Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Journal of Chongqing University(Natural Science Edition)》 1992-06
Add to Favorite Get Latest Update

OPTIMAL DESIGN WITH WHOLE STRUCTURE PARAMETERS OF LOWER PART OF HUGE EXCAVATOR

Liu Chongde Wang Xiaoming Gu Lan  
A optimal design with whole structure parameters and its program are carried out. A reasonable model is established. Using the method a optimal design with whole structure parameters by original parameters of American PH2300xp excavator was calculated. The size,carried out by the method,approximates to the size of PH2300xp excavator very well.
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 WEI Zheng-yu,YANG Wen-yi,GUO Yu-xi(Technology Center,Taiyuan Heavy Industry Co.,Ltd.,Taiyuan 030024,China);180t forging lifting rotary table[J];Forging & Stamping Technology;2011-01
2 ZHAO Guodong,WEI Zhengyu (Technology Center,Taiyuan Heavy Industry Co.,Ltd.,Taiyuan 030024,Shanxi China);The application of radial piston hydraulic motor to lifting rotary table for forgings[J];China Metal Forming Equipment & Manufacturing Technology;2011-04
3 Liu Chongde Yu Jiyuan Wang Xiaoming;BOUNDARY ELEMENT METHOD FOR MULTI-BODY CONTACT PROBLEM AND ITS APPLICATION IN HUGE EXCAVATOR[J];Journal of Chongqing University(Natural Science Edition);1992-06
4 ZHAO Ke-li1,HU Ying-hua1,GAO Su-he2,ZHANG Tian-yi1(1.School of Mechanical Engineering,Jilin University,Changchun 130025,China;2.Taiyuan Heavy Machinery Co.,Ltd.,Taiyuan 030024,China);Dynamical research on groung pressure of large-scale mining crawler excavators[J];Chinese Journal of Construction Machinery;2010-04
5 ;Finite Element Analysis for Dipper Stick of 10 Cubic Meter Mining Excavator[J];Construction Machinery and Equipment;2008-08
6 MAO Kun-peng;Guangxi Petrochemical Company,CNPC;;Contrast of Mechanical,Hydraulic Excavator Mining and Fivebar Tracks Trajectory[J];Technology & Development of Chemical Industry;2013-11
7 WEI Zhengyu,WANG Yonghui(Technology Center,Taiyuan Heavy Industry Co.,Ltd.,Taiyuan Shanxi 030024,China);The Application of Low-speed High-torque Hydraulic Motor to Rotating Upset Table[J];Machine Tool & Hydraulics;2011-22
8 WANG Shui-Lin1,ZOU Yue-Wei2,LI Hai-Wei1(1.College of Mechanical Engineering,Jilin University,Changchun Jilin 130022,China;2.College of Mechanical Instrumental Engineering,Xi'an University of Technology,Xi'an Shanxi 710048,China);Application of Simulation on Crawler Travelling Mechinanics Based on the ADAMS[J];Development & Innovation of Machinery & Electrical Products;2008-03
9 MA Le, ZHAO Keli, ZHAI Hongyan (College of Machanical Sci. & Eng., Jilin Univ., Changchun Jilin 130025, China);Simulation of Working Equipment of Heavy Mining Excavator[J];Computer Aided Engineering;2006-S1
10 SU Yun-dong,LI Hong,LI Jin-huan(Taiyuan Heavy Industry Co.Ltd,Taiyuan 030024,China);The Structure Improvement of the WK-12 Excavator's Boom[J];Mechanical Management and Development;2011-01
【Co-references】
Chinese Journal Full-text Database 10 Hits
1 LI Kui xian 1, SONG Gui qiu 1, PENG Wu liang 1, WANG Xin zhong 2 (1. School of Mechanical Engineering & Automation, Northeastern University,Shenyang 110004,China; 2. Taiyuan Heavy Machine Co.,Ltd., Taiyuan 030024,China);Optimal Design of Digging Process and Mechanism Parameters[J];JOURNAL OF NORTHEASTERN UNIVERSITY;2001-03
2 ZHENG Hui-qiang~(1,2) WANG Ye-wen~2 1.Shanghai Institute of Technology,Shanghai 200235,China; 2.School of Mechanical Engineering,Tongji University,Shanghai 200092,China);Mathematic model for optimal design of swing arm on hydraulic excavator[J];Chinese Journal of Construction Machinery;2006-02
3 WANG Jian-jun,FENG Guang-jin,ZHAN Bi-hong,YI Jing-yu(College of Mechanical Engineering and Automation,Huaqiao University,Xiamen 361021,China);Three-dimensional modeling and finite element analysis on working devices for small-size hydraulic excavators[J];Chinese Journal of Construction Machinery;2011-01
4 ;A Summary of Small-size Excavators Home and Abroad[J];Construction Machinery and Equipment;2007-04
5 ;Present Situation of Technical Research Development of Hydraulic Excavators[J];Construction Machinery and Equipment;2007-08
6 Chen Jian,Liu Xin,Zhou Xin et al;Optimal Design of Boom Structure for Hydraulic Excavators[J];Construction Machinery and Equipment;2008-07
7 YangYing, Chen Jin, ZhangShiqianget al.;Optimal Design of Work Attachment for Hydraulic Front Shovel[J];Construction Machinery and Equipment;2008-07
8 ;Optimal Design of Boom for Hydraulic Excavator[J];Construction Machinery and Equipment;2008-09
9 ;Comparison Analysis for Boom Strength of Excavators[J];Construction Machinery and Equipment;2009-07
10 ;Virtual Prototype Simulation Analysis for Main Parts of Excavators[J];Construction Machinery and Equipment;2009-10
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved