Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Journal of Water Resources and Architectural Engineering》 2007-04
Add to Favorite Get Latest Update

Numerical Simulation for Tunnel of Changde-Jishou Express Highway Based on Considering Seepage Effect

TIAN Kun1,HUANG Bing-ren2,WANG Rui1(1.College of Civil Engineering and Mechanics,Xiangtan University,Xiangtan,Hu'nan 411105,China;2.College of Resources and Safety Engineering,Central South University,Changsha,Hu'nan 410083,China)  
Pointing to the Bimaxi twin-arched tunnel of Changde-Jishou Express Highway and by using the FLAC3D software,the three-dimensional numerical analysis for the surrounding rock of the tunnel is carried out under two kinds of conditions of considering and unconsidering the seepage effect of water.And the changes of the stress field and bias field of the surrounding rock of the tunnel under two kinds of conditions and with the staged excavation are obtained as well as the stability analysis of the surrounding rock.The conclusion indicates that the stress of the surrounding rock of the tunnel when considering the seepage effect is lower than that when unconsidering;the vertical displacement of the surrounding rock when considering the seepage effect is much bigger than that when unconsidering,but the difference of the horizontal displacement under two kinds of conditions is a little;and the stability of the surrounding rock when considering the seepage effect is worse than that when unconsidering.The conclusions will provide references for the construction and design of the seepage control of the tunnel.
【Fund】: 湖南省交通科技项目(200516)《山区公路隧道渗流理论与控制技术研究》
【CateGory Index】: U459.2
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Citations】
Chinese Journal Full-text Database 6 Hits
1 WANG Qing hai et al;Numerical Simulation of Rock Deformation and Rock-burst of Tongyu Tunnel[J];Underground Space;2003-03
2 ZHU Wei-shen , SUN Ai-hua , SUI Bin(Research Center for Geotechnical and Structural Engineering, Shandong University, Jinan 250061, China);Systematic Analysis of Underground Cavern Groups in Background for Ertan Project[J];;2005-01
3 SHI Jin-Feng , ZHANG Ying-Long (Northwestern Polytechnical University, Shanxi Xi'an 710072, China);FEM Analysis of Rock Stability on Super Section Tunnel[J];;2005-02
4 ;The Boundary Element Analysis of Surrounding Rock Stability of Analing Tunnel[J];NORTHEASTERN HIGHWAY;1996-02
5 CAI Jia-jun, LI Zhi-da, YI Hui, LIU Jin-yong(College of Transportation, Wuhan University of Technology, Wuhan, Hubei 430063, China);Application of 2D Elasto-plastic Analysis of ANSYS in Stability Evaluation of Surrounding Rock in Twin-arched Tunnel[J];Jorunal of Water Resources and Architectural Engingeering;2005-01
6 Yang Xinan Huang Hongwei (Dept. of Civil Eng., Shanghai Tiedao Univ.) (Dept. of Underground Eng., Tongji Univ.) Ding Quanlu (China Coal Research Institute);FLAC Program and Its Applications in Tunnel Enginneering[J];JOURNAL OF SHANGHAI TIEDAO UNIVERSITY(NATURAL SCIENCE EDITION);1996-04
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 MO Yangchun1,ZHOU Xiaojun1,DENG Yaolin2(1.School of Civil Engineering,Southwest Jiaotong University,Chengdu 610031,China;2.School of Seiences,Southwest Jiaotong University,Chengdu 610031,China);Analysis on mechanical characteristics of surrounding rock and support structures of lateral karst cave tunnel[J];Sichuan Building Science;2009-03
2 Xu Fengfeng,Li Haibo(The First Engineering Co.,Ltd.of CTCE Group,Hefei 230041,China);Application of Oblong Dome to the Opening of Multi-arch Tunnel[J];Anhui Architecture;2007-01
3 Li Laosan,Yang Xiaoli(School of Civil Engineering and Architecture,Central South University,Changsha 410075,China);Dynamic Response Analysis of the Large Cross-section Tunnel under Seismic Load[J];Anhui Architecture;2007-01
4 DENG Shao-jun~1,YANG Jun-sheng~1,ZHANG Xue-min~1,ZHONG Fang-ping~2(1.School of Civil Engineering and Architecture,Central South University,Hunan Changsha 410075 P.R.China;2.Construction and Exploitation Ltd.of Chang-Ji Expressway,Hunan Changde 415100 P.R.China);Numerical Simulation of Construction and Excavating Scheme for Shallow Multi-Arch Tunnel Under Unsymmetrical Pressure[J];Chinese Journal of Underground Space and Engineering;2005-06
5 SHI Ya-xin,WANG Ming-nian,Li Qiang(School of Civil Engineering,Southwest Jiaotong University,Chengdu 610031 China);Proper Selection of the Middle Wall of a Shallow Double-Linked-Arch Tunnel[J];Chinese Journal of Underground Space and Engineering;2005-06
6 LIU Ming-gao,GAO Wen-xue,ZHANG Fei-jin(College of civil engineering,Beijing University of Technology,Beijing 100022,China);Research on Key Construction Technology and Application of Small Interval Tunnel[J];Chinese Journal of Underground Space and Engineering;2005-06
7 MA Xing-dong~(1,2),LI Hai-bo~1,FENG Hai-peng~1(1.Institute of Rock and Soil Mechanics,The Chinese Academy of Sciences,Wuhan 430071,P.R.China;2.Chengdu Hydroelectric Investigation &Design Institute of SPC(CHIDI),Chengdu 610072,P.R.China);Analysis of Dynamic Paramaters for Underground Excavation Under Seismic Loading[J];Chinese Journal of Underground Space and Engineering;2006-01
8 YAN Chun-ling~1,DING De-xing~1,CUI Zhen-dong~2,BI Zhong-wei~2(1.School of Architectural Engineering,Resources and Environment,Nanhua University,Hengyang 421001,P.R.China;2.Key Laboratory of Geotechnical Engineering,Tongji University,Shanghai 200092,P.R.China);Application of FLAC in the Stability Analysis of Tieshanping Tunnel Surrounding Rock[J];Chinese Journal of Underground Space and Engineering;2006-03
9 BI Jun-li,HOU Yong-feng,WANG Wei-feng(Beijing Jiaotong University,Beijing 100044,China);Optimization of Complex Underground Cavity Group Excavation Project[J];Chinese Journal of Underground Space and Engineering;2007-02
10 TANG Mei-fang,GONG Quan-mei(Key Laboratory of Road and Traffic Engineering of the Ministry of Education,Tongji University,Shanghai 200092,China);Study on Subway Station Displacement Affected by Construction of Top-down Additional Floors[J];Chinese Journal of Underground Space and Engineering;2007-02
China Proceedings of conference Full-text Database 10 Hits
1 MA Yu-cheng KONG Ling-qi GUO Zhong-yin (School of Transportation Engineering,Tongji University,Shanghai 200092,China);Safety Operating Speed and Control Measure Based on Lighting Transition to Tunnel Entrance[A];[C];2007
2 ;红粘土浅埋隧道施工沉降分析及处治措施[A];[C];2005
3 (LONG Bai-hua~1 HU Xing~2 HUANG Da-yong~1 WANG Xin-jie~1) (1.Civil & Architectural Engineering Institute,GuiZhou University,Guiyang,China,550003,2.Testing center of Civil & Architectural Engineering Institute,GuiZhou University,Guiyang,China,550003,);NONLINEAR REGRESSION ANALYZE THE STRAIN OF THE ENCLOSING ROCK OF TUNNEL[A];[C];2005
4 Liu Qin Li Shu-cai Xue Yi-guo Zhang Qing-song Zhang Ning (The Research Center of Geotechnical Engineering,Shandong University,Jinan,250061,China);Comprehensive treatment method of gushing water and gushing mud at F_2 fault in over-length highway tunnel[A];[C];2008
5 Ding Wen-qi Xie Dong-wu Cai Yong-chang Wang Xiao-xing Li Zhi-gang (Key Laboratory of Geotechnical Engineering of Ministry of Education;Department of Geotechnical Engineering,Tongji University,Shanghai 200092 P.R.China);Study on the best curvature of temporary support of the core rock pillar of large cross section tunnel[A];[C];2007
6 Xu Yan Ding Wenqi 1.Key Laboratory of Geotechnical and Underground Engineering of Ministry of Education,Department of Geotecnical Engineering,Tongji University,Shanghai 200092,China;Optimization Design of the Section form and Lining of Twin Tunnel and Its Application[A];[C];2008
7 WANG Wei-feng~1,BI Jun-li~2 (1.Beijing Urban Engineering Design and Research Institute,Beijing 100037,China; 2.China Railway Tunnel Survey and Design Institute,Luoyang 471009,China);Construction project optimizing of soft rock and shallow buried tunnel[A];[C];2007
8 SONG Yu-xiang~(1,2),JIA Xiao-yun~2,ZHU Yong-quan~2 (1.Southwest Jiaotong University,Chengdu 610031,China;2.School of Civil Engineering,Shijiazhuang Railway Institute,Shijiazhuang 050043,China);Research on simplified method of multiple structure reliability of metro tunnel[A];[C];2007
9 WANG Shao-qiang~1,QIAO Chun-sheng~2,XU Gan-cheng~3,ZHU Zheng-guo~2 (1.Anhui Provincial Communications Investment Group Co.Ltd.,Hefei 230011,China; 2.School of Civil Engineering and Architecture,Beijing Jiaotong University,Beijing 100044,China; 3.Air Force Engineering Design and Research Bureau,Beijing 100077,China);Deformation and stress distribution of middle-wall for asymmetrically-loaded double-arch tunnel under complicated geological conditions[A];[C];2007
10 TANG Jin-song~(1,2),LIU Song-yu~1,TONG Li-yuan~1,YU Jun~1 (1.College of Transportation,Southeast University,Nanjing 210096,China; 2.School of Civil Engineering,Shijiazhuang Railway Institute,Shijiazhuang 050043,China);Comparative study on tunneling scheme of shallow overburden and large-span highway tunnel in cracked rock mass[A];[C];2007
【Secondary Citations】
Chinese Journal Full-text Database 10 Hits
1 LI Xiaohong et al.[;Intelligent Back Analysis of Tunnel Rock Displacement and Its Application[J];Underground Space;2001-04
2 LEI Sheng xiang et al.;Numerical Analysis of the Construction Scheme for Large-span Exit Section of the Pengshui Tunnel in Chongqing-Huaihua Railway[J];Underground Space;2002-03
3 MA Wan quan et al;Numerical Simulation of Dynamic Emulation on Construction Process in Yangzong Highway Tunnel[J];Underground Space;2003-03
4 Zhou Chuangbin; Xiong Wenlin(Wuhan University of Hydrualic and Electric Engineering, Wuhan 430072);ON PERMEABILITY CHARACTERISTICS OF ROCK MASS[J];JOURNAL OF ENGINEERING GEOLOGY;1996-02
5 BAO Peng, YUE Jian_wei, XU Shu_yao ( Departmet of Civil Enginering, Henan University, Kaifeng 475001, Henan, China );FEM Elastic-Plastic Analysis of the Reconstruction of a Underground Structure[J];Journal of Henan University (Natural Science);2001-03
6 Li Shucai Zhu Weishen Chen Weizhong (Institute of Rock and Soil Mechanics,the Chinese Academy of Sciences,Wuhan);OPTIMIZATION OF CONSTRUCTIONAL SEQUENCE FOR EXCAVATION OF A GROUP OF UNDERGROUND CHAMBERS IN XIAOLANGDI WATER CONSERVANCY PROJECT[J];JOURNAL OF CHINA COAL SOCIETY;1996-04
7 ZHOU Shu ming Survey & Design Institute, Tunnel Engineering Bureau of Ministry of Railways;DISCUSSION ON CALCULATION OF UNDERGROUND WATER IN TUNNEL ENGINEERING WORKS[J];JOURNAL OF RAILWAY ENGINEERING SOCIETY;2000-02
8 Zhang Zhidao(Bridge and Tunnel Dept.,Second Survey and Design Institute of MOR, Chengdu 610031);DISCUSSION ON UNDERGROUND WATER TREATMENTAND STRUCTURE DESIGN OF MOUNTAIN TUNNELS[J];JOURNAL OF RAILWAY ENGINEERING SOCIETY;1995-01
9 Wang jianyu Hu Yuanfang (Southwest Research Institute of CREC, Chengdu 610031);Discussion on Waterproofing in Tunneling[J];Modern Tunnelling Technology;2001-01
10 Zhang Jizuo Li Minzheng Li Yide (Zhongxing Consulting Engineering Shareholding Co. , Ltd. . Taibei);Comparison of the Two Rock Mass Classification Systems Applied in Both Sides of Taiwan Strait[J];Modern Tunnelling Technology;2001-03
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved