Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Urban Rapin Rail Transit》 2004-05
Add to Favorite Get Latest Update

Application of Shield Tunneling Method in Beijing Metro Line 5

Wang Liang (Beijing Urban Engineering Construction Group Corporation Ltd., Beijing 100081)  
The shield tunneling method in the trial section of Beijing metro line 5 is introduced. The main design parameters of the shield tunneling machine and the tunnel lining segment are described. Some key technologies in shield tunneling method construction, including the launching of shield machine, the strengthening of end soil, concrete grouting behind the lining, opening the cabin by adding pressure, checking and changing of cutter and the control of settlement, are discussed.
【CateGory Index】: U455;U231.3
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【References】
Chinese Journal Full-text Database 8 Hits
1 XIN Zhen-xing,WANG Jin-an,MA Hai-tao,PENG Jia-qiang(Civil & Environment Engineering School,Beijing University of Science and Technology,Beijing 100083,China);Study on Rational Scope of Pre-Reiforcement at Starting Position for Shield Excavation[J];Chinese Journal of Underground Space and Engineering;2007-03
2 Zhou Wenbo Wu Huiming Zhao Xiaoxia(Shanghai Tunnel Engineering Co., Ltd., Shanghai 200082 );The Application of Homemade Metro Shield Machine in the Tunnel Construction of Urban Rail Transit[J];Urban Rapid Rail Transit;2006-02
3 Qu Tianxiang(China Railway Tunnel Joint Stock Co., Ltd., Xinxiang, Henan 453000);Shield Type Selection for the Water Diversion Tunnel Project across the Yellow River[J];Urban Rapid Rail Transit;2007-01
4 Jin Shihe(14th Engineering Bureau Group Co.,Ltd.,C.R.C.C.,Jinan 250014);Strategies for EPB Shield Tunneling through Hard Rocks on Guangzhou Metro[J];Urban Rapid Rail Transit;2007-03
5 Jin Shihe(14th Engineering Bureau Group Co.,Ltd.,C.R.C.C.,Jinan 250014);Application of the Boring System of NFM Shield in Guangzhou Subway[J];Urban Rapid Rail Transit;2007-06
6 Wang Cemin1 Ju Shijian2(1.Beijing Urban Engineering Design and Research Institute,Co.,Ltd.,Beijing 100037;2.Guangzhou Metro Design and Research Institute,Guangzhou,510010);Orientation and Deviation Control System for Shield and Lining Ring[J];Urban Rapid Rail Transit;2008-02
7 DONG Qichang,HUANG Xingchun,YU Changrong(Shanghai Jiaotong University,School of Naval architecture,Ocean and Civil Engineering,Shanghai 200240,China);The model experiment and research of synchronized pouring when in the shield tunneling construction in gravel stratum[J];Sichuan Building Science;2009-05
8 Chen Rendong (Beijing Municipal Engineering Design & Research Institute,Beijing 100045);Optimum design for the reinforcement of the lining segments in Beijing metro line 4[J];Modern Tunnelling Technology;2006-05
【Co-references】
Chinese Journal Full-text Database 10 Hits
1 DING Chun-lin et al;Dark-excavation Construction Techniques of the Double-line Tunnel and Its Numerical Simulation Analysis[J];Underground Space;2002-04
2 CHEN Long~1,HUANG Hong-wei~2(1.Shanghai Civic Engineering Construction and Developing Ltd., Shanghai 200025;2.The Department of Geotechnical Engineering of Tongji University,Shanghai 200092);Risk Loss Analysis During Construction of Soft Soil Shield Tunnel[J];Chinese Journal of Underground Space and Engineering;2006-01
3 WENG Cheng-xian~1,ZHANG Qing-he~1,ZHU Ji-wen~2,CHEN Yong~2(1.Department of Geotechnical Engineering,Tongji University,Shanghai 200092,P.R.China;2.No.2 Municipal Engineering Co.,Ltd,Shanghai 200232,P.R.China);Analysis on Surface Subsidence Resulting From DOT Tunneling in Soft Ground[J];Chinese Journal of Underground Space and Engineering;2006-01
4 Yang Xiuren (Beijing Urban Engineering Design and Research Institute Co., Ltd., Beijing 100037);Key Points in the Design and Construction of Shield Tunnel in Beijing Metro[J];Urban Rapin Rail Transit;2004-06
5 Zhou Wenbo Wu Huiming Zhao Xiaoxia(Shanghai Tunnel Engineering Co., Ltd., Shanghai 200082 );The Application of Homemade Metro Shield Machine in the Tunnel Construction of Urban Rail Transit[J];Urban Rapid Rail Transit;2006-02
6 Le Guiping Jiang Yusheng(1. Beijing MTR Construction Administration Corporation, Beijing 100037; 2. China University of Mining and Technology (Beijing) , Beijing 100083);Shield Tunneling in Beijing Area[J];Urban Rapid Rail Transit;2006-02
7 Le Guiping Su Yi(Beijing MTR Construction Administration Corporation,Beijing 100037);Engineering Quality Management and Control of Shield Tunneling for Beijing Subway[J];Urban Rapid Rail Transit;2007-03
8 KANG Bao-sheng,CHEN Kui,LI Rong-zhi;Beginning and end construction technology with shield machine in Nanjing subway engineering[J];Construction Mechanization;2004-02
9 ZHU Jian-chun, LI Le, DU Wen-ku;Research on shield machine construction with pouring mortar simultaneously and mortar materials in Beijing subway[J];Construction Mechanization;2004-11
10 FAN Wei;Originating Technique for the Shield-driven Tunnel[J];Sci-Tech Information Development & Economy;2006-02
【Secondary References】
Chinese Journal Full-text Database 8 Hits
1 Qu Tianxiang(China Railway Tunnel Joint Stock Co., Ltd., Xinxiang, Henan 453000);Shield Type Selection for the Water Diversion Tunnel Project across the Yellow River[J];Urban Rapid Rail Transit;2007-01
2 Wang Cemin1 Ju Shijian2(1.Beijing Urban Engineering Design and Research Institute,Co.,Ltd.,Beijing 100037;2.Guangzhou Metro Design and Research Institute,Guangzhou,510010);Orientation and Deviation Control System for Shield and Lining Ring[J];Urban Rapid Rail Transit;2008-02
3 Chen Jian(China Railway 14th Bureau Group Co. Ltd., Jinan 250014);Integrated Technical Control of Tunneling with a Super-large Diameter Slurry Shield[J];Urban Rapid Rail Transit;2008-06
4 ZHANG Jun1,ZHANG Chixiang2(1.Parsons Brinckerhoff Engineering Technology(Beijing) Co.Ltd.,Beijing 100062,China;2.The Second Survey and Design Institute of CREC,Chengdu 610031,China);Study on Longitudinal Deformation of River-Crossing Shield-bored Tunnel Caused by Riverbed Scouring and Siltation[J];Tunnel Construction;2009-02
5 JIANG Yusheng,YANG Zhiyong,JIANG Hua,LUAN Wenwei (School of Mechanics and Civil Engineering,China University of Mining and Technology(Beijing),Beijing 100083,China);Study on Reasonable Strata Improvement Scopes for EPB Shield Driving at Its Start and Arrival[J];Tunnel Construction;2009-03
6 WANG Ji-hua;The technique of earth pressure balance shield original heading construction[J];Shanxi Architecture;2009-09
7 LI Maowen1,LIU Jianguo2,HAN Xuefeng2,CHEN Shougen1(1.Southwest Jiaotong University,Chengdu 610031,China;2.China Railway South Investment and Development Co.,Ltd.,Shenzhen 518055,Guangdong,China);Key Technologies of Long-Distance Shield Boring in Hard Rock[J];Tunnel Construction;2009-04
8 ZHANG Jian-gang1,2,HE Chuan1,YANG Zheng3(1.School of Civil Engineering,Southwest Jiaotong University,Chengdu 610031,China;2.School of Water Conservancy and Civil Engineering,Shandong Agricultural University,Tai'an 271018,China;3.Subway Design and Research Institute,the Second Railway Survey and Design Institute,Chengdu 610031,China);Study on Reinforcement of Segment Lining Structure for Large-scale Underwater Shield Tunnel[J];Journal of the China Railway Society;2009-05
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved