Research and Realization of the High Accuracy GPS Synchronization Clock

WU Ning, PAN Xiaolong, YU Jiexia(Nanjing University of Aeronautics & Astronautics, Nanjing 210016, China)  
This paper presents a new method of implementing the highly accurate clock by the synchronization of crystal oscillator clock with the GPS clock, which is based on the complementation of the accuracy of the GPS and crystal oscillator. The method accurately measures the actual frequency of the crystal oscillator clock by the one pulse per second of GPS, then corrects the crystal oscillator clock on-line and corrects the absolute timestamp by the IRIG-B code. The synchronous timer can keep its precision at 0.1 μs and is not affected by the possible transient invalidation of GPS. The synchronous clock based on FPGA has been applied in phasor measurement of a power system. It not only features high precision and high integrity, but also works stably as long as 6 hours when the GPS signal becomes ineffective.
【CateGory Index】: P228.4
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【References】
Chinese Journal Full-text Database 4 Hits
1 XIE Li,HUANG Guofang,SHEN Jian(State Grid Electric Power Research Institute,Nanjing 210003,China);Design of High Accuracy Synchronous Sampling Clock in Digital Substations[J];Automation of Electric Power Systems;2009-01
2 JIANG Daozhuo1,SHENTU Gang1,LI Haixiang2,WU Zhili3,YANG Guiyu1(1.Zhejiang University,Hangzhou 310027,China;2.Zhejiang Electric Power Cooperation,Hangzhou 310007,China;3.Zhejiang Electric Power Design Institute,Hangzhou 310012,China);Significance and Roles of Standardized Basic Information in Developing Smart Grid[J];Automation of Electric Power Systems;2009-20
3 Wu Anchu.Shengli Geophysical Corporation,Sinopec Group,Dongying 257100,China;Review of high density seismic data acquisition based on wireless point receiver[J];Progress in Exploration Geophysics;2009-02
4 ZOU Xuan ZHANG Xi (Shaanxi Electric Power Design Institute,Xi'an 710054,China);Optimization Design of GPS Time Synchronization System in 330kV Substations[J];Shaanxi Electric Power;2009-01
【Citations】
Chinese Journal Full-text Database 4 Hits
1 Zeng Xiangjun 1,2,3, Yin Xianggen 2, Lin Gan 3, Zhou Yanling 3 (1. Changsha University of Electric Power, Changsha 410077, China) (2. Huazhong University of Science and Technology, Wuhan 430074, China) (3. Xiangneng-Xvji Company, Changsha 410013, China);CLOCK OF HIGH ACCURACY IMPLEMENTED BY CRYSTAL OSCILLATOR IN SYNCHRONISM WITH GPS-CLOCK[J];Automation of Electric Power Systems;2003-08
2 ZHANG Peng, WANG Shao-rong, CHENG Shi-jie (Huazhong University of Science and Technology, Wuhan 430074, China);Stability study of GPS synchronous clock in the status monitoring system of power network[J];Relay;2004-23
3 ZENG Xiang-jun1, YIN Xiang-gen2, K K Li3, W L Chan3 (1.Dept. of Electrical Engineering, Changsha University of Electric Power, Changsha 410077, China; 2.College of Electrical & Electronic Engineering, Huazhong University of Science and Technology, Wuhan 430074, China ;3. Dept. of Electrical Engineering, The Hong Kong Polytechnic University, Hong Kong, China);METHODS FOR MONITORING AND CORRECTING GPS-CLOCK[J];Proceedings of the Csee;2002-12
4 ;Some Technical Problems of Satellite Clock Applied on Power Network[J];ELECTRIC POWER;1998-02
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 HUANG Fei,MING De-xiang,QIAO Chun-jie,WANG Yue-ke (College of Mechatronics Engineering and Automation,National University of Defense Technology,Changsha 410073,Hunan,China);Design of Multi-benchmark Time Source in Time Unification System[J];Acta Armamentarii;2008-11
2 Du Mingming Zhou Luowei Ma Jing Fu Zhihong (State Key Laboratory of Power Transmission Equipment & System Security and New Technology, Chongqing University Chongqing 400044 China);GPS and TCXO Bisynchronous Transient Electromagnetic Measuring Controller[J];Transactions of China Electrotechnical Society;2008-12
3 Zeng Xo'angjun. YI'n Xo'anggen, Chen Deshu, Lin Fuchang, Wei Feng(Huazhong University of Science and Technology, 430074, Wuhan. China)Zou Jianming (Central China Power Group. 430077, Wuhan, China);GPS TRAVELLING WAVE FAULT LOCATION SYSTEMS FOR TRANSMISSION NETWORK[J];AUTOMATION OF ELECTRIC POWER SYSTEMS;1999-10
4 Zhao Wentao,Wang Shumin,Zhu Guiping,Pan Yinxuan Tsinghua University,Beijing 10 0 0 84 ,China;INTERNET-BASED POWER QUALITY MONITORING AND ANALYZING SYSTEM[J];Automation of Electric Power Systems;2002-06
5 Zeng Xiangjun 1,2,3, Yin Xianggen 2, Lin Gan 3, Zhou Yanling 3 (1. Changsha University of Electric Power, Changsha 410077, China) (2. Huazhong University of Science and Technology, Wuhan 430074, China) (3. Xiangneng-Xvji Company, Changsha 410013, China);CLOCK OF HIGH ACCURACY IMPLEMENTED BY CRYSTAL OSCILLATOR IN SYNCHRONISM WITH GPS-CLOCK[J];Automation of Electric Power Systems;2003-08
6 ZHONG Shan , FU Ja-wei , WANG Xiao-ru ( Southwest Jiaotong University, Chengdu 610031, China) ( Zhuzhou Times Electronic Technology Co Ltd, Zhuzhou 412007, China);Development of High Quality Backup Clock for Synchronized Phasor Measurement Unit[J];Automation of Electric Power Systems;2006-01
7 LI Zewen, ZENG Xiangjun, HUANG Zhiwei, LEI Li, MA HongJiang Changsha University of Science and Technology, Changsha 410076, China Hunan Hydro and Power Design Institute, Changsha 410007, China;Method for Correcting Errors of the GPS-clock Based on the High Precision Crystal Oscillator[J];Automation of Electric Power Systems;2006-13
8 HUA Huangsheng1,YOU Dahai1,2,YU Hongwei2(1.Huazhong University of Science and Technology,Wuhan 430074,China;2.Wuhan Huagong Electric Automation Co Ltd,Wuhan 430074,China);New Method of Producing Clock of High Accuracy for Substations Based on Error Analysis[J];Automation of Electric Power Systems;2008-08
9 SHEN Tugang1,QIAN Gang1,2,YANG Guiyu1,JIANG Daozhuo1,WU Wenxuan3(1.Zhejiang University,Hangzhou 310027,China;2.Shaoxing Electric Power Bureau,Shaoxing 312000,China;3.Fujian Electric Power Test and Research Institute,Fuzhou 350007,China);A Novel RTU Based on Time Synchronization[J];Automation of Electric Power Systems;2008-15
10 LIU Huiyuan1,HAO Houtang2,LI Yanxin2,SUN Bin2(1.Inner Mongolia Power Group,Huhhot 010020,China;2.State Grid Electric Power Research Institute,Nanjing 210003,China);Research on a Synchronism Scheme for Digital Substations[J];Automation of Electric Power Systems;2009-03
China Proceedings of conference Full-text Database 2 Hits
1 Yi Xiongshu~1 Wang Hongxia~1 Yu Shaobo~2 Wang Changyuan~1 1 School of Information Science & Technology,Southwest Jiaotong University,Chengdu 610031; 2.Xinguang Microwave Engineering Ltd.,Chengdu 610041;The Study and Design of DMB-TH SFN Time Synchronous Device Based on GPS[A];[C];2007
2 ZHOU Jie YANG Yongbiao XIE Li LIU Qingyi(NARI Technology Development Limited Company,Nanjing,210003);DISCUSSION OF RELAY AND FAULT RECORDING INTEGRATIVE UNIT[A];[C];2006
【Co-references】
Chinese Journal Full-text Database 10 Hits
1 Zhu Daxin (National Power Company Power Automation Institute);The Development of Intergrated Automation System of Digital Transformer Station[J];Electrotechnical Journal;2001-04
2 Ren Yanming, QI'n La'j'un. Yang Qixun (North China Electric Power University, Beijing 100085, China);STUDY ON IEC 61850 COMMUNICATION PROTOCOL ARCHITECTURE[J];AUTOMATION OF ELECTRIC POWER SYSTEMS;2000-08
3 Chen Ping 1, Xu Bingyin 2, Li Jing 2, Dong Xinzhou 3, Ge Yaozhong 1 (1. Xi'an Jiaotong University, Xi'an 710049, China) (2. Shandong Kehui Electric Co Ltd, Zibo 255031, China) (3. Tsinghua University, Beijing 100084, China);MODERN TRAVELLING WAVE BASED FAULT LOCATOR AND ITS OPERATING EXPERIENCE[J];Automation of Electric Power Systems;2003-06
4 Zeng Xiangjun 1,2,3, Yin Xianggen 2, Lin Gan 3, Zhou Yanling 3 (1. Changsha University of Electric Power, Changsha 410077, China) (2. Huazhong University of Science and Technology, Wuhan 430074, China) (3. Xiangneng-Xvji Company, Changsha 410013, China);CLOCK OF HIGH ACCURACY IMPLEMENTED BY CRYSTAL OSCILLATOR IN SYNCHRONISM WITH GPS-CLOCK[J];Automation of Electric Power Systems;2003-08
5 Jiang Daozhuo 1, Sun Weihua 1, Chen Susu 2 (1.Zhejiang University, Hangzhou 310027, China) (2.Yuhuan Power Supply Bureau of Zhejiang Province, Yuhuan 317600, China);A NEW METHOD OF REAL TIME AND SYNCHRONOUS MEASUREMENT ON POWER NETWORK PHASE PARAMETERS[J];Automation of Electric Power Systems;2003-15
6 Zhao Jinrong, Wang Haifeng (Nanjing Automation Research Institute, Nanjing 210003, China);IMPLEMENTATION OF SUBSTATION AUTOMATION SYSTEM BASED ON THE EMBEDDED ETHERNET TECHNIQUE[J];Automation of Electric Power Systems;2004-11
7 GAO Zonghe~1 DAI Zemei~1 ZHAI Mingyu~1 SU Dawei~2 XU Chunlei~2 1.NARI Technology Development Limited Company,Nanjing 210003,China 2.Jiangsu Electric Power Company,Nanjing 210024,China;Integrative EMS and WAMS Based on a Unified Supporting Platform[J];Automation of Electric Power Systems;2006-16
8 LIN Feng, HU Mu, JIANG Yuanchen, NI Bin(Nanjing Automation Research Institute, Nanjing 210003, China);Architecture and Related Techniques of a Power Dispatching Data Platform[J];Automation of Electric Power Systems;2007-01
9 SUN Yimin, LI Yanxin, LI Qiang(Nanjing Automation Research Institute, Nanjing 210003, China);A Grading Solution for Building Digital Station[J];Automation of Electric Power Systems;2007-05
10 JIANG Daozhuo, L Xiang, YANG Guiyu(Zhejiang University, Hangzhou 310027, China);A Novel Phasor Measurement Unit with Free Scaled Synchronized Time-mark[J];Automation of Electric Power Systems;2008-03
【Secondary References】
Chinese Journal Full-text Database 3 Hits
1 JIANG Daozhuo1,SHENTU Gang1,LI Haixiang2,WU Zhili3,YANG Guiyu1(1.Zhejiang University,Hangzhou 310027,China;2.Zhejiang Electric Power Cooperation,Hangzhou 310007,China;3.Zhejiang Electric Power Design Institute,Hangzhou 310012,China);Significance and Roles of Standardized Basic Information in Developing Smart Grid[J];Automation of Electric Power Systems;2009-20
2 CAO Tuanjie,CHEN Jianyu,HUANG Guofang(NARI Technology Development Co.Ltd.,Nanjing 210061,China);A Study on Data Synchronization Method for Optical Fiber Differential Protection Based on IEC 61850-9[J];Automation of Electric Power Systems;2009-24
3 CAO Tuan-jie1,2,DAI Chang-zhen3,WEI Fen-qing3,XIE Li1 (1.NARI Technology Development Co., Ltd, Nanjing 210003, Jiangsu Province, China; 2.Nanjing Sino-German Protection &Control Systems Ltd, Nanjing 210003, Jiangsu Province, China; 3.State Grid Electric Power Research Institute, Nanjing 210003, Jiangsu Province, China);The Mailbox-like Data Sampling Transmitting Mechanism in Digital Protection[J];Power System and Clean Energy;2009-11
【Secondary Citations】
Chinese Journal Full-text Database 10 Hits
1 Zeng Xo'angjun. YI'n Xo'anggen, Chen Deshu, Lin Fuchang, Wei Feng(Huazhong University of Science and Technology, 430074, Wuhan. China)Zou Jianming (Central China Power Group. 430077, Wuhan, China);GPS TRAVELLING WAVE FAULT LOCATION SYSTEMS FOR TRANSMISSION NETWORK[J];AUTOMATION OF ELECTRIC POWER SYSTEMS;1999-10
2 Gong Qingwu1 ,Liu Meiguan2 ,Zuo Kefeng1 ,Zhang Chengxue1 ,Li Xiaolu1 1.Wuhan University of Hydraulic and Electric Engineering,Wuhan 430 0 72 ,China 2 .Changsha Power Supply Bureau,Changsha410 0 0 7,China;ANTI-JAMMING METHODSFOR PULSE PER SECOND SIGNAL IN SYNCHRONIZED SAMPLING UNIT BASED ON GPS[J];AUTOMATION OF ELECTRIC POWER SYSTEMS;2000-01
3 Miao Shihong1. Wang Shaorong1. Liu Pei1. Cheng Shijie1, Fu Weisheng2. Wang Jianxiong2(1. Huazhong University of Science and Technology. Wuhan 430074, China)(2. Hu'nan Province Electric Power Dispatching Communication Bureau. Changsha 410007, China);THE DESIGN AND IMPLEMENTATION OF THE GPS BASED REAL-TIME MONITORINGSYSTEM FOR THE STATES OF POWER NETWORK[J];AUTOMATION OF ELECTRIC POWER SYSTEMS;2000-12
4 Zeng Xiangjun 1,2,3, Yin Xianggen 2, Lin Gan 3, Zhou Yanling 3 (1. Changsha University of Electric Power, Changsha 410077, China) (2. Huazhong University of Science and Technology, Wuhan 430074, China) (3. Xiangneng-Xvji Company, Changsha 410013, China);CLOCK OF HIGH ACCURACY IMPLEMENTED BY CRYSTAL OSCILLATOR IN SYNCHRONISM WITH GPS-CLOCK[J];Automation of Electric Power Systems;2003-08
5 ZHANG Hai-wen,ZHANG Peng,WANG Shao-rong,CHENG Shi-jie(Huazhong University of Science and Technology,Wuhan430074,China);Development of high quality time synchronous device based on GPS[J];Electric Power Automation Equipment;2003-04
6 Gao Houlei;He Jiali;Jiang Shifang(Tianjin University Tianjin,300072 China)(Shandong University of Technology Jinan,2500l4 China);GPS-BASED SYNCHRONIZED SAMPLING AND ITS APPLICATION IN PROTECTION AND CONTROL[J];POWER SYSTEM TECHNOLOGY;1995-07
7 Miao Shihong\ Wang Shaorong\ Liu Pei\ Cheng Shijie Miao Shihong\ Wang Shaorong\ Liu Pei\ Cheng Shijie Miao Shihong\ Wang Shaorong\ Liu Pei\ Cheng Shijie (Huazhong University of Science and Technology\ Wuhan\ 430074);A Time Synchronous Device Based on GPS[J];Computer and Peripherals;2000-01
8 ;The Development of GPS Synchronous Transient Data Acquisition Systems[J];HIGH VOLTAGE ENGINEERING;2000-02
9 WANG Zheng Ming DONG Shao Wu REN Yan QI Yi LIU Chun Xia WANG Gai Xia (Shaanxi Astronomical Observatory,the Chinese Academy of Sciences,Lintong,Shaanxi,710600);A Report on the Test Running of the Two R100/30T GPS/GLONASS Receivers at CSAO[J];Publications of The Shanxi Astronomical Observatory;2001-02
10 ZENG Xiang-jun1, YIN Xiang-gen2, LIN Fu-chang2, LI Xiao-hua2, CHEN De-shu2 (1. Department of Electric Power, Changsha University of Electric Power, Changsha 410077, China ; 2. College of Electrical & Electronic Engineering, Huazhong University of Scie;STUDY ON FAULT LOCATION FOR TRANSMISSION LINES BASED ON THE SENSOR OF TRAVELING-WAVE[J];Proceedings of the Csee;2002-06
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved