Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Geotechnical Investigation & Surveying》 2012-08
Add to Favorite Get Latest Update

Application of integrated geophysical prospecting method in the leading geological forecast of tunnel faces

Dai Qianwei,Wang Pengfei,Feng Deshan,Zhang Fuqiang(School of Geosciences and Info-Physics,Central South University,Changsha 410083,China)  
The methods of the infrared water exploration,the geological radar and the TSP geological leading forecast are currently used in engineering practice.The method of infrared water exploration is used for evaluating the hydrous case or non-hydrous case in front of the workaround,and the method of geological radar is used for the short distance precise forecast,and the system of the TSP geological leading forecast is used for the long distance forecast.The effective combination of these methods could be proved mutually and improve the accuracy of exploration results.The integrated geophysical prospecting method is the necessary method to ensure the safety of tunnel construction in the leading tunnel geological forecast.The combination of the said three kinds of forecast methods get the precise prediction results in the geological leading forecast of certain tunnel,which provide the effective scientific guidance to the engineering construction.
【CateGory Index】: U452.11
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【References】
Chinese Journal Full-text Database 1 Hits
1 Zhao Hong1,Tang Xiaoqiang2,Niu Fusheng1(1.Department of Geotechnical Engineering,Tongji University,Shanghai 200092,China; 2.Geotechnical Engineering Company,East China Investigation and Design Institute,CNPC,Qingdao 266071,China);Construction technique for weak surrounding rocks in Galongchan Tunnel[J];Geotechnical Investigation & Surveying;2013-06
【Citations】
Chinese Journal Full-text Database 10 Hits
1 DAI Qian-wei, HE Gang, FENG De-shan (School of Info-physics and Geomatics Engineering, Central South University, Changsha 410083, China);Application of the TSP-203 system in geological Advanced prediction of tunnel[J];Progress In Geophysics;2005-02
2 HU Xiang-yun~1,YANG Di-kun~1,LIU Shao-hua~2,HU Zheng-wang~1(1.China Geological University,Wuhan 430074,China;2.Institute of Geology and Geophysics,Chinese Academy of Sciences,Beijing 100029,China);The developing trends of environmental and engineering geophysics[J];Progress in Geophysics;2006-02
3 SONG Xian-hai,GU Han-ming,Xiao bo-xun(Institute of Geophysics and Geomatics,China University of Geosciences,Wuhan 430074,China);Overview of tunnel geological advanced prediction in China[J];Progress in Geophysics;2006-02
4 HE Gang,SHA Chun,DING Cheng-fen,CHEN Bo(Chengdu Hydroelectric Investigation & Design Institute of SPC,Chengdu 610072,China);Investigation on data acquisition application of TSP-203 system[J];Progress in Geophysics;2006-04
5 ZHAO Yong-gui(Institute of Geology and Geophysics,Chinese Academy of Sciences,Beijing 100029,China);Analysis and recommendation of tunnel prediction techniques at home and abroad[J];Progress in Geophysics;2007-04
6 Liu Yingli1),Du Bin1),2)and Li Caiming1)1)Chengdu University of Technology,Sichuan Province 610059,China2)Chengdu Seismic Station,Sichuan Province 611730,China;Applying Study of SIR-3000 ground penetrating radar[J];Seismological and Geomagnetic Observation and Research;2008-01
7 Lu Lixun,Deng Shikun,Ran Mi (Institute of Geophysics & Geomatics,China University of Geosciences,Wuhan 430074,China);The Application of GPR in the Advanced Detection for Tunnel Excavating[J];Chinese Journal of Engineering Geophysics;2010-02
8 Li Dan et al.;Application of TSP203 System in Geological Prediction of Tiefeng Tunnel with High Groundwater Ingression in Chongqing[J];Journal of Geotechnical Investigation & Surveying;2006-05
9 ZHANG Min-qing1,HUANG Hong-jian2,TIAN Si-ming3(1.Scientific Research Institute,China Railway Tunnel Group Co.Ltd.,Luoyang,Henan 471009,China;2.Yichang-Wanzhou Railway Project Headquarter,Engineering Management Centre of Ministry of Railways,Enshi,Hubei 445000,China;3.The Fourth Survey and Design Institute of China Railway,Wuhan,Hubei 430063,China);Safe Design,Construction and Management of Karst Tunnel[J];Journal of Railway Engineering Society;2007-05
10 Dai Qianwei 1, Liu Shaolin 1,Xiao Bin 2 (1.Central South University of Technology,Changsha 410083; 2.Shenzhen Exploration Institute, Shenzhen 518026);A DISCUSSION ON THE APPLIED CONDITION OF GPR[J];GEOPHYSICAL AND GEOCHEMICAL EXPLORATION;2000-02
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 YANG Guo-lin,YANG Li-wei(College of Civil Architectural Engineering,Central South University,Changsha 410075,China);Detection Techniques and Methods of Geological Advanced Prediction in Tunnel Construction[J];Chinese Journal of Underground Space and Engineering;2006-04
2 JIANG Wen-quan1,LIU Ya-ling1,WANG Lin-ping2(1.Huangqu'nan Highway Co.Ltd,Quzhou 324000,China;2.Traffic Bureau of Longyou County,Quzhou 324000,China);Application of Geological Radar in Advance Geological Forecast in Huangqunan Highway Tunnel[J];Chinese Journal of Underground Space and Engineering;2008-04
3 Luo Lirui1,Liu Zhigang2,Chen Wentao3,Geng Yansheng4 (1.Central Research Institute of Building and Construction Co.,Ltd.,MCC Group,Beijing 100088,China;2.Shijiazhuang Railway Institute,Shijiazhuang 050043,China;3.MCC Huaye Resources Development Company,Beijing 100176,China;4.MCC Communication Engineering Technology Co.,Ltd,Beijing 100176,China);Application of Infrared Acquisition Technology in Geological Prediction of Sub-sea Tunnel[J];Chinese Journal of Underground Space and Engineering;2010-04
4 ZOU Ai-min~a,b,CHENG De-fu~a,b,WANG Ke-ke~a,b,ZHAO Fei~a,b(a.College of Instrumentation and Electrical Engneering;b.Key Laboratory of Geo-Exploration and Instrumentation of Education Ministry,Jilin University,Changchun 130026,China);Pulser Design in GPR for Tunnel Geology Forecast[J];Journal of Jilin University(Information Science Edition);2008-05
5 ZHOU Li-ming1,2,LIU Jiang-ping1,LIU Tian-you1,XIAO Guo-qiang2;LI Yun-dong3(1.Institute of Geophysics & Geomatics,China University of Geosciences,Wuhan 430074,China;2.Key Laboratory of Geotechnical Mechanics and Engineering of the Ministry of Water Resources,Yangtze Scientific Research Institute,Wuhan 430010,China;3.Changjiang Institule of Survey,Planning,Design and Research,Wuhan 430010,China);Application of Integrated Geophysical Method of Advanced Detection for Complex Tunnel Geological Defect[J];Journal of Yangtze River Scientific Research Institute;2008-05
6 Wang Xutao{1,2)},Ren Kuanlin{3)} and Hu Jian{1,2)}1)Institute of Seismology,CEA,Wuhan 4300712)Wuhan Institute of Earthquake Engneering,Wuhan 4300713)The Nonmetal Geological Corporation of Hubei Province,Wuhan 430030;APPLICATION OF TSP203 IN GEOLOGICAL ADVANCED FORECAST IN A CERTAIN TUNNEL OF A HIGH WAY[J];Journal of Geodesy and Geodynamics;2011-S1
7 WU Xiao-ping,HE Ji-shan,LIU Jian-xin(School of Info-Physics and Geomatics Engineering,Central South University,Changsha 410083,P.R.China);The effect of the electromagnetic wave's impedance transform to the results of the ground-probing-radar[J];Progress in Geophysics;2006-01
8 SONG Xian-hai,GU Han-ming,Xiao bo-xun(Institute of Geophysics and Geomatics,China University of Geosciences,Wuhan 430074,China);Overview of tunnel geological advanced prediction in China[J];Progress in Geophysics;2006-02
9 WANG Qi-ren~(1,2),YANG Tian-chun~2(1.School of Info-Physics and Geomatics Engineering,Central South University, Changsha 410083,China;2.School of Civil Engineering,Hunan University of Science and Technology,Xiangtan 411201,China);The seismic reflection method predicting tunnel geological hazards[J];Progress in Geophysics;2006-02
10 SHI Ming,FENG De-shan,DAI Qian-wei(1.Faculty of Land Resource Engineering Kunming,University of Science and Technology,Kunming 650093,China;2.Nonferrous Metals Geophysical and Geochemical Prospecting Team of Guizhou Province,Duyun 558004,China;3.School of Info-Physics and Geometrics Engineering,Central South University,Changsha 410083,China);Application of integrated geophysical method in quality detection of dikes[J];Progress in Geophysics;2006-04
China Proceedings of conference Full-text Database 10 Hits
1 Chen Fenl,Huang Cheng2,Ding Xindongl (1.Taizhou University School of civil Engineering and Architecture,Zhejiang Taizhou 318000; 2.Taizhou water conservancy and hydropower construction Co.,LTD,Zhejiang Taizhou 318000;);A kind of comprehensive evaluation model for the hydraulic tunnel prediction[A];[C];2011
2 LI Yinian1, WANG Guobin1,2 (1.Communications Planning & Design Institute of Hubei Province, Wuhan 430051, China; 2. School of Engineering, China university of Geosciences, Wuhan 430074, China);TRT Tunnel Geological Prediction System Improvement and Optimization[A];[C];2009
3 WANG Shuguo1, ZHANG Minqing1, XI Jihong2 (1.Yiwan Railway Department of China Railway Ministry, Enshi, 445000, China; 2. Yiwan Railway Department of China Railway 12th bureau group CO.LTD, LiChuan 445400, China);Construction Safety Risk Appraise and Construction Measure of Long-large Karst Tunnels[A];[C];2009
4 LI Yinian,WANG Guobin (Communications Planning & Design Institute of Hubei Province,Wuhan 430051,Hubei,China);TRT Tunnel Geological Prediction System Improvement and Optimization[A];[C];2009
5 CHEN Fa-yu,SHANG Yong-sheng,YANG Chang-chun (Institute of Geology and Geophysics,Chinese academy of Sciences,Beijing 100029,China);A general description of matching pursuits decomposition method[A];[C];2008
6 XUE Guo-Qiang~1,LI Xiu~2,DI Qing-Yun~1 (1.Institute of Geology and Geophysics,Chinese Academy of science,Beijing,100029,China; 2.School of Geology and Survey Engineering,Changan University,Xi'an 710054,China);Research progress in TEM forward modeling and inversion calculation[A];[C];2009
7 XUE Guo-Qiang~1,LI Xiu~2 1 Institute of Geology and Geophysics,Chinese Academy of Sciences,Beijing 100029,China 2 School of Geology and Survey Engineering,Changan University,Xi an 710054,China;The technology of TEM tunnel prediction imaging[A];[C];2009
8 XIONG Wei~①GAO Qian~②WU Yongbo~②SONG Jianguo~②(①China Ubiversity of mining & Technology,Beijing 100083)(②University of Science and Technology,Beijing 100083);RESEARCH AND DEVELOPMENT ON FORECAST THEORY AND PREDICTING OF GEOLOGIC DISASTER FOR UNDERGROUND ENGINEERING[A];[C];2007
9 XU Songyan~1,GE Rubing~2 (1.Geological Construction Engineering Group Corporation of Guangdong Province,Guangzhou 510080;2. Guangzhou Urban Planning & Design Survey Research Institute,Guangzhou 510060,China);Application of Geophysical Technique to Retaining Wall Testing[A];[C];2009
10 LU Qi-hu, PENG Ke-zhong, YI Bi-jin(The Geophysical Technology Committee, Chinese Geophysical SocietyBeijing 100080, China );The development of geophysical instrumentation in China[A];[C];2007
【Co-references】
Chinese Journal Full-text Database 10 Hits
1 XU Lin sheng SUN Jun (Institute of Geotechnical Engineering in Tongji University,Shanghai 200092,China) JIANG Shu ping (Chongqing Institute of Highway Science,CHongqing 400067,China);NUMERICAL SIMULATION OF DYNAMIC EMULATION ON CRD CONSTRUCTION PROCESS IN YANGPENG TUNNEL[J];Journal of Geological Hazards and Environment Preservation;2001-01
2 XU Wen-feng1,2,ZHANG Feng2,CHEN Jian-ping2 (1.Third Institute of Oceanography,State Ocean Administration,Xiamen 361005,China;2.China University of Geosciences(Wuhan),Wuhan 430074,China);Optimization Study on CRD Method for a Large-Span Loess Tunnel[J];Journal of Disaster Prevention and Mitigation Engineering;2009-05
3 Gao Panke1,2,Mao Hongmei1,Song Xiuqing1,Wu Hengbin3,Guo Jinxin4(1.Shannxi Railway Institute,Weinan 714000,China;2.Chang' an University Highway Institute, Xi' an 710064,China;3.Iinstitute of Mountain Hazards and Environment,CAS,Chengdu 610041,China; 4.China railway NO.5(group)LIT,Gui Yang 550003,China);Dynamic construction mechanics analysis of small-distance tunnel in soft and weak rocks[J];Geotechnical Investigation & Surveying;2012-05
4 Zhang Guannan,Zhou Jianchun(School of Civil Engineering and Transportation,South China University of Technology,Guangzhou 510640,China);Application of GPT of tunnel geological prediction in Maliushan Tunnel[J];Geotechnical Investigation & Surveying;2012-12
5 ZHANG Dingbang ZHOU Bin (School of Civil Engineering,Huangshi Institute of Technology,Huangshi Hubei 435003);Comparative Analysis on Internal Force for Excavating Super Shallow Tunnel by CRD Four Steps Method and Six Steps Method[J];Journal of Huangshi Institute of Technology;2011-05
6 WANG Wei-ming1,HUANG Ming-qi1,2,WU Ke-xin1(1.College of Civil Eng.and Architecture,SUST,Qingdao,Shandong 266510,China;2.Dept.of Xiamen Xiangan Submarine Tunnel Project,China Railway 22nd Bureau Group Co.Ltd.,Xiamen,Fujian 361102,China);The Numerical Analysis of Construction with CRD Method in Xiamen Xiangan Submarine Tunnel[J];Journal of Shandong University of Science and Technology(Natural Science);2007-02
7 Zhao Zhiyan Zhang Yupeng (The 1th Engineering Co.,Ltd.of the 18th Engineering Group Co.,Ltd.of China Railway Zhuozhou Hebei 072750 China);The Comparative Analysis of the Method of CRD and Double-side Drift[J];Journal of Shijiazhuang Institute of Railway Technology;2008-S1
8 ZHANG Jianguo,WANG Mingnian,LIU Dagang,WEI Longhai,YU Shangyu (School of Civil Engineering,Southwest Jiaotong University,Chengdu,Sichuan 610031,China);COMPARISON OF DIFFERENT WORKING PROCEDURES BY CRD METHOD FOR SHALLOW-BURIED SUBSEA TUNNEL EXCAVATION[J];Chinese Journal of Rock Mechanics and Engineering;2007-S2
9 HUANG Mingqi1,2,FU Xianlun2,LI Yunchao2 (1. College of Civil Engineering and Architecture,Shandong University of Science and Technology,Qingdao,Shandong 266510, China;2. Xiang′an Subsea Tunnel Project in Xiamen,China Railway 22th Bureau Group Co.,Ltd.,Xiamen,Fujian 361102,China);STUDY ON STABILITY CONTROL OF LARGE-SECTION SUBSEA TUNNELS IN WEAK STRATA BY CRD CONSTRUCTION METHOD[J];Chinese Journal of Rock Mechanics and Engineering;2007-S2
10 GUO Yanjing1,HUANG Mingqi2,CHEN Tielin3,ZHANG Dingli3(1.College of Natural Resources and Environmental Engineering,Shandong University ofScience and Technology,Qingdao Shandong 266510,China;2.College of Civil Engineering and Architecture,Shandong University ofScience and Technology,Qingdao Shandong 266510,China;3.School of Civil Engineering and Architecture,Beijing Jiaotong University,Beijing 100044,China);Comparative Analysis on the Adaptability of CRD and Dual Sidewall Guide Pit for Passing through the Sand Layer of Xiamen Xiangan Seabed Tunnel[J];China Railway Science;2009-02
【Secondary Citations】
Chinese Journal Full-text Database 10 Hits
1 Zhao Yonggui1, Jiang Hui1, and Zhao Xiaopeng11. Institute of Geology and Geophysics, Chinese Academy of Sciences.;Tunnel seismic tomography method for geological prediction and its application[J];应用地球物理(英文版);2006-02
2 XUE Jian, ZENG Zhao_fa, WANG Zhe_jiang, TIAN Gang (Changchun University of Science and Technology, Changchun 130026,China);PREDICTION OF ROCK STRUCTURE IN FRONT OF FACE DURING TUNNELING[J];JOURNAL OF CHANGCHUN UNIVERSITY OF SCIENCE AND TECHNOLOGY;2000-01
3 HUANG Run qiu 1, GOU Ding cai 2, QU Ke 2, XU Mo 1, XU Ze min 1 (1.Chengdu University of Technology, China; 2.Survey and Design Institute of Railways, China);ASSESSMENT AND PREDICTION OF GEOHAZARDS OF THE DEEP-LYING LONG TUNNEL IN THE YUANLIANGSHAN[J];Journal of Chengdu University of Technology;2001-02
4 GOU Ding cai 1, WANG Ke 1, HUANG Run qiu 2, QU Ke 1, HAN Kang 2, YANG Hong bing 1 (1.No.2 Survey and Design Institute of Railways, Chengdu, China; 2.Chengdu University of Technology);DISTRIBUTING CHARACTER AND DISPOSING PRINCIPLE OF GEOLOGIC HAZARDS ALONG CHONGQING-HUAIHUA RAILROAD[J];Journal of Chengdu University of Technology;2001-02
5 Deng Shikun (China University of Geosciences, Wuhan 430074);APPLICATION OF KIRCHHOFF INTEGRAL MIGRATION METHOD TO PROCESSING GPR IMAGE[J];;1993-03
6 ZENG Xiao feng,XU Wei jin,QIAN Rong yi,DENG Xin sheng (China University of Geoscience(Beijing),Beijing 100083,China);GROUD PENETRA TING RADAR HIGH RESOLUTION EXPLORATION RESERVOIR DAM STRCTURE LAYER[J];Progress In Geophysics;2000-04
7 WANG Hui 1 CHANG Xu 2 GAO Feng 3 (1. Beijing University of Science Technology, Beijing 100083, China; 2. Institute of Geology and Geophysics, Chinese Academy of Sciences, Beijing 100101, China; 3. Rongcheng Land Supervision Burea;SEVERAL METHODS OF CROSSWELL SEISMIC ATTENUATION TOMOGRAPHY[J];Progress In Geophysics;2001-01
8 CHEN Shu min 1, SONG Yong zhong 2, NIU Yan liang 2 (1. Jilin University, Changchun, 130026, China; 2. Exploration & Development Research Institute of Daqing Oil Field Corporation, Daqing, 163712, China);A STUDY ON THE ABSORPTION CHARACTERISTCS OF ROCKS AND THE RULE OF WAVE ATTENUATION IN SONGLIAO BASIN[J];Progress In Geophysics;2001-04
9 YANG Jian-guang L Shao-lin (College of Resources, Environment and Civil Engineering, Central South University, Changsha, 410083);The Technology of Digital Signal Processing and Application in GPR[J];Progress In Geophysics;2002-01
10 ZHAO Yong gui (Institute of geology and geophysics, Chinese Academy of Sciences, Beijing 100101, China);The Present Situation and Future of Engineering Geophysics in China[J];Progress In Geophysics;2002-02
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved