Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Guangdong Highway Communications》 2007-01
Add to Favorite Get Latest Update

Stress Analysis of The Cable Tower Anchorage Zone of Cha He Cable-Stayed Bridge In ShanDong Province

ZHOU Li-Ping(GuangDong Provincial Highway Construction Company GuangZhou City 510600)  
Using large-scale finite element analysis software ANSYS,the PC box tower was analysised.Adopting concret element SOLID65 and bar element LINK8,the tower and the prestresing force cable were simulated.According to real structure shape,the model of anchorage zone was created and according to the real work condition of the tower,the stress value of characteristic points were obtained.All the result were valuable to the design and construction.
【CateGory Index】: U443.37
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【References】
Chinese Journal Full-text Database 2 Hits
1 Mei Shilonga,b Zhang Yaotinga,b Zhu Hongpinga,b Xiao Fenga(a College of Civil Engineering and Mechanics;b Hubei Key Laboratory of ControlStructure,Huazhong University of Science and Technology,Wuhan 430074,China);Full-scale model test of the anchorage zone on Malinghe Super-bridge[J];Journal of Huazhong University of Science and Technology(Nature Science Edition);2009-12
2 LU Zhi-qiang1,CHEN Song2(1.Kunming Survey and Design Institute,China Railway Eryuan Engineering Group Co.,Ltd,Kunming 650200,China; 2.Survey and Design Institute,China Railway NO.2 Engineering Group Co.,Ltd.,Chengdu 610031,China);Calculation and Comparison on Arrangement Plan of Annular Prestressed Tendon in Cable Tower of Cable Stayed Bridge with Long Span in Railway[J];Railway Standard Design;2012-04
【Citations】
Chinese Journal Full-text Database 1 Hits
1 SHAO Xu dong 1, ZENG Tian sheng 2, LI Li feng 1,PENG Wang hu 1 (1 School of Civil Engineering,Hunan University, Changsha 410082, China; 2 Guangdong Highway Construction Company, Guangzhou 510620, China);Study of optimal arrangement of prestressed tendonsin pylon for cable-stayed bridge[J];China Journal of Highway and Transport;2001-02
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 LIU Shi-tong(Headquarter of Expressway Construction of Jiangsu Province,Nanjing 210004,China);Test and Study on Tension Control of Ring Tendons in Wuhekou Cable-stayed Bridge Tower[J];Highway;2006-05
2 YU Bao-chu,ZHANG Zhe,ZHANG Hong-jin(Institute of Bridge Engineering Dalian University of Technology,LiaoningDalian,116023,China);Design Tech and Research Analysis on Straight Prestress Strengthening of Main Tower of Jin Ma Bridge[J];Journal of Highway and Transportation Research and Development;2005-05
3 TANG Hong-yuan,MENG Shao-ping,LIU Zhao(Key Laboratory for R C & P C Structure of Ministry of Education,Southeast University,Jiangsu Nanjing 210096,China);Experimental Study on Tension Control of Double U Tendons in Anchorage Zone of Cable-stayed Bridge Pylon[J];Journal of Highway and Transportation Research and Development;2006-01
4 JIN Wen-cheng,ZHANG Xiao-fei,JIAN Fang-liang,ZHOU Xiao-yong(School of Civil Engineering & Mechanics,Huazhong Universityof Scienceand Technology,Hubei Wuhan 430074,China);Spatial Stress Analysis of the Cable Anchorage Zone of Cable-stayed Bridge[J];Journal of Highway and Transportation Research and Development;2007-09
5 LIU Zhaofeng1,MENG Xin2,ZHAO Renda1,YANG Yongqing1 (1.School of Civil Engineering,Southwest Jiaotong University,Chengdu Sichuan 610031,China; 2.China Academy of Railway Sciences,Beijing 100081,China);Full-scale Model Test for Pylon Segment of Changshou Yangtse River Highway Bridge[J];Journal of Highway and Transportation Research and Development;2009-08
6 ZHANG Hailong1,LIN Zhisheng2;Analysis of Local Stress of Anchor Pulling Plate in Stay Cables[J];Technology of Highway and Transport;2010-02
7 HAO Cui1,WANG Jian-guo2,CAO Xin-lei2(1.Anhui Provincial Transport Planning,Design and Research Institute,Hefei 230088,China;2.Schoolof Civil and Water Conservancy Engineering,Hefei University of Technology,Hefei 230009,China);Stress Analysis of Segments of Prestressed Cable-to-Pylon Anchor Zone of an Arch Pylon Cable-Stayed Bridge[J];World Bridges;2010-04
8 WANG Hong-xiang;China Railway 18th Bureau Group Co. ,Ltd.;;Pre-stressing Effect Analysis in Cable-tower Anchorage Zone of Cable-stayed Bridge[J];Journal of Water Resources and Architectural Engineering;2014-03
9 HAN Fuqing,YANG Chengbin,LOU Jian,YANG Jianya(School of Civil Engineering, Hefei University of Technology, Hefei 230009, China);Mechanical analysis of anchorage area of cable support tower of Anqing Changjiang Highway Bridge[J];Journal of Hefei University of Technology(Natural Science);2002-06
10 HAO Cui1,WANG Jian-guo2,CAO Xin-lei2 (1.Anhui Communications Consulting and Design Institute,Hefei 230088,China;2.School of Civil and Hydraulic Engineering,Hefei University of Technology,Hefei 230009,China);Stress analysis of cable-pylon anchorage zones of an arch-tower cable-stayed bridge[J];Journal of Hefei University of Technology(Natural Science);2011-05
【Co-references】
Chinese Journal Full-text Database 10 Hits
1 WANG Tian-you, SU Xiao-zu (Tongji University,Shanghai200092,China);The method and status quo of designing and calculating by strut-and-tie model in reinforced concrete structures[J];Building Science Research of Sichuan;2004-03
2 CHANG Guo-qiang,WU Bo,LIU Kang,ZHANG Feng(Department of Bridge Engineering,Chongqing Communications Research & Design Institute,Chongqing 400067,China);Discussion on Non-uniformity of U-Looped Prestressing Tendons Elongation at Tower Anchorage Zone[J];Journal of Chongqing Jiaotong University(Natural Science);2009-05
3 Wei Hua,Li Xiaogang,Jiang Yingchong,Wei Zhong;Analyses on Force Transmission Route and Stresses in Cable-Pylon Anchorage Zone of Huangdun Bridge[J];Urban Roads Bridges & Flood Control;2009-12
4 Wang Xin Lü Zhitao (College of Civil Engineering,Southeast University,Nanjing 210096,China);Analysis of load transferring and distribution in anchorage zone of steel-concrete composite pylon under inclined cable forces[J];Journal of Southeast University(Natural Science Edition);2006-04
5 Liu Zhao, Meng Shaoping, Lü Zhitao (Key Lab of RC &PC Structures of Ministry of Education, Southeast University, Nanjing\ 210096, China);Model Tests and Comparative Study of the Pylon's Anchorage Zone of Two Long-span Cablae-stayed Bridges[J];Engineering Science;2003-12
6 LI Fang\+1, LING Dao\|sheng\+2\;(1. College of Mechanical & Electrical Engineering, Zhejiang University of Technology, Hangzhou 310032, China; 2. Department of Civil Engineering, Zhejiang University, Hangzhou 310027, China);Survey of the developing in engineering structural optimization design[J];Engineering Design;2002-05
7 Wang Lupeng Qian Yexiang (China Railway Baoji Bridge,Inc Baoji 721006) Liu Xiaoguang Shi Zhiqiang (China Academy of Railway Sciences Beijing 100081);MANUFACTURE AND DISTORTION CONTROL OF FULLY WELDED ANCHOR BOX FOR LONG SPAN CABLE-STAYED BRIDGE WITH STEEL BOX BEAMS[J];Steel Construction;2002-03
8 WANG Ren-gui~1,MENG Fan-chao~1,WANG Zi-fu~1,WU Wei-sheng~1,SUN Guo-qiang~2(1.China Highway Planning and Design Institute(HPDI) Consultants,INC.,Beijing 100010,China;2.Construction Headquarters of Hangzhou Bay Bridge Project,Ningbo 315327,China);General Design of Hangzhou Bay Sea-Crossing Bridge[J];Highway;2006-09
9 LIU Wei1,PENG Wei-dong1,SUN Zhi-xian2(1.Road And Bridge Southern China Co.,Ltd.,Zhongshan 528403,China;2.Chang'an University,Xi'an 710064,China);Theoretical Analysis and Model Test of New Anchorage Structure in Tower of Cable-Stayed Bridge[J];Highway;2009-09
10 LOU Zhuang?hong (Research Institute of Highway MOC,Beijing 100088,China);Multi-span Cable-stayed Bridges[J];Journal of Highway and Transportation Reseach andk Development;2002-02
【Secondary References】
Chinese Journal Full-text Database 4 Hits
1 Hong Yong1,Huang Shuwen2,Wang Chengming2,Luo Wenlin2 (1.Rugao Traffic Investment & Development Co.,Ltd,Nantong 226500,China; 2.College of Transportation,Southeast University,Nanjing 210096,China);Finite Element Analysis of Sectional Model of Cable-pylon Anchorage Zone of Cable-stayed Bridge[J];Modern Transportation Technology;2013-02
2 Zhang Jin1,2 Yang Xiaojing1,2 Zhang Jian3 Ma Shuwei1,2(1.Key Laboratory of C & RC Structures of Ministry of Education,Southeast University,Nanjing 210096,China;2.Engineering Research Center for Prestress of Jiangsu Province,Nanjing 210096,China;3.Nanjing Dong-da Modern Prestressed Engineering Co.,Ltd.,Nanjing 210018,China);Test and full-process simulation analysis of the full-scale model of cable support tower segment[J];China Civil Engineering Journal;2010-S2
3 YAN Li-qiang;The Third Railway Survey and Design Institute Group Corporation;;Study on Anchoring Scheme for Cable-Pylon of Cable-stayed Bridge with Spatial Cable Plane[J];Railway Standard Design;2014-09
4 LU Binwei1,OU Bifeng2,GENG Bo3(1.Nanjing University of Science and Technology,Nanjing,Jiangsu 210094,China;2.Hunan Expressway Administration Bureau,Changsha,Hunan 410011,China;3.Chongqing Communication Research & Design institute,Chongqing 400067,China);Finite Element Analysis of Three Segments in the Anchorage Zone of Meixihe Bridge[J];Highway Engineering;2013-02
【Secondary Citations】
Chinese Journal Full-text Database 4 Hits
1 WANG Feng jun, XIANG Yi qiang (Department of Civil Engineering, Zhejiang University, Hangzhou 310027, China);The Full-scale Model Test and Spatial Analysis for the Segment of Cable Pylon of Cable-stayed Bridge[J];Bridge Construction;2001-02
2 CAO Shang yin 1, FANG Wei dong 1, HE Yu\|ren 1, ZHANG Jian long 2, LI Xing hua 2 (1. Development Company of Ezhou Huanggang Changjiang River Highway Bridge, Huanggang 438000, China; 2. The Bridge Science Research Institute of China Zhongtie Ma;Calculation of the Distribution of Effective Prestressing Force and the Set-back Amount of Steel Wires after Anchorage of a Loop Prestressed Cable[J];Bridge Construction;2001-06
3 Chen Dewei Zheng Xinguang Xiang Haifan (Tongji University);A CONSTRUCTION CONTROL SYSTEM FOR P.G.CABLE-STAYED BRIDGES[J];China Civil Engineering Journal;1993-01
4 Xiang Yiqiang (Zhejiang University)Yi Shaoping (Highway Planning & Design Insitute, MOC, P. R. C. )Du Xiaoqing; Xu Xing (Zhejiang University);STUDY ON THE FULL SCALE SEGMENTAL MODEL OF TOWER OF CABLE STAYED BRIDGE OF THE SECOND YANGTZE RIVER BRIDGE IN NANJING[J];;2000-01
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved