Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Systems Engineering》 1999-02
Add to Favorite Get Latest Update

A Branch and Bound Method For Problem Of Limited Resources and Shortest Time Limit For A Project

Liu Ming Wu Huanqun  
In this pater, the problem of limited resources and shortest time limit for a project is studied and an algorithm of branch and bound method for this problem is proposed.
【CateGory Index】: O221
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【References】
Chinese Journal Full-text Database 5 Hits
1 WANG Zu-zhu~(1,2), CHENG Jia-xing~1 ing & Signal Processing, Anhui University,Hefei230039,China;2.Management School,Anhui University,Hefei230039,China);An algorithm on solving combinatorial optimization problems——branch-and-bound method[J];Journal of Anhui University(Natural Sciences);2004-01
2 Liu Kun Yan Gangfeng;A hybrid strategy genetic algorithm approach to a general schedule problem of resources constrained and shortest time limit[J];Systems Engineering;2000-06
3 JIN Peng(State Key Lab.of Water Resource and Hydropower Eng.Sci.,Wuhan Univ.,Wuhan 430072,China)HU Zhigen LIU Quan;Analysis of Network Scheduling Optimization Technique Based on Construction Simulation[J];Water Resources and Power;2006-03
4 WANG Zhuo fu, et al(College of International Industry and Commerce, Hohai Univ., Nanjing 210098, China);A Review of Construction Schedule for Hydropower projects[J];Advances In Science and Technology of Water Resources;2001-03
5 YAN Gang-feng, MENG Jun, LIU Kun (College of Electrical Engineering, Zhejiang University, Hangzhou 310027, China);A Hybrid Partheno-Genetic Algorithm Approach to a General Resource-Time Optimization Problem[J];Systems Engineering-theory & Practice;2001-11
【Citations】
Chinese Journal Full-text Database 1 Hits
1 Shi Tao;The Research on the Resource Limited and the Shortest Construction Period Problem in Storable Condition[J];Systems Engineering;1998-06
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 Yue Yuxi (Fuyang Institute of Architectural Design and research,Fuyang,236001) Wang Shenglan (Anhui Institute of Traffic Science and Research,Hefei,230001);RESOURCE OPTIMIZATION OF NET-PLANNING TECHNIQUE AND ITS APPLICATION IN ENGINEERING[J];JOURNAL OF ANHUI INSTITUTE OF ARCHITECTURE;2000-04
2 Sun Zhen(Dept. I of Civil Engineering, Beijing 100044);A New Method of Resource Leveling For the Project With Fixed Completion Time[J];JOURNAL OF BEIJING INSTITUTE OF CIVIL ENGINEERING AND ARCHITECTURE;1998-02
3 Zhao Yanlong, Ming Lei;Summarization of Construction Project Network Planning Optimization[J];Urban Roads Bridges & Flood Control;2007-01
4 Pan WenJun(Shenzhen Investigation & Research Institute Co.,LTD,Shenzhen 518026,China);The Discussion of Survey and Mapping in the City Major Infrastructure Projects[J];Urban Geotechnical Investigation & Surveying;2008-03
5 CHENG Peng-jun, LI Hai-yan;Comprehensive optimization method of hydro project[J];Water Resources & Hydropower of Northeast China;2009-04
6 Shi Tao;The Research on the Resource Limited and the Shortest Construction Period Problem in Storable Condition[J];Systems Engineering;1998-06
7 Lu Wenxue (The Management College, Tianjin University, Tianjin 300072);Construction Progress Supervision[J];;1998-02
8 Yang Yue; Zhang Ruihua;Compared Graph of the Practical Speed and the Planned Speed[J];JOURNAL OF HARBIN UNIVERSITY OF CIVIL ENGINEERING AND ARCHITECTURE;1996-01
9 CHEN Chang_bing (Anhui Vocational and Technical College of Water Resource and Hydro_electric Engineering,Hefei230601,Anhui,China);Resource Optimization of Network Technique and the Application in the Project[J];Journal of Yellow River Conservancy Technical Institute;2002-02
10 Zhang Yunbo (Dept. of Civil Eng., Huaqiao Univ., 362011, Quanzhou, China);Reasons for the Delay of Construction Period in Engineering Projects[J];Journal of Huaqiao University(Natural Science);2003-04
【Co-references】
Chinese Journal Full-text Database 10 Hits
1 Wu Xiaopei(Anhui University Hefei 230039) Fei Qinyun(Electronic Technology Research Institute of Hefei);An Efficient Way to Improve the Learning Speed of BP Algorithm[J];JOURNAL OF ANHUI UNIVERSITY(NATURAL SCIENCES);1998-03
2 Pan Wenyan\ \ Du Duanfu (Beijing University of Aeronautics and Astronautics,School of Management);SCHEDULE OPTIMIZING MODEL AND ITS SOLUTION[J];JOURNAL OF BEIJING UNIVERSITY OF AERONAUTICS AND ASTRONAUTICS;1997-03
3 Li Junqi (Dept.of Urban Construction Engineering, Beijing 100044);Study of Large Network Plan Time-cost Optimization[J];Journal of Beijing Institute of Civil Engineering and Architecture;1996-03
4 Li Junqi (Dept. of Urban Construction Engineering, Beijing 100044);Activity-on-node and Multi-dependency Network Plan Time-cost Optimization[J];JOURNAL OF BEIJING INSTITUTE OF CIVIL ENGINEERING AND ARCHITECTURE;1999-02
5 Ji jie (Beijing Institute of Civil Engineerig and Architecture, Beijing 100044)Hu Changshun (Xi'an Highway University, xi'an 710064);The Heuristic Algorithms of Resource optimization in Highwoy Construction Organization[J];JOURNAL OF BEIJING INSTITUTE OF CIVIL ENGINEERING AND ARCHITECTURE;1999-02
6 Wang Guobiao; Yan Manhong; Yang Lifu,Ma Zhu(Resources Engineering School,UST Beijing,Beijing 100083,China)(Xuzhou Loading Machinery Factory,Xuzhou,221006);Optimum Design and Results Visualizationof Structural Parameters of Loader Bucket[J];JOURNAL OF UNIVERSITY OF SCIENCE AND TECHNOLOGY BEIJING;1999-01
7 SONG Jin-he (Dept. of Electronics and Information, Ezhou University,Ezhou 436000,China);Dealing with scheduling issue using simulated anneal algorithm[J];Journal of Changchun Institute of Technology;2004-01
8 Han Guojian. Guo Dazhi Jin. Xuelin(China Universitg of Mining and Technology);STORAGE AND INDEXING OF OREBODYINFORMATION USING OCTREES[J];Acta Geodaetica Et Cartographic Sinica;1992-01
9 Guo Dazhi. Yang Weiping. Han Guojian(China University of Mining and Technology);A SPATIAL AND TEMPORAL 4-D DATAMODEL FOR MINE GIS[J];Acta Geodaetica Et Cartographic Sinica;1993-01
10 CHENG Peng-gen 1,2,GONG Jian-ya1 (1.Wuhan Technical University of surveying and Mapping Wuhan 430079,China; 2. Department of surveying, East China Geologic Institute,Linchuan 344000,China);Design of Three-Dimensional Spatial Data Model and Its Data Structure in Geological Exploration Engineering[J];Acta Geodaetica Et Cartographic Sinica;2001-01
【Secondary References】
Chinese Journal Full-text Database 10 Hits
1 LUO Xiao-bin,YANG Rong-hao,DENG Hu-cheng(School of Computer Science & Comm. Engineering, SWJTU, Chengdu 610031, China);A model of freight distribution with time window and its software realization[J];Journal of Chengdu University of Information Technology;2005-02
2 GUAN Lin,BAI Yan-ping (School of Science,North University of China,Taiyuan 030051,China);A Branch and Bound Algorithm for Traveling Salesman Problem[J];Journal of North University of China(Natural Science Edition);2007-02
3 ZHANG Kai,ZHAO Guo-rong (Department of Control Engineering,NAAU,Yantai Shangdong 264001,China);Particle Swarm Optimization and its Application in Unlimited Resource Leveling of Network Plan[J];Journal of Naval Aeronautical and Astronautical University;2008-01
4 SUN Ming-tao, CAO Qing-kui (Economics and Management Department, Hebei Institute of Architectural Science & Technology, Handan 056038, china);Based on Genetic Algorithm Supply Chain Corporation Order Scheme Optimization[J];Journal of Hebei Institute of Architectural Science and Technology;2004-02
5 WU Qiong1,CHENG Yun-bo2,ZENG Guang-ping1(1.School of Information Engineering,University of Science and Technology Beijing,Beijing 100083;2.Beijing AbitCool Network Technology Ltd.Inc.,Beijing 100016);Solution of Large-scale Integer Programming Problem in Business Process Management[J];Computer Engineering;2008-15
6 XU Xiaohao ZANG Zhiheng(Civil Aviation University of China,Tianjin 300300,China);Optimization for Aircraft Taxi Scheduling Based on MILP[J];Computer and Communications;2007-02
7 Fu Hong;Jia Rongyan;Wang Xia;Xu Tianbai(①Shijiazhuang Railway Institute, Shijiazhuang 050043, China; ②Hebei University of Science & Technologh, Shijiazhuang 050018, China; ③Shijiazhuang Institute of Railway Engineering, Shijiazhuang 050041, China);The Application of Improved PERT on Risk Analysis in Project Schedule[J];Value Engineering;2005-08
8 Liu Wu;Du Zhida;Zhang Qiuyue(School of Civil and Hydraulic Engineering,Dalian University of Technology,Dalian 116023,China);To Study on Dynamic Risk Analysis of Constructing Project Schedule[J];Value Engineering;2008-03
9 ZHANG Yang, JIANG Gen-mou;The Optimization of the Schedule of Resource-constrained Project Based on GA (Genetic Algorithm)[J];Sci-Tech Information Development & Economy;2008-30
10 QIN Ping-ping,LIU Wen,WANG Xing-hua(College of Science, Yanshan University,Qinhuangdao 066004,P.R.China);Branch and Bound Algorithm for Optimization of One-dimensional Cutting Stock Problems[J];Science Technology and Engineering;2008-11
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved