Influence of Peaking Operation on NG-M701F-R Waste Heat Boiler Equipment

LAI Xin-hua(Shenzhen Guangqian Electric Power Co.,Ltd.,Shenzhen,Guangdong 518054,China)  
Problems with related reasons of the waste heat boiler equipment that frequently occur after M701F gas turbine unit involving in peaking operation of the grid are analyzed.Suggestions for improving precautionary measures for security situation of the waste heat boiler equipment and optimizing peaking mode of units are put forward,which have well solved problems above.
【CateGory Index】: TK229.929
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Citations】
Chinese Journal Full-text Database 4 Hits
1 GUO Lu-yang~1,XU Hua-bo~2(1.Shandong Institute of Electric Power,Jinan 250002,China;2.Shandong Huangtai Power Plant,Jinan 250100,China);Influence of Cyclic Operation of Large Generating Sets on High Temperature Corrosion of Water-Wall Tubes[J];Power Equipment;2006-04
2 CHEN Li~1,CHEN Ge-huan~2(1.College of Electric Engineering,Wuhan Univ.,Wuhan,Hubei,430072,China;2.Guangdong Electric Power Design Inst.,Guangzhou 510600,China);Establishment of peaking power sources in electric network[J];Guangdong Electric Power;2005-10
3 YE sheng1,PENG Xian-gang1,ZHOU Ke2,ZHANG Cong-hui1(1.Dept.of Electric Power Engineering,Fac.of Automation,Guangdong Univ.of Technology,Guangzhou,Guangdong 510006,China;2.Guangdong Huizhou LNG Power Co.,Ltd.,Huizhou,Guangdong 516082,China);Economic Analysis of Peaking Operation of Liquefied Natural Gas Combined-cycle Power Plant[J];Guangdong Electric Power;2009-09
4 ;Safety Analysis on Peak Adjustment Operation of Domestic 200 MW Units[J];Inner Mongolia Electric Power;2003-06
【Co-citations】
Chinese Journal Full-text Database 1 Hits
1 ZHU Xian-ran, ZHANG Qing-feng, ZHAO Zhen-ning (North China Electric Power Research Institute Co.,Ltd.,Beijing 100045,China);Start-up and peaking characteristics of a 700 MW-class combined gas-steam cycle unit with multi-shaft arrangement[J];Electric Power;2009-06
【Secondary Citations】
Chinese Journal Full-text Database 6 Hits
1 WU Yun-sheng ZHONG Wen JIANG Ye-qing (College of Management,Changsha Polytechnic University,Changsha,Hunan 410077);Analysis and Study on Current Status of Peak and Off Peak Electricity Tariff and Their Development Trends[J];Electric Power Technologic Economics;2005-02
2 LIAO Yong-jin1, WANG Li1, LUO Wen-bo2 (1. Guangdong Power Technology Research Institute of Guangdong Grid Company, Guangzhou 510600, China; 2. Guangdong Yudian Group Co. Ltd., Guangzhou 510630, China);Cost Research of Thermal Power Plant FGD System[J];Electric Power Construction;2007-04
3 YE Fa ming (Shajiao A Power Station, Dongguan, Guangdong 523936, China);Generation cost analysis of coal-fired power station in market economy situation[J];Guangdong Electric Power;2002-05
4 WEI Xue-Hao, ZHOU Hao (Zhejiang University,Hangzhou 310027,China);Evaluating the Environmental Value Schedule of Pollutants Mitigated in China Thermal Power Industry[J];Research of Environmental Sciences;2003-01
5 ;The Analysis of High Temperature Corrosion Causes on 1000 t/h Boiler Water - wall Tubes[J];Shandong Electric Power;1996-05
6 Zhao Juan,Tan Zhongfu,Li Qiang (Institute of Electricity Economics, North China Electric Power University, Beijing102206, China);Analysis of Time-of-Use(TOU)Power Price in China[J];Modern Electric Power;2005-02
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved