Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Urban Rapid Rail Transit》 2007-03
Add to Favorite Get Latest Update

Analysis of Passenger Flow Prediction and Design of Operation Organization

Shen Jingyan(Beijing Urban Engineering Design and Research Institute Co.,Ltd.,Beijing 100037)  
Time limits and contents of passenger flow prediction are proposed from the demands of operation.Extent of operation is determined through the description of passenger flow amount and the analysis of the three-class data of passenger flow prediction.Evaluation for the load factor and crowd degree is performed on the basis of OD(Origin and Destination)passenger flow analysis incorporating the study of traffic round trip.In the end,the reasonable combination of carriage composition with traffic intensity is determined,with the comprehensive technological scheme of the system formulated,so that passenger flow prediction can serve operation organization well.
【CateGory Index】: U293.13
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【References】
Chinese Journal Full-text Database 8 Hits
1 Shen Jingyan (Beijing Urban Engineering Design & Research Institute Co., LTD, Beijing 100037, China);Forecasting and Application of Rail Transit Passenger Volumes[J];Urban Transport of China;2008-06
2 Shen Jingyan(Beijing Urban Engineering Design and Research InstituteCo.,Ltd.,Beijing 100037);Discussion on the Length of an Urban Rail Transit Line[J];Urban Rapid Rail Transit;2008-04
3 Liang Qiangsheng Yang Pujie(Guangzhou Metro Corporation,Guangzhou 510030);Feasibility Study on Improving Operational Efficiency by Placing Passenger Trains on Metro Lines at Night[J];Urban Rapid Rail Transit;2008-04
4 An Shuanzhuang Wang Bo Li Xiaoxia(China Metro Engineering ConsultingCorporation, Beijing 100037);Inspiration for Rail Transit Passenger Flow Forecast from the Operation of Beijing Subway Line 5[J];Urban Rapid Rail Transit;2008-06
5 Chen Yao(Shenzhen Municipal Design & Research Institute Co.,Ltd.,Shenzhen 518029);Application of Passenger Flow Prediction in the Traffic Operation Organization of Nanning Metro[J];Urban Rapid Rail Transit;2010-02
6 Wu Fei1 Zhang Yan2 (1. Beijing Jiaotong University,Beijing 100044;2.Beijing Urban Engineering Design and Research Institute Co.,Ltd.,Beijing 100037);Discussion about Composition of Trains in URT[J];Urban Rapid Rail Transit;2010-04
7 Zhang Yan(China Metro Engineering Consultant Corporation,Beijing 100037);Research on Y-Type Line Node of Urban Rail Transit[J];Urban Rapid Rail Transit;2011-01
8 QIAO Jun-Jie,JIANG Tian-yi,GU Song-yuan,LI Xi,YANG Li-li(School of Transportation Engineering,Tongji University,Shanghai 201804,China);Using Passenger Rail Transit to Conduct Express Logistics[J];Transportation Standardization;2012-20
【Co-references】
Chinese Journal Full-text Database 10 Hits
1 WANG Yan;Hierarchy-Fuzzy Comprehensive Judgment for Safety Evaluation of Metro Running Tunnel[J];Underground Space;2004-03
2 LI Xi-yuan~1,YAN Jing-ya,SUN Yan-ping~2(1.Guangdong Road Engineering construction Co.Ltd.,Guangzhou 510635,China;2.Department of Geotechnical Engineering,School of Civil Engineering,Tongji University,Shanghai 200092,China);Reasons and Countermeasures of Accidents Happened during the Shield Tunnel Construction[J];Chinese Journal of Underground Space and Engineering;2005-06
3 HUANG Hong-wei(Dept.of Geotechnical Engineering,Tongji University,Shanghai 200092,China);State-of-the-Art of the Research on Risk Management in Construction of Tunnel and Underground Works[J];Chinese Journal of Underground Space and Engineering;2006-01
4 HUANG Hong-Wei~1,ZENG Ming~2,CHEN Liang~1,HU Qun-fang~1(1.Department of Geotechnical Engineering,Tongji University,Shanghai 200092,China;2.General Office of Commanding Post of Shanghai Tunnel & Bridge Construction,Shanghai 200120,China);Risk Management Software (TRM1.0) Based on Risk Database for Shield Tunneling[J];Chinese Journal of Underground Space and Engineering;2006-01
5 CHEN Long~1,HUANG Hong-wei~2(1.Shanghai Civic Engineering Construction and Developing Ltd.,Shanghai 200025;2.The Department of Geotechnical Engineering of Tongji University,Shanghai 200092);The Practice of Risk Management in Shangzhong Road Tunnel Engineering[J];Chinese Journal of Underground Space and Engineering;2006-01
6 CHEN Jun,SHI Xiao-dong(Beijing Urban Planning Design and Research Institute,Beijing 100045,China);Investigation on Underground Space Development and Utilization in Central Area of New Town in Beijing——taking the development and utilization of underground space at the integrated area in front of New Town Station,Yizhuang as an example[J];Chinese Journal of Underground Space and Engineering;2006-S1
7 CAO Ping1,2,DING Shi-zhao1(1.School of Economics & Management,Tongji University,Shanghai 200092 P.R.China;2.School of Architecture & Civil Engineering,Xi'an Science & Technology University,Xi'an 710054 P.R.China);Implementation Planning of Subway Construction Project[J];Chinese Journal of Underground Space and Engineering;2008-01
8 GAO Zi you 1,SONG Yi fan 1,SI Bing feng 1,W H K Lam 2 (1 College of Traffic and Transport, Northern Jiaotong University, Beijing 100044, China; 2.Dept. of Civil & Structural Engineering, The Hong Kong Polytechnic University,Hongkong);A SUE Assignment Model and Solution Algorithm with Elastic Transit Demand and Bottlenecks for Public Transport Networks(Ⅰ)[J];Journal of Northern Jiaotong University;2000-06
9 SUN Wan_hua, LIU Gang(School of Traffic and Transport, Beijing Jiaotong University, Beijing 100044,China);Research on the Model of Forecasting Passenger Flow of the Intercity Train[J];Journal of Northern Jiaotong University;2005-03
10 LUO Xiao,LIU Meng(College of Environmental Science and Engineering,Nankai University,Tianjin 300071,China);Effect of Urban Rail Transit on Eco-city Construction[J];Urban Environment & Urban Ecology;2006-02
【Secondary References】
Chinese Journal Full-text Database 10 Hits
1 Zhang Jijing Zhang Lei Liu Ming(Beijing Urban Engineering Design and Research Institute Co.,Ltd.,Beijing 100037);Technical Innovations in Beijing Metro Line 5[J];Urban Rapid Rail Transit;2010-03
2 Wu Fei1 Zhang Yan2 (1. Beijing Jiaotong University,Beijing 100044;2.Beijing Urban Engineering Design and Research Institute Co.,Ltd.,Beijing 100037);Discussion about Composition of Trains in URT[J];Urban Rapid Rail Transit;2010-04
3 Liu Haizhou Zhou Tao Gao Zhigang (Chongqing Transportation Planning & Research Institute,Chongqing 400020);Problems and Considerations about Long Lines of Rail Transit[J];Urban Rapid Rail Transit;2012-01
4 Gong Qian,Gu Baonan School of Transportation Engineering,Tongji University,201804,Shanghai,China;Decision Model of Reasonable Line Length for Urban Mass Transit[J];Urban Mass Transit;2012-01
5 Liu Zenghua,Huang Yunhua Guangzhou Metro Design & Research Institute Co.,Ltd.,510010,Guangzhou,China;Selection of Subway Cars for Xi'an Metro Line 4 and the Train Marshaling[J];Urban Mass Transit;2012-08
6 Wu Linke Liu Kading (Shenzhen Metro Group Co.,Ltd.,Shenzhen 518026);Practice and Proposals for Vehicle Matching in Urban Rail Transit[J];Urban Rapid Rail Transit;2012-06
7 Wu Linke,Liu Kading Shenzhen Metro Group Co.,Ltd.,518026,Shenzhen,China;Urban Rail Transit Vehicle Matching[J];Urban Mass Transit;2013-08
8 WANG Zheng;EMUs Design Department,CSR Nanjing Puzhen Rolling Stock Co.,Ltd.;;Train marshalling forms and power arrangement for intercity EMUs[J];Electric Locomotives & Mass Transit Vehicles;2013-05
9 ZHOU Gaowei,LUO Xia School of Transportation & Logistic,Southwest Jiaotong University,Chengdu 610031,China;Passenger demand analysis model of urban rail transit and computer simulation[J];Computer Engineering and Applications;2012-18
10 XU Junfeng(China Railway Tunnel Survey and Design Institute Co.Ltd.,Tianjin 300013,China);Application of Passenger Simulation in Design of Metro Transfer Stations[J];Tunnel Construction;2010-01
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved