Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Iron and Steel》 2004-08
Add to Favorite Get Latest Update

<title>Discussion on Steel Manufacturing Process Optimization and Steel Product Optimization

<author>N Ruiyu (Central Iron and Steel Research Institute, Beijing 100081 )  
abstract is stressed in the paper that Chinese steel enterprises should pay attention to studying the function of steel manufacturing process in the new century. It is pointed out that steel manufacturing process has a board linkage and comprehensive influences on the viability and development of steel plants and structural optimization of manufacturing process is the effective way for enhancing the market competitiveness and developing the social economic functions of steel plants."Flow", "process network" and "program" are the key elements of steel manufacturing process. "Flow" runs dynamically orderly continuously and compactly according to certain "program" in the "process network" and multi-target optimization of steel manufacturing process will be realized.The status and developing direction of production process optimization for Chinese steel enterprises were discussed in the paper and some issues related to steelmaking and rolling technologies in the steel product optimization process were also discussed. Early 20 years of the new century, structural adjustment of steel product in China should concentrate on flat products and deep processing product. At the same time, structural optimization of steel plants will be improved.
【CateGory Index】: F426.3
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【References】
Chinese Journal Full-text Database 1 Hits
1 Liu Xiaobing1 Bo Hongguang1 Ma Yue1 Zhang Jinglei21.Dalian University of Technology,Dalian,Liaoning,1160242.Dongbei Special Steel Group Co.,Ltd.,Dalian,Liaoning,116031;Research on Production Process Planning of Iron and Steel Industries Based on CBR[J];China Mechanical Engineering;2008-18
【Co-references】
Chinese Journal Full-text Database 10 Hits
1 DENG Nan sheng & WU Feng (Department of Environmental Science, Wuhan University, Wuhan 430072, China);RESEARCH SURVEY OF ECO-INDUSTRIAL PARKS IN SEVERAL COUNTRIES[J];Journal of Safety and Environment;2001-04
2 Li Sujian1);Chang Zhiming2)(1) Mechanical Engineering School, UST Beijing, Beijing 100083, China2) Hot Strip Rolling Plant of Wuhan iron & Steel (Group) Crop, Wuhan 430083, China);Facing Contracts Models for Multiple Stages Production Logistics Balance in Iron and Steel Complex[J];JOURNAL OF UNIVERSITY OF SCIENCE AND TECHNOLOGY BEIJING;1999-06
3 WANG Guo hong, NING Ru xin (School of Mechanical Engineering and Automation,Beijing Institute of Technology,Beijing100081,China);The Research on Bill of Material Used in Manufacturing[J];Journal of Beijing Institute of Technology;2001-02
4 YAN Wen-hong LIU Yi-min HUANG Xiang;The changes of urban metabolism and effects of waste creation in Shenzhe,Guangdong province[J];Urban Problems;2003-01
5 LI Qingyu 1,2 ,HUANG Xiaoyuan 1, LIU Xinyu 1,2 (1 School of Business Administration,Northeast University,Shenyang 110004; 2 Baoshan Iron and Steel Co ,Ltd ,Shanghai 201900);STUDY ON PRODUCTION-LOGISTICS MANAGEMENT MODEL FOR IRON AND STEEL ENTERPRISES[J];Iron and Steel;2004-05
6 LIU Liu DU Kun TONG Puqiao ZHENG Congjie(Central Iron and Steel Research Institute);APPROACH TO SLAG SPLASHING ON CONVERTER[J];IRON AND STEEL;1998-06
7 HAN Qinglan GAO Yang CHEN Songqiao (Central South University of Technology);MANAGEMENT PATTERN AND INFORMATION INTEGRATION PROGRAM OF IMPLEMENTING CIMS PROJECT IN IRON AND STEEL ENTERPRISE[J];IRON AND STEEL;1998-10
8 Tang Lixin(Northeast University,Shenyang,China);Intelligent Optimization-based Production Planning and Scheduling in Iron and Steel Industry[J];Chinese Journal of Management;2005-03
9 LI Yourun, SHEN Jingzhu,HU Shanying and CHEN Dingjiang (Department of Chemical Engineering, Tsinghua University, Beijing 100084,China);STUDY AND PROGRESS ON INDUSTRIAL ECOLOGY AND ECO-INDUSTRIAL PARKS[J];Journal of Chemical Industry and Engineering(China);2001-03
10 CHEN Ding-jiang, LI You-run, SHEN Jing-zhu, HU Shan-ying (Department of Chemical Engineering, Tsinghua University, Beijing 100084, China);A MINLP Model of Eco-Industrial Parks[J];The Chinese Journal of Process Engineering;2002-01
China Proceedings of conference Full-text Database 1 Hits
1 Zheng Congjie~1 Yan Zhanhui~2 Tong Puqiao~1 Liu Yu~2 Xie Tongliang~2 Liu Liu~1(1. Central Iron & Steel Research Institute; 2. Beijing Shougang Company Limited);RESEARCH ON THE GAS SUPPLYING CAPACITY OF BOTTOM NOZZLE IN LARGE COMBINED BLOWN CONVERTER AT SHOUGANG[A];[C];2005
【Secondary References】
Chinese Journal Full-text Database 1 Hits
1 BO Hong-guang1,LIU Xiao-bing1,LV Yan-xia2(1.CIMS Centre,Dalian University of Technology,Dalian 116023,China;2.Dalian Port Logistics Technology Co.,Ltd,Dalian 116001,China);Research on xBOM Process Integration in Iron and Steel Enterprise[J];Industrial Engineering and Management;2009-02
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved