Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《JOURNAL OF SOUTHEAST UNIVWRSITY(NATURAL SCIENCE EDITION)》 1999-02
Add to Favorite Get Latest Update

Time Based Evaluation Method of Assembly Sequence

Yin Chenbo Zhong Binglin Yi Hong (Department of Mechanical Engineering,Southeast University, Nanjing 210096)  
The purpose of this research is to objectively evaluate the differences among the feasible assembly sequences. For this purpose an assembly hierarchy relational model is proposed. The calculation of the operating time based on the predetermined time standards is discussed. A evaluation method of assembly sequences with considering production schedule is proposed. An example of assembly sequences evaluation for cylindrical spur gearbox is given.
【Fund】: 国家“863”CIMS主题资助
【CateGory Index】: TP278
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【References】
Chinese Journal Full-text Database 4 Hits
1 LIU Yuan-wei,CUI Guang-yu(School of Mechanical Engineering,Dalian Jiaotong University,Dalian 116208,China);Optimization of Assembling Sequence Based on Genetic Algorithm[J];Journal of Dalian Jiaotong University;2009-04
2 GAO Jin-lian,YANG Jie,LI Chun-shu(School of Mechanical Engineering,Hebei Polytechnic University,Tianjin 300130,China);Optimization of assembling operation based on genetic algorithm[J];Journal of Machine Design;2007-01
3 CUI Gen-qun, DAI Li-min, LI Chun-shu, WANG Li-min(Hebei University of Technology, Tianjin 300130);Research of Fuzzy Evaluation and Decision of Assembly Sequences Based on Set-Pair Analysis[J];Mechanical Science and Technology;2004-08
4 Gu Jinan(Jiangsu University)Zhang Linxuan Xiao Tianyuan(Tsinghua University)Zhang Guosheng (Beijing E-TECH Technology Stock Co.);RESEARCH OF ASSEMBLY SEQUENCEPLANNING OF TOPOLOGICAL SORTOF DIRECTED GRAPH ON REASONINGAND THE OPTIMIZATION[J];Chinese Journal of Mechanical Engineering;2002-12
【Citations】
Chinese Journal Full-text Database 1 Hits
1 Yin Chenbo et al(18);Computer Aided Assembly Sequence Planning[J];MANOFACTURING AUTOMATION;1998-06
【Co-citations】
Chinese Journal Full-text Database 7 Hits
1 YANG Zhi-fei, GU Tian-long, ZHONG Yan-ru (Dept. of Computer, Guilin 541004, China);Automatic Reasoning of Assembly Sequence Based on OBDD[J];Journal of Guilin University of Electronic Technology;2005-01
2 LIU Tong , CUI Gen-qun(Prospecting designing institute, Petrochemical Complex, Hebei Xushui 072551, China; Mechanical College, Hebei University of technology, Tianjin 300130, China);An Analysis Method of Assembly Sequence for Many Varieties of Products in a Small Scale of Batch Process[J];Journal of Hebei University of Technology;2002-05
3 晨波 易 红 钟秉林 李小林(东南大学);装配CAD/CAPP集成方法与系统实现[J];MANOFACTURING AUTOMATION;1999-03
4 YIN Chen Bo\+1 , YI Hong\+2 , ZHONG Bing Lin\+2 (1. Department of Mechanical and Electrical Engineering, Nanjing University of Technology, Nanjing 210009, China; 2. Department of Mechanical Engineering, Southeast University, Nanjing 210096, China;Method of assembly planning for virtual manufacturing[J];Journal of Nanjing University;2002-02
5 CHEN Dai-iong; LIU Kun; WANG Jie; SU Dong-hai; LI Zeng-hua;WANG Ying-chun; YU Tian-biao(college of Mechanical Engineering, Shenyang Polytechnic University, Shenyang 110023, China);Automation assembly of 1250-ton bale press hydraulic pump station[J];JOURNAL OF SHENYANG POLYTECHNIC UNIVERSITY;1999-04
6 ZHAO Ben1, CHENG Ye2, WANG Kun1, ZHANG Bo-peng1 (1Department of Precision Instrument and Mechanics, Beijing 100084, China; 2Department of Industrial Engineering, Beijing 100084, China);The Design of Simulation System for Assembly Process Planning of Sedan Production Line[J];Acta Simulata Systematica Sinica;2003-02
7 LIU Yu-hai, MI Jian, ZHANG Xi-en (Ordnance Engineering Colleague, Shijiazhuang 050003, China);An Assembly Modeling in Virtual Environment[J];Acta Simulata Systematica Sinica;2001-S2
【Co-references】
Chinese Journal Full-text Database 10 Hits
1 DONG Wen-hui, GONG Ya-dong, WANG Wan-shan(School of Mechanical Enginnering and Automation, Northeastern University, Shenyang 110004, China. );Partner Selection and Optimization Model in Global Manufacturing[J];Journal of Northeastern University(Natural Science);2005-05
2 JINYing\|wei,CHIZhong\|xian,LIYan\|hong,XI\ Hong\|bo( Dept. of Comput., Dalian Univ. of Technol., Dalian 116024, China );Comprehensive evaluation method and its application of tendency sequencing based on SPA linking numbers[J];Journal of Dalian University of Technology;2002-06
3 Zhao Yong, Zha Jianzhong(Intelligent Engineering Lab, College of Mechanical and Electrical Engineering, Northern Jiaotong University, Beijing 100044);New Development of Agile Manufacturing Research and its Application Prospect[J];High Technology Letters;2002-10
4 LI Wen-hui(College of Electrical and Information Engineering,Lanzhou Univ.of Tech.,Lanzhou 730050,China);The application and development of manufacturing execution system(MES)[J];Journal of Lanzhou University of Technology;2006-02
5 WU Wei SUI Ai na (Beijing University of Aeronautics and Astronautics, Dept. of Computer Science and Engineering);Virtual Assembly Model with Mixed Control of Position/Force[J];Journal of Beijing University of Aeronautics and Astronautics;2001-04
6 LIU Ming-zhou, CAO Fei, REN Lan (School of Mechanical and Automobile Engineering, Hefei University of Technology, Hefei 230009, China);Study of Organization Model of Product-Oriented Process Data BOM[J];Journal of Engineering Graphics;2004-02
7 LIN Xian-kun,LI Ai-ping,CHEN Bin-sen (Institute of Advanced Manufacturing Technology,Tongji University,Shanghai 200092,China);Scheduling Optimization of Mixed Model Assembly Lines with Hybrid Particle Swarm Optimization Algorithm[J];Industrial Engineering and Management;2006-01
8 Zeng Zhibin Li Yan Li Shujuan Zhang Hongbing (School of Machinery and Precision Instrument Engineering,Xi'an University of Technology,Xi'an 710048);Multiple Fuzzy Synthetic Judgement Method to the Partner-Selection in Dynamic Alliance[J];Computer Engineering and Applications;2005-17
9 Zhang Bo(Dept. of Computer Science and Technology, Tsinghua University, Beijing 100084)Zhang Ling(Dept. of Mathematics, Anqing Teachers' College, Anhui 246011);A NEW ALGORITHM FOR PLANNING MECHANICAL ASSEMBLY SEQUENCES[J];Chinese Journal of Computers;1991-08
10 WANG Yan- wei, FAN Qi- jin, PENG Yan- wu (Northwestern Polytechnical University ,Xi'an 710072, China);A layer upon layer, step by step assembly sequence planning method[J];Manofacturing Automation;2001-03
【Secondary References】
Chinese Journal Full-text Database 10 Hits
1 LIU Yuan-wei,CUI Guang-yu(School of Mechanical Engineering,Dalian Jiaotong University,Dalian 116208,China);Optimization of Assembling Sequence Based on Genetic Algorithm[J];Journal of Dalian Jiaotong University;2009-04
2 GONG Jing-zhong,LI Guo-xi,ZANG Yu-fei,YANG Shang-fei (National Defense Scientific and Technical University,Institute of Electrical and Mechanical Engineering and Automation,Changsha 410073,China);Based on a map to identify sub-assembly of the assembly sequence planning[J];Machinery Design & Manufacture;2008-09
3 GAO Jin-lian,YANG Jie,LI Chun-shu(School of Mechanical Engineering,Hebei Polytechnic University,Tianjin 300130,China);Optimization of assembling operation based on genetic algorithm[J];Journal of Machine Design;2007-01
4 CUI Gen-qun, DAI Li-min, LI Chun-shu, WANG Li-min(Hebei University of Technology, Tianjin 300130);Research of Fuzzy Evaluation and Decision of Assembly Sequences Based on Set-Pair Analysis[J];Mechanical Science and Technology;2004-08
5 MENG Fanli TAN Dalong HUANG Xuemei WANG Yuechao;Optimization of reconfigurable assembly system based on CPM-PERT[J];Modular Machine Tool & Automatic Manufacturing Technique;2004-11
6 Dai Guohong~(1,2) Zhang Youliang~1 You Fei~2 1.Nanjing University of Science & Technology,Nanjing,210094 2.Jiangsu Teachers University of Technology,Changzhou,Jiangsu,213001;Study on the Generation of Optimal Assembly Sequence Based on a Tree Model[J];China Mechanical Engineering;2006-S2
7 ZOU Xiao-ming,XU Jian-xin,GENG Jun-hao(Institute of CAPP & Manufacturing Engineering Software,Northwestern Polytechnical University,Xi'an 710072,China);Research on Assembly Process Planning Techniques Based on 3D Models[J];Modular Machine Tool & Automatic Manufacturing Technique;2008-07
8 XU Zhenhua, XUE Huifeng, WU Xiaojun(1 Northwestern Polytechnical University, Xi'an, 710072, 2 Northwestern Polytechnical University, Xi'an, 710072);A New Arithmetic of Topological Sequencing on AOV Network[J];Microcomputer Applications;2007-04
9 ZHAO Ke-qin(Zhuji Institute of Connection Mathematics,Zhuji 311811,China);The application of SPA-based identical-discrepancy-contrary system theory in artificial intelligence research[J];Caai Transactions on Intelligent Systems;2007-05
10 Zhou Kaijun1,2 Li Dongbo1 Yu Minjian11.Nanjing University of Science and Technology,Nanjing,2100942.Nantong Vocational College,Nantong,Jiangsu,226007;A Modified Approach to Assembly Sequence Planning[J];China Mechanical Engineering;2007-14
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved