Analysis on Measured and Calculated Results of Artificial Single Phase Grounding Test in 750 kV Transmission Pilot Project

JIANG Wei-ping1,ZHU Yi-ying1,WU Ya-ni1,ZENG Zhao-hua1,Lü Peng-fei1,BAN Lian-geng1,ZHU Jiao-xin2,HAN Ti2,LU Jiang-ping3(1.China Electric Power Research Institute,Haidian District,Beijing 100085,China;2.Northwest China Grid Company Limited,Xi'an 710048,Shaanxi Province,China;3.Shaanxi Electric Power Research Institute,Xi'an 710054,Shaanxi Province,China)  
The testing method for artificial single phase grounding test of 750 kV transmission line from Guanting to Lanzhoudong belonging to 750 kV transmission pilot project of State Grid Corporation of China is briefly presented.The reasons leading to the difference between measured values of power frequency parameters of 750 kV transmission line and theoretical calculated values of these parameters are analyzed.Based on the comparison of measured valued of short circuit current,secondary arc current and recovery voltage with these values forecasted by simulation before the test,the reason causing the deviation is researched and by use of Electromagnetic Transients Program-Restructured Version(EMTP-RV)the results of artificial single phase grounding test are reproduced.Finally,the values of secondary arc current and recovery voltage of 750 kV transmission line on different operation mode and different transmission line compensation are forecasted,suggestions relevant to operation and design of 750kV transmission system are proposed.
【CateGory Index】: TM862
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【References】
Chinese Journal Full-text Database 4 Hits
1 FANG Xi1,YIN Yong-hua2 ,YANG Wan-kai2,WU Guo-wei1, SHI Ke-qin1,ZHU Fang2,FAN Yue1,CUI Li-hua3 (1.Northwest China Grid Company Limited,Xi’an 710048,Shaanxi Province,China; 2.China Electric Power Research Institute,Haidian District,Beijing 100085,China; 3.Library of Beijing Normal University,Haidian District,Beijing 100875,China);Analysis on System Small Disturbance Test of 750kV Pilot Project[J];Power System Technology;2006-24
2 YANG Wan-kai1,SHI Ke-qin2,FAN Yue2,NIU Shuan-bao2,YIN Yong-hua1,GUO Qiang1,WU Jian-chao1 (1.China Electric Power Research Institute,Haidian District,Beijing 100192,China;2.Northwest China Grid Company Limited,Xi'an 710048,Shaanxi Province,China);Research on 1 500 MVA Full-Load Test of 750 kV Power Transmission Pilot Project[J];Power System Technology;2008-07
3 PAN Wei1,LIU Wen-ying1,LI Yang-nan1,YANG Yi-han1,SHI Ke-qin2,FAN Yue2 (1.Key Laboratory of Power System Protection and Dynamic Security Monitoring and Control (North China Electric Power University),Ministry of Education,Changping District,Beijing 102206,China;2.Northwest China Grid Company Limited,Xi'an 710048,Shaanxi Province,China);Research on Improving Transmission Capability of Northwest China Power Grid by Use of Actually Measured Parameters of Excitation System[J];Power System Technology;2008-11
4 HAN Bin,LIN Ji-ming,BAN Lian-geng,ZHENG Bin,ZHANG Yuan-yuan,WANG Xiao-tong (China Electric Power Research Institute,Haidian District,Beijing 100192,China);Study on Single-Phase Reclosing Issues for 1000 kV UHVAC Transmission Pilot Project[J];Power System Technology;2009-16
【Citations】
Chinese Journal Full-text Database 5 Hits
1 LIN Hai-xue,DU Shu-chun,ZHAO Gang (China Electric Power Research Institute,Beijing 100085,China);DRAFTING EXPLANATION OF NATIONAL STANDARD “POWER QUALITYTEMPORARY AND TRANSIENT OVERVOLTAGES”[J];Power System Technology;2003-12
2 YIN Yong-hua1,FANG Xi2,ZHU Yue3 (1. China Electric Power Research Institute,Haidian District,Beijing 100085,China;2. Northwest China Grid Company Limited,Xi’an 710048,Shaanxi Province,China;3. Northwest China Electric Power Testing & Research Institute,Xi’an 710054,Shaanxi Province,China);General Situation of System Commissioning for 750kV Transmission Pilot Project[J];Power System Technology;2005-20
3 HU Yi1,WANG Li-nong1,SHAO Gui-wei1,LIU Kai1,ZHANG Ya-peng2 (1.Wuhan High Voltage Research Institute,Wuhan 430074,Hubei Province,China;2.Henan Power Transmission & Transformation Construction Corporation,Zhengzhou 450051,Henan Province,China);An Experimental Investigation on Live Line Work for 750kV Transmission Line[J];Power System Technology;2006-02
4 YI Li-dong, LU Shi-rong (Northwest China Grid Company Limited, Xi'an 710048. Shaanxi Province, China);Study and Application of Construction Key Technologies for 750kV Transmission and Transformation Demonstration Project[J];Power System Technology;2006-03
5 JIANG Wei-ping1,ZHU Yi-ying1,WU Ya-ni1,ZENG Zhao-hua1,BAN Lian-geng1,XIE Xiu-yu2(1.China Electric Power Research Institute,Haidian District,Beijing 100085,China;2.Shaanxi Electric Power Research Institute,Xi'an 710054,Shaanxi Province,China);Analysis on Measured and Calculated Results of the Switching Surge in 750kV Transmission Pilot Project[J];Power System Technology;2006-15
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 CHEN Ji quan, WANG Ru mei (Shanghai Institute of Electric Power, Shanghai 200090, China);Dynamic Magnetizing Characteristic Simulation[J];Transformer;2001-05
2 WANG Cheng-shan,LI Peng(Key Laboratory of Power System Simulation and Control of Ministry of Education,Tianjin University,Tianjin 300072,China);Theory and methodology of power system simulation including distributed generation units[J];Journal of Electric Power Science and Technology;2008-01
3 YUAN Zhong-jun CHANG Shu-sheng WANG Qin-qin ZHOU Xiao-hu (Electrical Engineering College of Northeast Dianli University,Jilin City,Jilin Province,132012);Study on the Lightning Protection Performance of Back Striking for Double-circuit Transmission Line Based on Distributed Line Tower Model[J];Journal of Northeast Dianli University;2007-06
4 QI Lei LU Tie-bing CUI Xiang (Department of Electrical Engineering, North China Electric Power University, Baoding Hebei 071003, China);Transient analysis for nonuniform transmission lines with nonlinear loads[J];Chinese Journal of Radio Science;2003-02
5 QI Lei CUI Xiang LU Tie-bing (School of Electrical Engineering, North China Electric Power University, hnnyxyqq@sina.com, Baoding Hebei 071003, China);Modal-domain modelling of frequency-dependent overhead lines based on recursion algorithm[J];Chinese Journal of Radio Science;2005-02
6 YU Fang1,JIN Qing2,GUO Jie1,ZHAO Shan3(1.High Voltage Division of Xi′an Jiaotong University,Xi′an 710049,China;2.Xi′an Electric Power College,Xi′an 710032,China;3.Yanan Power Supply Bureau,Yanan 716000,China);Research on the Influence of Operation Modes to VFTO in 750 kV GIS[J];Insulators and Surge Arresters;2009-03
7 ZHOU Yu kun, MA Xin shan (Tsinghua University, Beijing 100084, China);Calculation method of electromagnetic shielding effects of underground pipelines to communication cables[J];Advanced Technology of Electrical Engineering and Energy;2001-02
8 LIN Jun, WEN Bu ying (Dept. of Electric Engineering, Fuzhou University, Fuzhou 350002, China);Accurate fault calculations for parallel power lines on same tower[J];Advanced Technology of Electrical Engineering and Energy;2004-02
9 LIN Jun, TANG Qi(College of Electric Engineering, Fuzhou University, Fuzhou 350002, China);Study on accurate calculation for non-complete phases condition of double circuit line and its single-pole reclosing[J];Advanced Technology of Electrical Engineering and Energy;2005-03
10 LIN Jun(College of Electric Engineering, Fuzhou University, Fuzhou 350002, China);Accurate calculation for random faults of double circuit line on loop net[J];Advanced Technology of Electrical Engineering and Energy;2005-04
【Co-references】
Chinese Journal Full-text Database 10 Hits
1 Li Dahu1 Jiang Quanyuan2 Cao Yijia2 (1. Huazhong University of Science and Technology Wuhan 430074 China 2. Zhejiang University Hangzhou 310027 China);Clustering Based on Support Vector Regression Model and Its Application in Power System Transient Stability Prediction[J];Transactions of China Electrotechnical Society;2006-07
2 SONG Jin-hai, LI Xue-ming, JI Chang-an, DAI Yong-rong, SHAO Jun-song, FANG Yong-jie, YU Wen-jie, XUE Yu-sheng Nanjing Automation Research Institute, Nanjing 210003, China;Current Situation and Development Prospect of Security and Stability Control Equipment[J];Automation of Electric Power Systems;2005-23
3 XU Tai-shan, XU Jian-bing, BAO Yan-hong, FANG Yung-jie, LI Bi-jun , XUE Yu-sheng, YAN An-he, SUN Han-xiao (Nanjing Automation Research Institute, Nanjing 210003, China) (Henan Electric Power Dispatching and Communication Center, Zhengzhou 450052, China);On-line Pre-decision Based Preventive and Emergency Control System for Interconnected Power Grids[J];Automation of Electric Power Systems;2006-07
4 HU Jinlei,ZHANG Yao,GUO Li,XIE Huifan(South China University of Technology,Guangzhou 510640,China);Probabilistic Characteristic Calculation of Generator Variables Under Multi-operating Conditions[J];Automation of Electric Power Systems;2007-11
5 PAN Xiong,DING Xinliang,HUANG Mingliang,YANG Panfeng(Department of System Planning,Northwest Electric Power Design Institute,Xi'an 710075,China);Simulation Analysis on Application of Controllable Reactors in 750 kV Northwest China Power Grid[J];Automation of Electric Power Systems;2007-22
6 Sun Guanghui(Nanjing Automation Research Institute, 210003, Nanjing, China);TECHNIQUES IN REGIONAL STABILITY CONTROL[J];AUTOMATION OF ELECTRIC POWER SYSTEMS;1999-03
7 ZHAO Shu qiang, CHANG Xian rong; PAN Yun jiang (North China Electric Power University, Baoding 071003, Hebei province, China);A FUZZY CLUSTERING METHOD FOR COHERENT GENERATOR GROUPS RECOGNITION IN POWER SYSTEM[J];Power System Technology;2001-04
8 DING Ming, LI Sheng hu, HUANG Kai (Hefei University of Technology, Hefei 230009, Anhui Province, China);PROBABILISTIC LOAD FLOW ANALYSIS BASED ON MONTE-CARLO SIMULATION[J];Power System Technology;2001-11
9 DING Xin liang (Northwest Electric Power Design Institute, Xi'an 710032, Shaanxi Province, China);750 kV -AN INEVITABLE CHOICE OF HIGHER VOLTAGE GRADE FOR NORTHWEST POWER GRID IN CHINA[J];Power System Technology;2002-03
10 ZHU Fang, TANG Yong, ZHANG Dong-xia, ZHANG Wen-chao (China Electric Power Research Institute, Beijing 100085, China);STUDY ON DYNAMIC STABILITY PROBLEMS OF AC INTERCONNECTED AREA POWER GRIDS IN CHINA AND THEIR SOLUTIONS[J];Power System Technology;2004-15
【Secondary References】
Chinese Journal Full-text Database 4 Hits
1 YANG Wan-kai1,SHI Ke-qin2,FAN Yue2,NIU Shuan-bao2,YIN Yong-hua1,GUO Qiang1,WU Jian-chao1 (1.China Electric Power Research Institute,Haidian District,Beijing 100192,China;2.Northwest China Grid Company Limited,Xi'an 710048,Shaanxi Province,China);Research on 1 500 MVA Full-Load Test of 750 kV Power Transmission Pilot Project[J];Power System Technology;2008-07
2 PAN Wei1,LIU Wen-ying1,LI Yang-nan1,YANG Yi-han1,SHI Ke-qin2,FAN Yue2 (1.Key Laboratory of Power System Protection and Dynamic Security Monitoring and Control (North China Electric Power University),Ministry of Education,Changping District,Beijing 102206,China;2.Northwest China Grid Company Limited,Xi'an 710048,Shaanxi Province,China);Research on Improving Transmission Capability of Northwest China Power Grid by Use of Actually Measured Parameters of Excitation System[J];Power System Technology;2008-11
3 WANG Qing1,SUN Hua-dong1,MA Shi-ying1,SUN Bin2,MA Qin-feng2,ZHOU Chuan-mei2(1.China Electric Power Research Institute,Haidian District,Beijing 100192,China;2.Guizhou Electric Power Dispatching and Communication Center,Guiyang 550002,Guizhou Province,China);General Principle of Power System Small Signal Stability Evaluation and Its Application in Guizhou Power Grid[J];Power System Technology;2009-06
4 DONG Ming-qi,YANG Dong-jun,HUANG Yong,ZHOU Hong(Technology Center of Central China Grid Company Limited,Wuhan 430077,Hubei Province,China);Simulation of Regional Low Frequency Oscillation Based on Data Measured by WAMS of Central China Power Grid[J];Power System Technology;2009-13
【Secondary Citations】
Chinese Journal Full-text Database 10 Hits
1 DING Xin liang (Northwest Electric Power Design Institute, Xi'an 710032, Shaanxi Province, China);750 kV -AN INEVITABLE CHOICE OF HIGHER VOLTAGE GRADE FOR NORTHWEST POWER GRID IN CHINA[J];Power System Technology;2002-03
2 ZHENG Bao-sen, GUO Ri-cai (State Power Grid Corporation of China, Beijing 100031, China);ON DEVELOPMENT OF INTERCONNECTION OF POWER NETWORKS IN CHINA[J];Power System Technology;2003-02
3 YU You-wen, JIN Yong-chun (North China Electric Power Group, Beijing 100053, China);KEY TECHNOLOGIES FOR 500kV COMPACT TRANSMISSION LINE FROM CHANGPING TO FANGSHAN[J];Power System Technology;2003-07
4 LIN Hai-xue,DU Shu-chun,ZHAO Gang (China Electric Power Research Institute,Beijing 100085,China);DRAFTING EXPLANATION OF NATIONAL STANDARD “POWER QUALITYTEMPORARY AND TRANSIENT OVERVOLTAGES”[J];Power System Technology;2003-12
5 MA Jing,WANG Zeng-ping,XU Yan (School of Electrical Engineering,North China Electric Power University, Baoding 071003,Hebei Province,China);A NEW METHOD TO IDENTIFY INRUSH CURRENT AND SHORT CIRCUIT CURRENT OF TRANSFORMER BASED ON CORRELATION FUNCTION[J];Power System Technology;2005-06
6 CHENG Gai-hong,XU Zheng (Department of Electrical Engineering,Zhejiang University,Hangzhou 310027,Zhejiang Province,China);ANALYSIS AND CONTROL OF HARMONIC OVERVOLTAGES DURING EARLY STAGES OF POWER SYSTEM RESTORATION[J];Power System Technology;2005-10
7 HUANG Ming-liang (Northwest Electric Power Design Institute,Xi’an 710032,Shaanxi Province,China);STUDY ON CONNECTING SYSTEM FOR LAXIWA HYDROPOWER STATION AND CONSTRUCTION SCHEMES OF 750kV NORTHWEST CHINA POWER GRID[J];Power System Technology;2005-13
8 YIN Yong-hua1,FANG Xi2,ZHU Yue3 (1. China Electric Power Research Institute,Haidian District,Beijing 100085,China;2. Northwest China Grid Company Limited,Xi’an 710048,Shaanxi Province,China;3. Northwest China Electric Power Testing & Research Institute,Xi’an 710054,Shaanxi Province,China);General Situation of System Commissioning for 750kV Transmission Pilot Project[J];Power System Technology;2005-20
9 XU Wei, CHEN Shui-ming, HE Jin-liang ( State Key Lab of Control and Simulation of Power Systems and Generation Equipments (Dept. of Electrical Engineering, Tsinghua University), Haidian District, Beijing 100084, China);Research on Switching Overvoltage Caused by Faults in 1000kV UHV AC Transmission Line[J];Power System Technology;2005-21
10 YI Li-dong, LU Shi-rong (Northwest China Grid Company Limited, Xi'an 710048. Shaanxi Province, China);Study and Application of Construction Key Technologies for 750kV Transmission and Transformation Demonstration Project[J];Power System Technology;2006-03
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved