Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Automation of Electric Power Systems》 2013-01
Add to Favorite Get Latest Update

Development of Energy Storage in Frequency Regulation Market of United States and Its Enlightenment

CHEN Dayu1,ZHANG Lizi1,WANG Shu2,MOU Liufeng2(1.School of Electrical & Electronic Engineering,North China Electric Power University,Beijing 102206,China; 2.Ray Power Systems Ltd.,Beijing 100026,China)  
Along with the development and grid integration of massive variable energy resources,mainly including wind and solar generation,large-scale energy storage systems with capability of instantaneous and precise output control can effectively assist automatic generation control(AGC) and provide superior quality of frequency regulation service for power systems.The fundamental framework of frequency regulation compensation newly issued by Federal Energy Regulatory Commission(FERC) of United States and the corresponding latest proposals of new market designs by independent system operators(ISOs)/ regional transmission operators(RTOs) are introduced.Suggestions for further improvement of frequency regulation market are proposed based on an analysis of regulatory practice and operational experience of frequency regulation service in China,as well as its existing issues.
【CateGory Index】: TM91;F426.6
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Citations】
Chinese Journal Full-text Database 1 Hits
1 Li Xuezhong,Sun Weipeng,Feng Tingyou,Jiang Yong(Huaneng Haimen Power Plant,Shantou 515132,China);Experimental Research on the Energy Consumption of the Instantaneous Load in 1036MW Unit[J];Modern Electric Power;2011-02
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 Yun Tian-ji1,Weng Sha-sha2(1.Hainan Electric Power Design Institute,Haikou 570203,China; 2.Hainan Power Grid Control Center,Haikou 570203,China);Research on Wind Farm Penetration by Use of Automatic Generation Control[J];North China Electric Power;2011-11
2 CHEN Huan-yuan,LIU Xin-dong,SHE Cai-qi(College of Electrical Information Engineering,Jinan University,Zhuhai 519070,China);Wind Power System Peak Load Regulation Based on Grey nonlinear PID Control[J];East China Electric Power;2011-09
3 YUAN Zhi-qiang~1, ZHANG Jun-min~2, HOU Zhi-jian~3, XIE Ning~3 (1.Shanghai Electric Power Design Institute, Shanghai 200025, China;2.Shanghai Electric Power Company, Shanghai 201600, China;3.Shanghai Jiaotong University, Shanghai 200030,China);Analysis of equilibrium in electricity and reserve market bidding based on Cournot model[J];Relay;2005-02
4 WANG Ya-jun, FANG Da-zhong (School of Electrical and Automation Engineering ,Tianjin University, Tianjin 300072,China);Research on AGC unit dispatch based on particle swarm optimization algorithm[J];Relay;2007-17
5 LI Xue-ling,ZHOU Jie-na(School of Electrical Engineering,Guizhou University,Guiyang 550003.China);AGC cost in the generation market[J];Power System Protection and Control;2008-17
6 LONG Yun,ZHOU Huafeng,YANG Lin(CSG Dispatch & Control Centre,Guangzhou 510623,China);Power Plants Operation into Grid and the Related Ancillary Service Compensation Management System in China Southern Power Grid[J];Southern Power System Technology;2011-03
7 LI Mengyan 1,ZHU Tao2,WANG Dada1,YU Yinhua3(1.Yunnan Electric Power Research Institute,Kunming 650217,China;2.Yunnan Electric Power Dispatching and Controlling Center,Kunming 650011,China;3.Tianda Power New Technology Limited Company,Tianjin 3000384,China);On AGC Ancillary Service of Yunnan Power Grid under Electricity Market[J];Southern Power System Technology;2011-06
8 Jing Tianjun,Tan Yuangang,Yang Minghao(College of Information and Electrical Engineering,China Agricultural University,Beijing 100083,China);Optimal operation model for microgrid in rural areas[J];Transactions of the Chinese Society of Agricultural Engineering;2012-14
9 LEI Yu, YANG Ming, HAN Xue-shan (School of Electrical Engineering, Shandong University, Jinan 250061, China);A two-stage stochastic optimization of unit commitment considering wind power based on scenario analysis[J];Power System Protection and Control;2012-23
10 TIAN Xiao-long(China Energy Engineering Group Co.,Beijing 100029,China);Multi-objective Collaborative Optimization Dispatching System Against Various Characteristic Power Sources[J];Northeast Electric Power Technology;2013-05
China Proceedings of conference Full-text Database 2 Hits
1 ;云南电网枯水期 AGC 辅助服务补偿容量计算方法的研究[A];[C];2010
2 GAO Zhi-hua~(1,2) REN Zhen~1 HUANG Fu-quan~3 ZHU Ran~1 1.School of Electric Power Engineering,South China University of Technology,Guangzhou 510640,Guangdong Province,China; 2.Cuangdong Power Dispatching Centre,Guangzhou 510600,Guangdong Province,China; 3.Guangdong Guangdian Power Grid Co.,Ltd.,Shenzhen Power Supply Branch,Shenzhen 518001,Guangdong Province,China;RESEARCH ON COMPETITIVE BIDDING AND SETTLEMENT MODE OF PROVINCIAL ELECTRICITY MARKET[A];[C];2005
【Secondary Citations】
Chinese Journal Full-text Database 2 Hits
1 LI Zhi,CAI Jiu-ju,CAO Fu-yi,et al;On-line calculation method of coal boiler efficiency at power station[J];Energy Conservation;2005-03
2 MO Wei-ren1, ZHANG Bo-ming1, SUN Hong-bin1, HU Zi-heng2, LIU Shun-gui2 (1. Dept. of Electrical Engineering, Tsinghua University, Beijing 100084, China 2. Shenzhen Branch, Guangdong Electric Power Group, Shenzhen 518001, China);EXTENDED SHORT-TERM LOAD FORECASTING PRINCIPLE AND METHOD[J];Proceedings of the Csee;2003-03
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved