Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Power System Technology》 2003-10
Add to Favorite Get Latest Update

RESEARCH ON PROCESSING OF SHORT-TERM HISTORICAL DATA OF DAILY LOAD BASED ON KALMAN FILTER

ZHANG Min, BAO Hai, YAN Ling, CAO Jin-ping, DU Jian-guang (North China Electric Power University, Beijing 102206, China)  
The historical data of load is the basis of load forecasting, but the inaccuracy caused by the measurement and artificial factors will lead to the inaccuracy of load forecasting inevitably. Thus, it is indispensable in load forecasting to process the historical data of load. A method to establish basic model of load data by least square linear fitting is presented in which the system parameters of Kalman filter are identified by cubic spline interpolation, then the pre-processing of historical data is performed by Kalman filter to correct the bad data caused by measurement error or human made alteration. After the processing of pseudo-data in historical data of load from practical power system, the posterior error of load forecasting is within 3%.
【CateGory Index】: TM715
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【References】
Chinese Journal Full-text Database 10 Hits
1 Pan Xuehua,Ding Qiaolin,Zhou Wei,Li Xuan(School of Electrical and Electronic Engineering,North China Electric Power University,Baoding 071003,China);Optimal Combined Forecast Based on Analytic Hierarchy Process[J];Electric Power Science and Engineering;2008-04
2 ZHANG Lin1,2,LIU Xian-shan3,YIN He-jun1 (1.Institute of Electronics,ChineseAcademy of Sciences,Haidian District,Beijing 100080,China;2.Graduate School of the Chinese Academy of Science,Haidian District,Beijing 100080,China;3.State Key Laboratory of Hydropower Engineering Science,Wuhan University,Wuhan 430072,Hubei Province,China);APPLICATION OF SUPPORT VECTOR MACHINES BASED ON TIME SEQUENCE IN POWER SYSTEM LOAD FORECASTING[J];Power System Technology;2004-19
3 PAN Feng1,CHENG Hao-zhong1,YANG Jing-fei1,ZHANG Cheng2,PAN Zhen-dong2 (1.Dept. of Electrical Engineering,Shanghai Jiaotong University,Xuhui District,Shanghai 200030,China; 2.Changzhou Power Supply Company,Changzhou 213003,Jiangsu Province,China);POWER SYSTEM SHORT-TERM LOAD FORECASTING BASED ON SUPPORT VECTOR MACHINES[J];Power System Technology;2004-21
4 LI Po,LI Min,LIU Di-chen(School of Electrical Engineering,Wuhan University,Wuhan 430072,Hubei Province,China);Power Load Forecasting Based on Improved Regression[J];Power System Technology;2006-01
5 JIANG Hui-lan, LIU Xiao-jin, GUAN Ying, WANG Meng-bin (School of Electrical Engineering and Automation, Tianjin University, Nankai District, Tianjin 300072, China);Short-Term Load Forecasting Based on Hard-C Mean Clustering Algorithm and Support Vector Machine[J];Power System Technology;2006-08
6 ZHANG Lin, LUO Xiao-chu, XURui-lin, ZHAO Li (Chongqing Electric Power CORP., Chongqing 400014, China);Study on Novel Algorithm Based on Time Series in Power System Load Forecasting[J];Power System Technology;2006-S2
7 CHEN Wei,WU Yao-wu,LOU Su-hua,XIONG Xin-yin (Electric Power Security and High Efficiency Lab (Huazhong University of Science and Technology), Wuhan 430074,Hubei Province,China);A Short–Term Load Forecasting Model Based on ARIMA and BPNN[J];Power System Technology;2007-03
8 DING Qiao-lin,PAN Xue-hua,YANG Xue-ming (School of Electrical and Electronic Engineering,North China Electric Power University,Baoding 071003,Hebei Province,China);Optimal Combined Forecasting Method Used in Power Load Forecasting[J];Power System Technology;2008-S1
9 LI Ni,JIANG Yue-chun,HUANG Shan,MAO Li-fan (College of Electrical and Information Engineering,Hunan University,Changsha 410082,Hunan Province,China);Short-Term Load Forecasting Based on ARIMA Transfer Function Model[J];Power System Technology;2009-08
10 MENG Si-qi,YANG Hong-geng(School of Electric Engineering and Information,Sichuan University,Chengdu 610065,China);Short-Term Load Forecasting Based on Second-Order Correction of Kalman Filter[J];Advances of Power System & Hydroelectric Engineering;2008-02
China Proceedings of conference Full-text Database 1 Hits
1 ZHANG Lin, LUO Xiao-chu, XU Rui-lin, ZHAO Li (Chongqing Electric Power CORP., Chongqing 400014, China);Study on Novel Algorithm Based on Time Series in Power System Load Forecasting[A];[C];2006
【Citations】
Chinese Journal Full-text Database 2 Hits
1 Yang Zhenglin, Song Yanmin, Cao Rongzhang, Sun Weizhen, Wu Jinhui(1. Naming Automation Research institute, Naming 210003, China)(2. Zhejiang Electric Power Dispatching Center, Hangzhou 310007, China);APPLICATION OF ULTRA-SHORT TERM LOAD FORECASTING IN POWER MARKET[J];AUTOMATION OF ELECTRIC POWER SYSTEMS;2000-11
2 Lu Ruhua Xu Chuanyu Zhang Ling Mao Weixing(National Meteorological Center, Beijing 100081);CALCULATION METHOD FOR INITIAL VALUE OF KALMAN FILTER AND ITS APPLICATION[J];QUARTERLY JOURNAL OF APPLIED METEORLOLGY;1997-01
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 SHAO Mingxuan 2),3) WU Qingli 2) ( 2)State Key Lab for Severe Storm Research,Department of Atmospheric Sciences,Physical School,Peking University, Beijing,100871; 3)Institute of Urban Meteorology,CMA,Beijing,100089) LIU Fenghui WEI Jianming DOU Yiwen (Beijing Meteorological Bureau,Beijing,100089) XU Fang (China Patent Information Center,State Intellectual Property Office,Beijing,100088);An Objective Forecast Experiment in Precipitation at Stations[J];Acta Scicentiarum Naturalum Universitis Pekinesis;2004-01
2 Ding Qia , Lu Jiangang , Qian Yumei , Zhang J ian , Liao Huaiqing ( Nanjing Automation Research Institute, Nanjing 210003, China) ( Gangdong Electric Power Dispatching Center, Guangzhou 510600, China) ( Jangsu Electric Power Dispatching Center, Nanjing 210024, China) ( Shanghai Electric Power Company, Shanghai 200025, China);A PRACTICAL METHOD FOR ULTRA-SHORT TERM LOAD FORECASTING[J];Automation of Electric Power Systems;2004-16
3 YANG Zheng-lin , TANG Guo-qing , SONG Yan-min , CAO Rong-zhang ( Southeast University, Nanjing 210096, China) ( Nanjing Automation Research Institute, Nanjing 210003, China);Improved Cluster Analysis Based Ultra-short Term Load Forecasting Method[J];Automation of Electric Power Systems;2005-24
4 Li Can Gong Lenian (Southeast Uniuersity,Nanjing 210096) Song Yanmin Yu Jie (Nanjing Automation Research Institute,Najing 210003);THE ANALYSIS OF SPOT PRICES IN ELECTRICITY MARKET[J];Proceedings of The Csu-epsa;2001-06
5 LUO Dian-sheng,LI Wei-wei,HE Hong-ying (College of Electric and Information Engineering,Hunan University,Changsha 410082,China);Very Short-Term Load Forecasting Method Based on Local Shape Similarity[J];Proceedings of the Chinese Society of Universities for Electric Power System and its Automation;2008-01
6 ZHANG Feng1,WU Jin-hui1,ZHANG Yi2,HU Ruo-yun2 (1.Zhejiang Electric Power Dispatching and Communication Center,Hangzhou 310007,Zhejiang Province, China;2.Zhejiang College of Electrical Power Technology,Hangzhou 310015,Zhejiang Province,China);A NOVEL ULTRA-SHORT TERM LOAD FORECASTING BASED ON LOAD TREND[J];Power System Technology;2004-19
7 YANG Zheng-ling,ZHANG Guang-tao,CHEN Hong-xin,LIN Kong-yuan (School of Electrical Engineering and Automation,Tianjin University,Nankai District,Tianjin 300072,China);PARAMETER OPTIMIZATION IN SYNTHESIZING LOAD TREND AND CHAOTIC COMPONENTS TO SHORT TERM LOAD FORECASTING[J];Power System Technology;2005-04
8 LUO Dian-sheng,HE Hong-ying (School of Electrical and Information Engineering,Hunan University,Changsha 410082,Hunan Province,China);A Shape Similarity Criterion Based Curve Fitting Algorithm and Its Application in Ultra-Short-Term Load Forecasting[J];Power System Technology;2007-21
9 GAO Shan hong,WU Zeng mao,XIE Hong qin (Institute of Physical Oceanography, Ocean University of Qingdao, Qingdao 266003,China);THE DEVELOPMENTS AND APPLICATIONS OF KALMAN FILTERS IN METEOROLOGICAL DATA ASSIMILATION[J];ADVANCE IN EARTH SCIENCES;2000-05
10 ZHU Yan-bo,GUO Yun-tao,ZHANG Jun (School of Electronic&Information Engineering,BUAA,Beijing 100191,China);A Study of AMDAR-Based Air Route Meteorological Model[J];Avionics Technology;2009-02
China Proceedings of conference Full-text Database 1 Hits
1 He Hao, Jiang Chuangye, Cai Xinling (Shanxi Professional Meteorology Observatory, Xi'an 710015);The Application Technique of Numerical Forecast Product In Successive Weather Element Fields[A];[C];2002
【Co-references】
Chinese Journal Full-text Database 10 Hits
1 ZHU Tao ye 1, YAN Xiao bing 2, LI Ying qiu 2 (1.Center of Modern Education Technology, Changsha Univ. of Electr. Power, Changsha 410077,China;2.Institute of Applied Math.,Changsha Univ. of Electr.Power,Changsha 410077,China);The ARIMA Model in the Forecasting of Power Load in Guangxi[J];JOURNAL OF CHANGSHA UNIVERSITY OF ELECTRIC POWER(NATURAL SCIENCE);2000-02
2 LIU Sai, CHEN Guang-dong(Dept. of Control Science & Eng. .Huazhong Univ. of Science & Technology,Wuhan 430074,China);Application of Analytic Hierarchy Process on the Electric Power Load Combination Forecasting[J];Journal of Changsha University of Electric Power(Natural Science);2002-04
3 LI Ying1, ZHAO Zhengjiang2, WU Songtao3(1.Modern Education Technical Center,Changsha Univ. of Electr. Power,Changsha 410077,China;2.Dept. of Math.,Huzhou Teachers College,Huzhou 312000,China;3.Changsha National Tax Bureau,Changsha 410000,China);Application of Grey Model to the Ordinary Daily Electric Power Load Forecasting[J];Journal of Changsha University of Electric Power(Natural Science);2003-01
4 LI Jian-yun~1,ZENG Ci-ling~2,XIE Pei-yuan~2(1.Changsha Planning & Design institute,Changsha 410007,Hunan Province,China; 2.Hunan Electric Power Dispatch & Communication Centre,Changsha 410007,Hunan Province,China);Long Term Load Forecasting of Changsha Based on Combined Model[J];Journal of Changsha University of Electric Power(Natural Science);2005-03
5 CHEN Ya-hong 1,MU Gang 1,DUAN Fang-li 2 (1.Department of Electric Power Engineering,Northeast China Institute of Electric Power Engineering,Jilin City 132012;2.Nylon 66 Salt Plant of Shenma Group of China,Henan Province 467000);Identification and Management to Anomalous Data in Short-term Load Forecasting[J];Journal of Northeast China Institute of Electric Power Engineering;2002-02
6 LIU Jia,LI Dan,GAO Li-qun,LU Shun(School of Information Science & Engineering,Northeastern University,Shenyang 110004,China.);A Short-Term Load Forecasting Approach Based on Support Vector Machine with Adaptive Particle Swarm Optimization Algorithm[J];Journal of Northeastern University(Natural Science);2007-09
7 GUO Yuan-fan,YANG Feng,DONG Zhao-xia(College of Hydropower and Information Engineering in Huazhong University of Science and Technology,Wuhan 430074,China);Available transfer capability calculation using particle swarm optimization algorithm[J];Advanced Technology of Electrical Engineering and Energy;2006-04
8 Juping; Li Defeng (Hohai University 210098 China);Identification of Composite Induction Motor Loads[J];TRANSACTIONS OF CHINA ELECTROTECHNICAL SOCIETY;1999-01
9 Ju Ping Ni Laqin Han Jingdong (Hehai University 210098 China) Chen Xinqi (Zhejiang Institute of Electrical Test 310014 China);Simulated Evolutionary Approaches to Parameter Estimation of Synchronous Machines[J];TRANSACTIONS OF CHINA ELECTROTECHNICAL SOCIETY;1999-05
10 Zhou Xiaoyao Ju Ping(Shanghai Jiaotong University 210098 China);Dynamic Equivalents of Distribution Systems for Voltage Stability Studies[J];Transactions of China Electrotechnical Society;2001-06
【Secondary References】
Chinese Journal Full-text Database 10 Hits
1 JIANG Zhu-nan,LIU Feng,YU Wen-bo(Department of Electrical Engineering,Shenyang Institute of Engineering,Shenyang 110136,China);A novel method of short-time load forecasting based on wavelet packet feature extracting and radial basis function network[J];Journal of Electric Power Science and Technology;2007-02
2 YING Jian-lie,HUA Guo-dong,LIU Yao-nian(School of Electrical Engineering,Northeast Dianli University);Power system load forecastingbased on v-support vector regression[J];Journal of Northeast Dianli University;2007-02
3 Liu Mengliang1 Liu Xiaohua2 Gao Rong2 (1. Shandong Agricultural University Taian 271018 China 2. Ludong University Yantai 264025 China);Short Term Load Forecasting Using Wavelet Transform and SVM Based on Similar-Days[J];Transactions of China Electrotechnical Society;2006-11
4 Zheng Xiaoyu1 Ma Jin1 He Renmu1 Tang Yonghong2 (1. Key Laboratory of Power System Protection and Dynamic Security Monitoring and Control under Ministry of Education North China Electric Power University Beijing 102206 China 2. Sichuan Electric Power Research Institute Chengdu 610072 China);Classification and Generalization of the Load Model Based on Model Dynamic Responses[J];Transactions of China Electrotechnical Society;2009-02
5 Zhou Xiaohua (Guangxi University of Technology);Research on Mid-Long Term Power Load Forecasting Based on GMDH[J];Electrotechnical Application;2008-06
6 Wan Guocheng (GPG Guangzhou Power Supply Bureau);Application of Least Souare Method in Yearly Load Forecasting of Feeders[J];Electrotechnical Application;2008-09
7 FEI Li-xin,SONG Ji-xue, YU Xing-hua (The Engineering Institute,Air Force Engineering University,Xi'an 710038,China);Application of support vector machines in aircraft condition monitoring[J];Electronics Optics & Control;2007-06
8 Wang Ying 1,Peng Peng2(1.School of Business Administration,North China Electric Power University,Baoding 071003,China;2.Development and Plan Department of Guangdong Power Grid Orporation,Guangzhou 510600,China);Spatial Load Forecasting Considering Uncertainty in Urban Power Network Planning[J];Electric Power Science and Engineering;2009-02
9 ZHANG Ya-jun, LIU Zhi-gang, HUO Bai-chao, ZHANG Da-bo(Southwest Jiaotong University, Chengdu 610031, China);The combination forecasting model for power load based on support vector machine[J];Power Demand Side Management;2007-02
10 NIU Dong-xiao,GU Xi-hua (North China Electric Power University, Baoding 071003,China);Application of fuzzy decision making method based on expected value modified by SVM in the evaluation of electricity customers' credit[J];Power Demand Side Management;2007-05
China Proceedings of conference Full-text Database 4 Hits
1 DAI Yi, WANG Xi-huai (Department of Electrical and Automation, Shanghai Maritime University, Shanghai 200135, China.;Ship synchronous generator modeling based on support vector machine[A];[C];2005
2 Liu Yaonian~1 Wang Hao He CHanghao He Ping (Dept.of Electric Power Engineering,Northeast China Institute of Electric Power Engineering Jilin 132012);Power System Load ForecastingBased on V-Support Vector Regression[A];[C];2005
3 Luo Nan1 Zhu Yeyu1、2 Du Cai Yue1 1 Xuchang Meteorological Bureau Henan Xuchang 461000 2 Henan Province Climate Center Henan Zhengzhou 450003;Application of Support Vector Machine Method in Electric Load Forecasting[A];[C];2007
4 HUANG Yuan-sheng ZHENG Yan QI Jian-xun (School of Business Administration,North China Electric Power University,Baoding 071003,China);Application of LS-SVM in Electricity Demand Forecasting[A];[C];2005
【Secondary Citations】
Chinese Journal Full-text Database 4 Hits
1 Cao Rongzhang; Song Yanmin; Hua Dingzhong; Wang Like(Nanjing Automation Research Institute. 210003. Nanjing. China);THE DISCUSSION OF DEVELOPMENT ON CURRENT ELECTRICITY MARKET IN CHINA[J];AUTOMATION OF ELECTRIC POWER SYSTEMS;1998-12
2 Song Yanm in1 . Cao Rongzhang1 . Hua Dingzhong1. Wang Like1 Pan Jiujing2 . Wang Liqun2 . LiJiangang2. Chen Feng2. Wang Dongm ing2 (1.Nanjing Autom ation Research Institute, Nanjing 210003, China) (2.Zhejiang Electric Pow er Dispatching and Com m unicat;INTRODUCTION OF PMOS-2000 POWER MARKET OPERATOR SYSTEM[J];AUTOMATION OF ELECTRIC POWER SYSTEMS;2000-04
3 Wu Jinpei Duan Fangyong;Study Non -Linear Time Series Forecasting Method Based on Neural Networks[J];Systems Engineering;1997-05
4 Lu RuHua; He Yuban(National Meteorological Center, Beijing 100081) (Beijing Institute of Meteorological Application, 100029);The Application of Kalman Filter in Weather Forecasts[J];METEOROLOGICAL MONTHLY;1994-09
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved