Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Urban Rapid Rail Transit》 2010-01
Add to Favorite Get Latest Update

Tianjin Metro Entrusts Others to Maintain Equipment System-Risks and Countermeasures

Zeng Xiaoxu Zhu Yi(Tianjin Metro Operation Corporation,Tianjin 300222)  
Considering the current status of Tianjin metro entrusting others to maintain equipment system,the paper analyzes the risks involved in the present entrust trend and countermeasures. It explains the necessity of entrusting others for maintenance based on the analyses of maintenance costs contrast between self-maintenance and entrusted ones. It defines the maintenance modes based on comprehensive risk analysis of the entrusted maintenance. Corresponding strategies are implemented according to the mode orientation that Tianjin metro and urban rail transit of other cities may take for reference to control risks for entrusting others to maintain equipment system.
【CateGory Index】: U231.94
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Citations】
Chinese Journal Full-text Database 3 Hits
1 Wu Shuang(China Metro Engineering Consulting Corporation,Beijing 100037);On the Construction Planning of URT for Medium-sized Cities in China[J];Urban Rapid Rail Transit;2007-01
2 Hou Shumin,Feng JinfengTianjin Metro General Co.,300040,Tianjin,China;On Socialized Maintenance Service of Metro Equipments in Tianjin Metro Line 1[J];Urban Mass Transit;2005-05
3 Wang Huachuan(Guangzhou Metro Corporation, Guangzhou, 510150);Repairing Tracks Entrusted to Other Units for Guangzhou Metro Line 1[J];Urban Rapid Rail Transit;2007-02
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 Shen Jingyan (Beijing Urban Engineering Design & Research Institute Co., LTD, Beijing 100037, China);Forecasting and Application of Rail Transit Passenger Volumes[J];Urban Transport of China;2008-06
2 Du Caijun~1 Jiang Yukun~2(1. Beijing Jiaotong University, Beijing 100044; 2. Beijing Metro Design Institute, Beijing 100088);Connection of Urban Rail Transit with Other Public Transportations[J];Urban Rapin Rail Transit;2005-03
3 Li Yaozong (Beijing Metro Operation Co., Ltd., Beijing 100044);Some Thoughts on Planning and Scale of Urban Rail Transit in China[J];Urban Rapin Rail Transit;2005-04
4 Zhou Hang(Shenzhen Metro Corporation,Shenzhen 518026);On the Management and Maintenance Models for Public Communication Equipment of Subway[J];Urban Rapid Rail Transit;2007-06
5 Chen Shaozhang(Guangzhou Metro Corporation,Guangzhou 510030);Suburban Railways and Urban Regional Rapid Transit[J];Urban Rapid Rail Transit;2008-05
6 Qiu Yunzhou,Li Yinghui,Ouyang Changcheng Design Institute of Guangzhou MetroCorporation,510010,Guangzhou,China;On the Route Laying Mode of UMT Line Net[J];Urban Mass Transit;2006-07
7 Yu Bo1 Wang Dan2(1. Chengdu Metro Corporation,Chengdu 610031; 2. China Metro Engineering Consulting Corporation,Beijing 100037);Main Ideas and Innovations of the Network Planning for Chengdu Rail Transit[J];Urban Rapid Rail Transit;2009-04
8 Wu Shuang(China Metro Engineering Consulting Corporation,Beijing 100037);Update Urban Rail Transit Construction Planning[J];Urban Rapid Rail Transit;2009-05
9 Fu Rong Wu Weiwei (Institute of Construction & Real Estate,Southeast University,Nanjing 210096);Study on the Safety Risk of Subway Maintenance[J];Urban Rapid Rail Transit;2009-06
10 ;Tianjin Metro to consign other companies to maintenance the equipment system of risks and countermeasures[J];Science & Technology Information;2009-01
【Secondary Citations】
Chinese Journal Full-text Database 7 Hits
1 Song Minhua (Beijing Urban Engineering Design & Research Institute, Beijing 100037);Some Thoughts on the Widespread Construction of Urban Rail Transit Systems[J];Urban Rapin Rail Transit;2004-01
2 Shi Zhongheng;Planning for the Construction of Urban Rail Transit[J];Urban Rapin Rail Transit;2004-02
3 Zhu Jun(Department of Communication Projects of China International Engineering Consulting Corporation, Beijing 100044);Plan Construction of Urban Rail Transit with Scientific Development Conception[J];Urban Rapin Rail Transit;2005-01
4 Li Yaozong (Beijing Metro Operation Co., Ltd., Beijing 100044);Some Thoughts on Planning and Scale of Urban Rail Transit in China[J];Urban Rapin Rail Transit;2005-04
5 Wang Wei (Guangzhou Metro Corporation, Guangzhou 510030);The Advanced Experiences of Operational Management of Hong Kong MTR Corporation[J];Urban Mass Transit;2002-03
6 Ai Fang Ma Jian (China Development Bank Shanghai Branch, Shanghai 200120; China Development Bank, Beijing 100037);A Comparison of Different UMT Investment and Operational Modes[J];Urban Mass Transit;2003-04
7 Xu Zecheng, Ye Xiafei, Gu Baonan First-author's address Shanghai UMT Pearl line(Phase Ⅱ) Development Co., Ltd., 200010,Shanghai,China;Operational Modes of Shanghai UMT Line 3 & Line 4[J];Urban Mass Transit;2004-02
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved