Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Low Temperature Architecture Technology》 2010-08
Add to Favorite Get Latest Update

RISK ANALYSIS OF TUNNEL SHIELD MACHINE DRIVING-IN AND DRIVING-OUT CONSTRUCTION PROCESS IN TUNNELLING ENGINEERING

LIU Ling-yun1,YANG De-lei1,2,GUO Hai-zhu3 (1.Department of Building Engineering,Huanghuai University,Henan Zhumadian 463000,China;2.School of Civil Engineering,Tongji University,Shanghai 200092,China;3.Shenzhen Metro Ltd.,Guangdong Shenzhen 518026,China)  
Based on Zhengzhou Metro M1 line project,the risk analysis method is presented in the paper,which evaluates risk level of working condition using expert investigation method and evaluates weights of the risk factors using analytical hierarchy process.Risk of tunneling machine driving-in and driving-out construction process is analyzed.Risk control measures are put forward based on the results of risk analysis.
【Fund】: 河南省政府决策研究招标课题(B043)
【CateGory Index】: U455.43
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【References】
Chinese Journal Full-text Database 5 Hits
1 Chen Zihai;Chen Jianjun;Yang Jianhui;Zhejiang University of Technology;Zhejiang Provincial Institute of Transportation Engineering Construction Group;Zhejiang University of Science and Technology;;Risk Analysis of Tunnel Shield Machine Driving in Construction Process Based on Fuzzy AHP[J];Chinese Journal of Underground Space and Engineering;2013-06
2 YANG Xiao-wei1,YAN Tian-jun1,NI Zheng-mao2,DONG Jia-xing1(1.Faculty of Engineering,China University of Geosciences,Wuhan 430074,China; 2.Wuhan Subway Corp,Wuhan 430070,China);Analysis and Countermeasures on the Risks in the Construction of Wuhan Subway River-crossing Tunnel[J];Safety and Environmental Engineering;2012-03
3 LIANG Xiao-ling(ZhongJingFa(Beijing) Engineering Cost Consultant Co.,Ltd.,Wuhan 430060,China);The Construction Risk Analysis on the Metro Secondary Cross-river Tunnel in Wuhan[J];Value Engineering;2013-16
4 Ma Zhongzheng;Shanghai Mass Transit Line 10 Development Co.,Ltd. Shentong Metro;;Construction Management for Shield Reception and Departure in Soft Soil Area Based on Risk Analysis[J];Building Construction;2014-05
5 DENG Yan-sheng;LIANG Shi-ju;Shanghai Telsafe Engineering Technology Co.,Ltd;Luoyang Normal University;;Risk assessment of metro station construction based on improved Fuzzy AHP[J];Shanxi Architecture;2014-27
【Citations】
Chinese Journal Full-text Database 6 Hits
1 CHEN Long~1,HUANG Hong-wei~2(1.Shanghai Civic Engineering Construction and Developing Ltd., Shanghai 200025;2.The Department of Geotechnical Engineering of Tongji University,Shanghai 200092);Risk Loss Analysis During Construction of Soft Soil Shield Tunnel[J];Chinese Journal of Underground Space and Engineering;2006-01
2 PAN Xue-zheng CHEN Guo-qiang PENG Ming (1.Hangzhou Municipal Bureau of Highway,Hangzhou 310004; 2.Department of Geotechnical Engineering,Tongji University,Shanghai 200092);Risk Assessment on Shield Excavation in Very Large Tunnel Across Qiantang River[J];Chinese Journal of Underground Space and Engineering;2007-S1
3 LI Gang1,HUANG Hong-wei1(Department of Geotechnical Engineering,College of Civil Engineering,Tongji University,Shanghai 200092,P.R.China);Risk Analysis on Arriving into Shaft of Super Large Diameter Shield Machine under Water[J];Chinese Journal of Underground Space and Engineering;2009-S1
4 CUI Jiujiang(1.Expert Team of Beijing Municipal Government,Beijing 100744;2.Expert Committee of Construction Headquarters of Beijing MRT Project,Beijing 100081);Risks and Countermeasures for Construction of Shield-bored Tunnels[J];Tunnel Construction;2009-04
5 Zhou Hongbo~(1) He Xixing~(1) Jiang Jianjun~(2) Cai Laibing~(1)(1 Shanghai Jianke Project Management Corp.,Shanghai 200032)(2 Sichuan Highway Planning,Survey,Design and Research Institute,Chengdu 610041);Risk identification and handling in the shield tunneling of metro in soft soil[J];Modern Tunnelling Technology;2006-02
6 Zhao Jun, Dai Haijiao (Shanghai Tunnel Engineering Construction Co., Ltd., Shanghai 200032 China);SHIELD BREAK-IN AND BREAK-OUT TECHNIQUES IN SOFT SOIL FOR SHIELD DRIVEN TUNNEL[J];Chinese Journal of Rock Mechanics and Engineering;2004-S2
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 CUI Yina,WANG Suyan,LI Hongnan(Department of Civil & Hydraulic Engineering,DUT,Dalian 116023,China);Forecast of economical technology targets in construction industry based on BP Neural Network[J];Sichuan Building Science;2008-02
2 GONG Yuan-sheng et al (Yunnan Agricultural University,Kunming,Yunnan 650201);Study on Application of Standard Deviation Weight Method in the Evaluation on the Commodity Traits of the Tomato Fruits[J];Journal of Anhui Agricultural Sciences;2008-31
3 HE Feng-biao (Department of Economy and Management,Huaiyin Normal College,Huaian,Jiangsu 223300);Discussion on Water Resources Configuration Model Based on AHP and TOPSIS[J];Journal of Anhui Agricultural Sciences;2009-17
4 LI Ming-liang et al (Management School of Guilin University of Technology,Guilin,Guangxi 541004);Shenhua Coal Marketing Prediction Based on the Dynamic Reaction Model and Computer Simulation[J];Journal of Anhui Agricultural Sciences;2009-30
5 LIU Jing (School of Economic & Commerce,South China University of Technology,Guangzhou,Guangdong 510006);Evaluate on Innovation Capability of PRD Urban Agriculture Enterprise based on F-AHP Method[J];Journal of Anhui Agricultural Sciences;2009-32
6 MEN Ke-pei et al(College of Mathematics and Physics,Nanjing University of Information Science and Technology,Nanjing,Jiangsu 210044);Measure Analysis on Agricultural Modernization Level in Anhui Province[J];Journal of Anhui Agricultural Sciences;2010-05
7 MEN Ke-pei et al (School of Mathematics and Physics,Nanjing University of Information Science & Technology,Nanjing,Jiangsu 210044);Comprehensive Evaluation on the Level of Agricultural Modernization in Eastern China[J];Journal of Anhui Agricultural Sciences;2010-11
8 LIANG Qi-xue et al (Chongqing Land Surveying and Planning Institute,Chongqing 400020 );Evaluation on the Land Intensive Use of Development Area Based on TOPSIS Method[J];Journal of Anhui Agricultural Sciences;2010-14
9 YU Shui et al(College of Public Management,Nanjing Agricultural University,Nanjing,Jiangsu 210095);AHP-based Village-level Agricultural Technician with the Performance Evaluation Index System[J];Journal of Anhui Agricultural Sciences;2010-35
10 ZHU Xiao-dong et al(School of Management,Xi'an University of Architecture and Technology,Xi'an,Shaanxi 710055);Evaluating System for Farmers Satisfaction Degree in the Green Energy Saving Rebuilding of Rural House[J];Journal of Anhui Agricultural Sciences;2011-04
China Proceedings of conference Full-text Database 10 Hits
1 LV Wei-ji~1,SUN Yao~2,MENG Yi~1 (1.Business School of Zhanjiang Normal University Zhanjiang Guangdong 524048 China; 2.China Life Insurance Company Limited Dalian Branch Dalian Liaoning 116001,China);Evaluation on sustainable development abilities of different branches in Zhanjiang's industry[A];[C];2011
2 Tang Kai Zhang Xu Zhou Xiang Zhang Enze Dong Lijuan Zhang Rui (Institute of HVAC&GAS Engineering,Tongji University,Shanghai 201804,China);INFLUENCE OF DIFFERENT KINDS GEOLOGICAL AND CLIMATE CONDITIONS ON GROUND HEAT EXCHANGER AND ITS SUITABILITY EVALUATION[A];Chinese association of Refrigeration[C];2011
3 WU Yue1, LU Wenhai2 (1.National Center Of Ocean Standard And Metrology, Tianjin 300112,China; 2.National Marine Data and Information Service , Tianjin 300171,China);Research on the Ocean Standards Assessment Method——With SW203 Scale Inhibitor and Dispersant of Seawater Enterprise Standard as an Example[A];[C];2010
4 HAN Shasha (School of Economics and Management,Civil Aviation University of China,Tianjin 300300,China);Comprehensive Evaluation of China's Regional General Aviation Development[A];[C];2011
5 CHEN Xi-bo YIN Zai-zhe (Institute of Nuclear and New Energy,Tsinghua University,Beijing 100084);Research on the radioactive sources safety and security assessment based on the Analytic Hierarchy Process(AHP)[A];[C];2008
6 Li Xingkuo Li Shuguang Zhou Jianmei Institute of Chemical Defense,Beijing,102205;Gray Synthetical Evaluation on the Ability of Chemical Defense Equipments in anti-NBC from Terrorist in Important City[A];[C];2008
7 Jingshun QIAO~1 DeleiYANG~1 Huawei LIU~1 Haizhu GUO~2 Lingyun LIU~1 Zhigang JIA~1 1 Department of Building Engineering,Huanghuai University,Zhumadian 463000,China 2 Shenzhen Metro Ltd.,Shenzhen 518026,China;Risk Analysis of Tunnel Shield Machine Driving-in and Driving-out Construction Process in Zhengzhou Subway Engineering[A];[C];2010
8 YANG Xiumei LIANG Shouyun (College of Civil Engineering and Mechanics,Lanzhou University,Lanzhou 730000);APPLICATION OF FUZZY TECHNIQUE ON DANGER LEVEL ASSESSMENT OF GEOLOGICAL HAZARD[A];[C];2007
9 W.W.Yang,Fred Ng,Joseph Lo,C.K.TsangAECOM Asia Co Ltd;Risk Management for Subaqueous Shield Tunnels[A];[C];2009
10 Ma Hong bo Chen Guang da (School of Electronic Mechanical Engineering, Xidian University, Xi’an 710071);The Method for Computing Coupling Degree of Testing Factors in Electromechanical Coupling Research[A];[C];2009
【Co-references】
Chinese Journal Full-text Database 10 Hits
1 WU You-gen(China Railway 17 Construction Bureau,Taiyuan 030000);Technology of SMW in Soft for Shiedl Machine Starting to Tunnel From Working Well[J];;2005-S1
2 BAI Yun~1,TANG Jing~2(1.Shanghai Urban Construction Group,Shanghai 200023,P.R.China;2.Department of Underground Engineering,Tongji University,Shanghai 200092,P.R.China);Risk Management for Underground Project in Soft Soils[J];Chinese Journal of Underground Space and Engineering;2006-01
3 CHEN Long~1,HUANG Hong-wei~2(1.Shanghai Civic Engineering Construction and Developing Ltd., Shanghai 200025;2.The Department of Geotechnical Engineering of Tongji University,Shanghai 200092);Risk Loss Analysis During Construction of Soft Soil Shield Tunnel[J];Chinese Journal of Underground Space and Engineering;2006-01
4 ZHOU Hong-bo~1,HE Xi-xing~1,JIANG Jian-jun~2,CAI Lai-bing~1 (1.Shanghai Jianke Project Management Co.Ltd.,Shanghai 200032,China;2.Sichuan Province C.D.Highway Planning,Survey,Design and Research Institute,Chengdu 610041,China);Risk Identification and Handling in Construction of Metro Shield Tunnel Project[J];Chinese Journal of Underground Space and Engineering;2006-03
5 XIN Zhen-xing,WANG Jin-an,MA Hai-tao,PENG Jia-qiang(Civil & Environment Engineering School,Beijing University of Science and Technology,Beijing 100083,China);Study on Rational Scope of Pre-Reiforcement at Starting Position for Shield Excavation[J];Chinese Journal of Underground Space and Engineering;2007-03
6 WU Tao~1 WEI Liang-wen~2 ZHANG Qing-he~2 (1.Shanghai Construction Engineering Administration CO.,LTD,Shanghai 200031,China;2.The Department of Geotechnical Engineering of Tongji University,Shanghai 200092,China);Research on Stability of Reinforced Soil at Large Scale Shield Departure Area[J];Chinese Journal of Underground Space and Engineering;2008-03
7 KAO,C.C.1,LIN,Y.C.1,CHEN,C.H.2(1.Department of Rapid Transit Systems,TCG,Taipei;2.Kajima/RSEA/HwangChang Joint Venture,Taipei);The Risk Management and Case Study of Freezing Method[J];Chinese Journal of Underground Space and Engineering;2008-04
8 ZHOU Hong-bo1,2,NI Zhi-fang3,GAO Wen-jie1(1.Shanghai Jianke Project Management Co.Ltd.Shanghai.200032.China;2.Tongji University.Shanghai.200092.China.3.Shanghai Yangpu Metro Line Development Co.Ltd Shanghai 200010,China);Study on Risk Assessment and Control Measures for the Construction Safety of Metro Line Project[J];Chinese Journal of Underground Space and Engineering;2008-05
9 LI Gang1,HUANG Hong-wei1(Department of Geotechnical Engineering,College of Civil Engineering,Tongji University,Shanghai 200092,P.R.China);Risk Analysis on Arriving into Shaft of Super Large Diameter Shield Machine under Water[J];Chinese Journal of Underground Space and Engineering;2009-S1
10 Yuan Yunhui 1,Yang Ping1 (College of Civil Engineering,Nanjing Forestry University,Nanjing 210037,China);Numerical Analysis of Soil Thermal Field in Freezing Reinforcement of Shield Arriving[J];Chinese Journal of Underground Space and Engineering;2010-05
【Secondary References】
Chinese Journal Full-text Database 10 Hits
1 DENG Yan-sheng;LIANG Shi-ju;Shanghai Telsafe Engineering Technology Co.,Ltd;Luoyang Normal University;;Risk assessment of metro station construction based on improved Fuzzy AHP[J];Shanxi Architecture;2014-27
2 BEN Zhijiang;YANG Ping;CHEN Changjiang;WANG Shengfu;College of Civil Engineering, Nanjing Forestry University;Survey and Design China Railway Tunnel Institute Co., Ltd.;;Water receiving technology of large slurry shield in river-crossing subway tunnel[J];Journal of Nanjing Forestry University(Natural Sciences Edition);2015-01
3 JU Yicheng;YUAN Libin;YANG Zhao;YANG Qing;Engineering Equipment Branch,CCCC Second Harbor Engineering Co.,Ltd.;National Enterprise Technology Center,CCCC Second Harbor Engineering Co.,Ltd.;;Research on Key Technologies for Launching of Super-large Slurry Shield:Case Study on Weisanlu River-crossing Tunnel[J];Tunnel Construction;2015-01
4 HU Jun;ZHANG Wanxiang;LI Yanrong;School of Civil and Architecture Engineering,Hainan University;China Railway Shidai Architectural Design Institute Co. ,Ltd.;;Numerical Analysis on Cup Length of Cup-shaped Freezing Wall[J];Subgrade Engineering;2015-03
5 HU Jun;ZHANG Wanxiang;ZENG Hui;School of Civil Engineering and Architecture,Hainan University;China Railway Shidai Architectural Design Institute Co.,Ltd.;College of Civil Engineering and Architecture,Wuyi University;;Numerical Analysis of Temperature Field at Cup-shaped Frozen Wall Reinforcement at the End of Shield Tunnel[J];Subgrade Engineering;2015-04
6 LIU Liyong;HAN Lingrui;HUANG Su;WANG Xin;GUAN Zhenchang;The 2nd Engineering Co.Ltd.of China Railway No.3 Engineering Group;Fuzhou Urban Metro Co.Ltd.;School of Civil Engineering,Fuzhou University;;Field Monitoring and Analysis of Shield Tunneling Adjacent to Pile Foundation[J];Subgrade Engineering;2015-05
7 SHI Quanbin;YANG Ping;ZHANG Ting;HE Dong;Civil Engineering Institute, Nanjing Forestry University;Architectural Engineering Institute of Taizhou Polytechnical College;;Vertical freezing reinforcement and monitoring in site for tunnel shield-launching end in soft soil stratum[J];Journal of Nanjing Forestry University(Natural Sciences Edition);2015-06
8 Zhou Xiaohua;He Dong;Yang Ping;Nanjing Major Road and Bridge Construction Headquarters;College of Civil Engineering,Nanjing Forestry University;;Reinforcement and Technology of Shield-end in Soft Water-rich Soil[J];Forest Engineering;2014-06
9 Dong Hui;Hu Jun;Liu Yong;College of Power Engineering,Nanjing Institute of Railway Technology;College of Civil Engineering and Architecture,Hainan University;Department of Civil and Environmental Engineering,National University of Singapore;;Experimental Study on Mechanical Properties of Freeze-thaw Cement-treated Soil[J];Forest Engineering;2015-05
10 HU Jun;YANG Ping;College of Civil Engineering, Nanjing Forestry University;College of Civil Engineering and Architecture, Hainan University;;Numerical analysis of temperature field within large-diameter cup-shaped frozen soil wall[J];Rock and Soil Mechanics;2015-02
China Proceedings of conference Full-text Database 1 Hits
1 HU Jun;HAN Hongchao;College of Civil Engineering and Architecture,Hainan University;;Numerical Analysis on Temperature Field under Different Freezing Pipe Spacing in Vertical Freezing Reinforcement of Shield Launching Shaft[A];[C];2014
【Secondary Citations】
Chinese Journal Full-text Database 10 Hits
1 WANG Yan;Hierarchy-Fuzzy Comprehensive Judgment for Safety Evaluation of Metro Running Tunnel[J];Underground Space;2004-03
2 HU Qun-fang , HUANG Hong-wei , CHENG Long (School of Civil Engineering, Tongji University, Shanghai 200092, P.R.China);The Risk Evaluation on Effect of Shield Tunnel Construction on Urban Asphalt Pavement[J];;2005-02
3 CHEN Liang,HUANG Hong-wei,HU Qun-fang(Department of Geotechnical Engineering,Tongji University,Shanghai 200092,China);A Database for Risk Management in Shield Tunneling[J];Chinese Journal of Underground Space and Engineering;2005-06
4 HUANG Hong-Wei~1,ZENG Ming~2,CHEN Liang~1,HU Qun-fang~1(1.Department of Geotechnical Engineering,Tongji University,Shanghai 200092,China;2.General Office of Commanding Post of Shanghai Tunnel & Bridge Construction,Shanghai 200120,China);Risk Management Software (TRM1.0) Based on Risk Database for Shield Tunneling[J];Chinese Journal of Underground Space and Engineering;2006-01
5 CHEN Long~1,HUANG Hong-wei~2(1.Shanghai Civic Engineering Construction and Developing Ltd., Shanghai 200025;2.The Department of Geotechnical Engineering of Tongji University,Shanghai 200092);Risk Loss Analysis During Construction of Soft Soil Shield Tunnel[J];Chinese Journal of Underground Space and Engineering;2006-01
6 PAN Xue-zheng CHEN Guo-qiang PENG Ming (1.Hangzhou Municipal Bureau of Highway,Hangzhou 310004; 2.Department of Geotechnical Engineering,Tongji University,Shanghai 200092);Risk Assessment on Shield Excavation in Very Large Tunnel Across Qiantang River[J];Chinese Journal of Underground Space and Engineering;2007-S1
7 PENG Ming HUANG Hong-wei HU Qun-fang HUANG Xu (Department of Geotechnical Engineering,Tongji University,Shanghai 200092,China);A Risk Database Designed for Dynamic Risk Management in Shield Tunneling from Site Monitoring Data[J];Chinese Journal of Underground Space and Engineering;2007-S1
8 CHEN Yun,WU Zhu-qing,LIU Jun-jian(School of Traffic and Transportation Engineering,Changsha University of Science & Technology,Changsha 410076,China);Risk evaluation of highway engineering project based on the Fuzzy-AHP[J];Journal of Changsha Communications University;2008-03
9 WEI Liang-wen~(1,2),WU Tao~(1,2),ZHANG Qing-he~(1,2)(1.Department of Geotechnical Engineering,Tongji University,Shanghai 200092,China;2.Geotechnical Key Laboratory,Tongji University,Shanghai 200092,China);STABILITY ANALYSIS OF SOIL BODY OF SHIELD STARTING SHAFT IN LARGE-DIAMETER SHIELD TUNNELING[J];Low Temperature Architecture Technology;2006-02
10 Tang Xuan Wu Huiming Hu Ming;Design and Development of Risk Management System of Shield Tunnelling[J];Underground Engineering and Tunnels;2006-04
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved