Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Chinese Journal of Engineering Mathematics》 2002-S1
Add to Favorite Get Latest Update

Study on the Scheduling Problem

DONG Qiang, LIU Chao hui, MA Yi Instructor: WU Meng da (National University of Defence Technology, ChangSha 410073)  
As it's a vehicle scheduling problem with soft time windows, we established two multiple objective programming models to satisfy different practical conditions: double parking lot model and single parking lot model. The main objective of the former was to match the capacity of passengers holding with the real demand, while the objective of the latter was to minimize the average inconvenience of passengers and the cost of transit companies. Both of the two models considered for benefits of both passengers and companies. By using the method of step by step time, we simulated the practical procedure and drew two dispatching plans: static dispatching and dynamic dispatching.
【CateGory Index】: O221
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved