Short-term Economic Dispatch Sssociated with Interruptible Load and Wind Farm Variation

Chen Ming1 Tong Xiaojiao1,2 Meng Wanxing1(1.School of Electrical and Information Engineering,Changsha University of Science and Technology,Changsha 410114;2.Hengyang Normal University,Hengyang,Hunan 421002)  
Interruptible load was introduced as a kind of spinning reserve to balance system's power under the error situation of short-term load wind power forecasting.The CVAR was used to depict the grid's security risks and consider the limitation of transmission lines transmit active power and be as a network security indicator.Then set up short-term economic dispatch including the randomness of interruptible load and wind farm.The total dispatch cost includes compensation cost due to the power supplying no sufficient in addition to generating cost.Through the IEEE14 system calculation,the result shows that the model is great of theoretical significance and practical value.
【Fund】: 国家自然科学基金资助项目(10926189 10871031);; 湖南省教育厅重点项目资助项目(10A015);; 湖南省自然科学衡阳联合基金资助项目(10JJ8008)
【CateGory Index】: TM73;TM715
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Citations】
Chinese Journal Full-text Database 10 Hits
1 JIANG Yue-wen,CHEN Chong,WEN Bu-ying(College of Electrical Engineering and Automation of Fuzhou University,Fuzhou 350002,China);Economic dispatch based on particle swarm optimization of stochastic simulation in wind power integrated system[J];Advanced Technology of Electrical Engineering and Energy;2007-03
2 GE Ju, ZHANG Li-zi (North China Electric Power University, Beijing 102206, China);Pareto Optimality Model of Reserve Market Including Interruptible Load as Participants[J];Automation of Electric Power Systems;2006-09
3 ZHU Lingzhi,CHEN Ning,WANG Wei(State Grid Electric Power Research Institute,Nanjing 210003,China);Wind Farm Reactive Power Control Strategy Considering Local Networks Demand[J];Automation of Electric Power Systems;2009-05
4 ZHANG Qiang, HAN Xue-shan, XU Jian-zheng (School of Electrical Engineering,Shandong University, Jinan 250061, China);Analysis of Security Economic Dispatch and Homogeneous Dispatch[J];Proceedings of Electric Power System and Automation;2005-02
5 LEI Ya-zhou, WANG Wei-sheng, YIN Yong-hua, DAI Hui-zhu (China Electric Power Research Institute, Beijing 100085, China);ANALYSYS OF WIND POWER VALUE TO POWER SYSTEM OPERATION[J];Power System Technology;2002-05
6 WANG Le1,C.W.YU2,WEN Fu-shuan3(1.College of Electrical Engineering,Zhejiang University,Hangzhou 310027,Zhejiang Province,China;2.Department of Electrical Engineering,Hong Kong Polytechnic University,Hong Kong SAR,China;3.College of Electrical Engineering,South China University of Technology,Guangzhou 510640,Guangdong Province,China);A Chance-constrained Programming Approach to Determine Requirement of Optimal Spinning Reserve Capacity[J];Power System Technology;2006-20
7 JIANG Wen,YAN Zheng(School of Electronic Information and Electrical Engineering,Shanghai Jiao Tong University,Shanghai 200240,China);Dynamic economic dispatch considering wind power penetration based on IPSO[J];Power System Protection and Control;2010-21
8 TAN Lun-nong, ZHANG Bao-hui (Xi'an Jiaotong University, Xi'an 710049, China);RESERVE CAPACITY FOR ACCIDENT IN POWER MARKET ENVIRONMENT[J];Proceedings of the Csee;2002-11
9 WANG Jian-xue, WANG Xi-fan, WANG Xiu-li (School of Electrical Engineering, Xi’an Jiaotong University, Xi’an, 710049, Shaanxi Province, China);STUDY ON MODEL OF INTERRUPTIBLE LOAD CONTRACT IN POWER MARKET[J];Proceedings of the Csee;2005-09
10 DU Liang, LIU Jun-yong, TIAN Li-feng, YANG Ke (School of Electrical Engineering and Information, Sichuan University, Chengdu 610065, Sichuan Province, China);Seconds Level Interruptible Loads and Application in Power Market Environment[J];Proceedings of the CSEE;2008-16
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 LIU Guo-gang,LIU Ying,WEN Fu-shuan,ZHANG Yao(College of Electric Power,South China University of Technology,Guangzhou 510640,China);Optimal design of frequency regulation service contract using mechanism design theory Part 2 Properties of the contract[J];Journal of Electric Power Science and Technology;2007-04
2 LI Yu-zeng,LIU Chang,ZHANG Shao-hua,WANG Xian(Department of Automation,Shanghai University,Shanghai 200072,China);Multi-period dispatch of interruptible loads by intelligent optimization algorithms[J];Journal of Electric Power Science and Technology;2009-04
3 ZHANG Shao-hua,AN Xue-na,WANG Xian,LI Yu-zeng(Department of Automation,Shanghai University,Shanghai 200072,China);Power suppliers' decision-making model for interruptible load with early notification option[J];Journal of Electric Power Science and Technology;2009-04
4 HUANG Da-wei1,ZHANG Qiang2,LEI Ming1(1.Electrical Engineering College,Northeast DianLi University,Jilin Jilin 132012;2.Huaneng Power International Incorporated Dalian Power Plant,Dalian Liaoning 116000);Multi-periods Spinning Reserve Optimization Model Based on Bi-level Programming[J];Journal of Northeast Dianli University;2012-02
5 ZHONG Jia-qing, LU Zhi-gang(Key Laboratory of Power Electronics for Energy Conservation and Motor Drive of Hebei Province, Yanshan University,Qinhuangdao, Hebei 066004, China);Research on environmental economic dispatch of power system including wind farm[J];Journal of Yanshan University;2011-03
6 QI Yong,JIANG Ya-qun,HUANG Chun(College of Electrical and Information Engineering,Hunan University,Changsha 410082,China);The Research on the Wind Farm Flicker Measurement Based on the Virtual Instrument[J];Electrical Measurement & Instrumentation;2010-09
7 JIANG Yue-wen,CHEN Chong,WEN Bu-ying(College of Electrical Engineering and Automation of Fuzhou University,Fuzhou 350002,China);Economic dispatch based on particle swarm optimization of stochastic simulation in wind power integrated system[J];Advanced Technology of Electrical Engineering and Energy;2007-03
8 CHEN De-sheng,LI Pei-qiang,LI Xin-ran,DE Wei,XIAO Yuan-yuan,LIU Qian-yong(College of Electrical and Information Engineering,Hunan University,Changsha 410082,China);Integrated models of short-term wind speed forecasting based on wavelet transform[J];Advanced Technology of Electrical Engineering and Energy;2012-03
9 Pan Wenxia1 Fan Yongwei2 Zhu Li3 Gao Along1 (1. Hohai University Nanjing 210098 China 2. Shanghai Investigation & Design Research Institute Shanghai 200434 China 3. Henan Electric Power Survey & Design Institute Zhengzhou 450007 China);The Optimal Sizing for Pumped Storage System in Wind Farm[J];Transactions of China Electrotechnical Society;2008-03
10 Jiang Yuewen Chen Chong Wen Buying (Fuzhou University Fuzhou 350002 China);Particle Swarm Research of Stochastic Simulation for Unit Commitmen in Wind Farms Integrated Power System[J];Transactions of China Electrotechnical Society;2009-06
China Proceedings of conference Full-text Database 2 Hits
1 Ning Chen~1,Yun Zhang~(2*) 1.School of Mechanical and Automotive Engineering,Zhejiang University of Science and Technology,Hangzhou,310023,China 2.School of Information Science and Technology,Zhejiang Forestry University,Hangzhou,311300;Calculation Method of Active Power Output of Wind Farms Connected to Grids Based on FRC[A];[C];2010
2 LI Xi-lan BIN Xue TU Fang-fang Fujian Electric power Design Institute,Fuzhou,350000,China WANG Da-guang LI Hu-jun Fujian Electric Technology center,Fuzhou,350000,China;Study on recent wind farm integration in Fujian[A];[C];2008
【Secondary Citations】
Chinese Journal Full-text Database 10 Hits
1 CAI Jin-ding,FU Zhong-yun(Electrical Engineering and Automation College of Fuzhou University,Fuzhou 350002,China);Application of particle-group and neural network hybrid algorithm in fault diagnosis of three-phase rectification circuit[J];Advanced Technology of Electrical Engineering and Energy;2006-04
2 GUO Yuan-fan,YANG Feng,DONG Zhao-xia(College of Hydropower and Information Engineering in Huazhong University of Science and Technology,Wuhan 430074,China);Available transfer capability calculation using particle swarm optimization algorithm[J];Advanced Technology of Electrical Engineering and Energy;2006-04
3 Zhang Guoquan,Wang Xiuli,Wang Xifan Xi'an Jiaotong U niversity,Xi'an71 0 0 4 9,China;STUDY ON BENEFITSAND COSTSOF SPINNING RESERVE CAPACITY IN POWER MARKET[J];AUTOMATION OF ELECTRIC POWER SYSTEMS;2000-21
4 Wang Xiuli,Gan Zhi,L ei Bing,Wang X ifan Xi'an Jiaotong U niversity,Xi'an 710 0 49,China;SENSITIVITY ANALYSISAPPROACH TO TRANSMISSION CONGESTION MANAGEMENT[J];Automation of Electric Power Systems;2002-04
5 Wang Jianxue, Wang Xifan, Zhang Xian, Hu Zechun (Xi'an Jiaotong University, Xi'an 710049, China);BIDDING MODEL OF RESERVE CAPACITY IN ELECTRICITY MARKET[J];Automation of Electric Power Systems;2003-02
6 Zhao Xueshun 1,2 , C. W. Yu 2, C. Y. Chung 2, Wen Fushuan 1, T. S. Chung 2, Huang Minxiang 1 (1. Zhejiang University, Hangzhou 310027, China) (2. Hong Kong Polytechnic University, Hong Kong, China);PROCUREMENT AND PRICING OF OPERATING RESERVES BASED ON THE PEAK-LOAD PRICING THEORY[J];Automation of Electric Power Systems;2003-02
7 Zhao Jianguo , Han Xueshan , Cheng Shijie ( Huazhong University of Science and Technology, Wuhan 430074, China) (Shandong University, Jinan 250061, China);OPTIMAL ACTIVE POWER DISPATCHING COMBINING NETWORK FLOW AND INTERIOR POINT METHODS[J];Automation of Electric Power Systems;2003-23
8 Zhao Xueshun , Wen Fushuan , Wang Zhen , Gan Deqiang , Huang Minxiang ( Zhejiang University, Hangzhou 310027, China) ( The University of Hong Kong, Hong Kong);A PRELIMINARY INVESTIGATION ON DETERMINATION AND PROCUREMENT OF OPERATING RESERVE CAPACITY IN REGIONAL ELECTRICITY MARKETS[J];Automation of Electric Power Systems;2004-13
9 He Yikang, Zheng Kang, Pan Zaiping, Liu Qihui(Zhejiang University, Hangzhou 310027, China);INVESTIGATION On AN AC EXCITED VARIABLE-SPEED CONSTANT-FREQUENCY WIND-POWER GENERATION SYSTEM[J];Automation of Electric Power Systems;2004-13
10 Yang Ning , Wen Fushuan (1. Zhejiang University, Hangzhou 310027, China) (2. The University of Hong Kong, Hong Kong, China);TRANSMISSION SYSTEM EXPANSION PLANNING BASED ON CHANCE CONSTRAINED PROGRAMMING[J];Automation of Electric Power Systems;2004-14
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved