DEVELOPMENT TREND OF POWER SYSTEM DISPATCHING AUTOMATION TECHNIQUE IN 21st CENTURY[J];Power System Technology;2001-12
6 HE Jiang, WU Xing ping, LI Li xin, FAN Tao, MI Wei min (Electric Power Research Institute China, Beijing 100085, China);A COMPONENT BASED REAL-TIME DATABASE MANAGEMENT PLATFORM[J];Power System Technology;2002-03
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved