Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Urban Rapid Rail Transit》 2010-05
Add to Favorite Get Latest Update

Study on First-phase Projects Management of Urban Rail Transit

Xu Huizhi(Harbin Metro Corporation,Harbin 150080)  
First-phase projects of urban rail transit comprise three parts:network planning,construction planning and engineering feasibility studies.Management of first-phase projects involves network planning,construction planning,assessment of impact on environment,traffic forecasting,geological hazard assessment,seismic safety assessment,land utilization modification and controlled planning.Without scientific organization,the time for preparation would be greatly increased and the requirements for the project schedule would not be satisfied.It is necessary to carry out a careful analysis on the key time constraints so as to adopt a synchronized method to compile the project management documents.The responsibility of the compiler is defined through contracts.It is proposed to use"gray line" to control the space of subway construction.
【CateGory Index】: U239.5
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Citations】
Chinese Journal Full-text Database 3 Hits
1 Shi Zhongheng;Planning for the Construction of Urban Rail Transit[J];Urban Rapin Rail Transit;2004-02
2 Zhu Jun(Department of Communication Projects of China International Engineering Consulting Corporation, Beijing 100044);Plan Construction of Urban Rail Transit with Scientific Development Conception[J];Urban Rapin Rail Transit;2005-01
3 Bian Yandong Zhu Jun (China International Engineering Consulting Corporation,Beijing 100048);Guided by the Scientific Outlook on Development,Plan Urban Rail Transit Better[J];Urban Rapid Rail Transit;2009-05
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 WU Shuang (China Metro Engineering Consulting Corporation,Beijing 100037,China);Issues Concerning a New-Round Application for Urban Rail Transit Projects[J];Urban Transport of China;2007-03
2 Lu Zhengyu;Compilation Outline for Urban Rapid Rail Transit Construction Plan and Case Study[J];Underground Engineering and Tunnels;2008-02
3 Zhu Jun(Department of Communication Projects of China International Engineering Consulting Corporation, Beijing 100044);Plan Construction of Urban Rail Transit with Scientific Development Conception[J];Urban Rapin Rail Transit;2005-01
4 Qiu Guangyu (Shenyang Metro Engineering Consulting Co.,Ltd.,Shenyang 110014);Some Observations on How to Organize and Compile Technical Documents of Metro Planning[J];Urban Rapin Rail Transit;2005-02
5 Wu Shuang(China Metro Engineering Consulting Corporation (Beijing), Beijing 100037);Land Use Control Planning on Both Sides of Urban Rail Transit[J];Urban Rapin Rail Transit;2005-03
6 Li Yaozong (Beijing Metro Operation Co., Ltd., Beijing 100044);Some Thoughts on Planning and Scale of Urban Rail Transit in China[J];Urban Rapin Rail Transit;2005-04
7 Sun Yi Yu Bo (Chengdu Metro Co., Ltd., Chengdu 610031);On Planning Control and Coordination of Land Use on Both Sides of Urban Rail Transit[J];Urban Rapin Rail Transit;2005-04
8 Chen Xiaodong(Guangzhou Metro Corporation, Guangzhou 510030);Environmental Protection in the Construction and Operation of Guangzhou Metro Line 2[J];Urban Rapin Rail Transit;2005-05
9 Yuan Zhihong(Beijing Urban Engineering Design & Research Institute Co., Ltd., Beijing 100037);A Study on the Optimization Scheme of the Operation Control Center in Beijing Metro[J];Urban Rapin Rail Transit;2005-05
10 Cui Cheng'an(Beijing Sifang and Huaneng Power System Control Co., Ltd., Beijing 100085);The Application of PROFIBUS in Metro[J];Urban Rapin Rail Transit;2005-05
【Secondary Citations】
Chinese Journal Full-text Database 4 Hits
1 Guo Chunan (Urban Plan and Design Institute of Beijing, Beijing 100045);Revised Plan for Beijing Urban Rail Transit Network[J];Urban Rapin Rail Transit;2004-01
2 Shi Zhongheng;Planning for the Construction of Urban Rail Transit[J];Urban Rapin Rail Transit;2004-02
3 ;Metro System Planning in Moscow[J];Urban Planning Overseas;2003-05
4 Jin Feng(Specially appointed expert by Ministry of Housing and Urban/Rural Construction);A Comparison between Urban Rail Transit Networks in the World[J];Urban Mass Transit;2009-02
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved