Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Port Engineering Technology》 2011-01
Add to Favorite Get Latest Update

Application of Low Vacuum Preloading on Dredger Fill Soft Foundation Consolidation

Fang Zijie1,Ying Shu2(1.Reclamation Technology Center of Zhejiang Province,Hangzhou Zhejiang 310014,China;2.Infrastructure Investment Co.,Ltd.,Economic and Technological Development Zone,Wenzhou Zhejiang 325000,China)  
After reclamation of tidal flat is made,the fenced area is backfilled firstly to elevate the level ground.As the backfilling option is decided,the problems such as the source of backfill material and foundation treatment way should be considered emphatically.The technology of low vacuum preloading on dredger fill soft foundation is the one of relatively mature with the low cost,short construction period and less impact on the surrounding environment and it is convenient to expropriate land in the future.The method is an appropriate choice to consolidate the dredger fill soft foundation in a shorter construction period.
【CateGory Index】: TU472.33
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved