Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Guangdong Chemical Industry》 2012-10
Add to Favorite Get Latest Update

BOT Mode Analysis of China's Urban Sewage Treatment Plant

Feng Zhi(Sinohydro Road Bridge Engineering Co.,Ltd.,Beijing 100048,China)  
BOT(Build-Operate-Transfer) mode becomes the first choice for all levels of government to build sewage treatment facilities.The introduction of the city sewage treatment plant of BOT mode,the BOT risks and status all indicates that the BOT mode has its distinct advantages,and the risk is extremely complex.The region of sewage treatment plants,construction cost and the process have influences on the investment income of BOT projects.The plant cost in Municipalities and the eastern coast is higher.The plants of water flow less than 50,000 tons often use oxidation ditch process,and large-scale sewage treatment plants often use the A/A/O process.
【CateGory Index】: X703
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Citations】
Chinese Journal Full-text Database 2 Hits
1 Zhang Xinghua1,2, Qu Jianguo2, Song Weifeng1 (1. Faculty of Environmental Science and Engineering, Guangdong University of Technology, Guangzhou 510000;2. Kaiping Institute of Environmental Sciences, Kaiping 529300, China);Main Points Introduction of BOT Franchise Models in Municipal Wastewater Treatment Plant[J];Guangdong Chemical Industry;2009-07
2 Zhu Jin-shan et al;Key Problems of BOT Model Applied in Municipal Sewage Treatment[J];Environmental Protection Science;2007-06
【Co-citations】
Chinese Journal Full-text Database 8 Hits
1 XIE Wei,WU Jian-feng (College of Resources and Environmental Engineering,Wuhan University of Technology,Wuhan 430070,China);A model of treatment price adjustment of wastewater and backwater in BOT and BT mode[J];Journal of University of Science and Technology Liaoning;2009-06
2 XIE Wei1 WU Jian-feng2 CAI Jiang-bo3(1 College of Resources and Environmental Engineering,Wuhan University of Technology,Wuhan Hubei 430070)(2 Suqian Economic Institute,Shuyang Jiangsu 223600);BOT MODEL WITH BT BUILD A WATER TREATMENT PLANT NETWORK LICENSE PRICING MODEL[J];Journal of Chaohu College;2009-06
3 SONG Jin-bo,WANG Dong-bo,SONG Dan-rong(School of Management,Dalian University of Technology,Dalian 116024,China);A Decision Model of Concession Period for Build-Operate-Transfer Projects of Wastewater Treatment Based on Monte Carlo Simulation[J];Journal of Industrial Engineering and Engineering Management;2010-04
4 XIE Wei1 WU Jianfeng1 SUN Jianbo2(1.College of Resources and Environmental Engineering,Wuhan University of Technology Wuhan 430070);A Study of Price Adjustment Model on the Wastewater and Backwater Treatment in the BOT and BT Mode[J];Industrial Safety and Environmental Protection;2010-10
5 YAN Min1,GAO Hai-chao2,YAN Ling2(1.School of Public Administration,Tianjin University of Commerce,Tianjin 300134,China;2.School of Management,Tianjin University of Technology,Tianjin 300384,China);Research on the Reward Incentive Mechanism of Agent Construction Service Based on Risk Undertaken[J];East China Economic Management;2012-03
6 ;Marketization Operation Characteristics and Countermeasures of Pollution Control Facilities[J];Environmental Protection Science;2012-01
7 XIE Wei1,WU Jian-feng1,SUN Jian-bo2(1 College of Resources and Environmental Engineering,Wuhan University of Technology,Wuhan,Hubei,430070,China;2 Jiangsu Senior Technical Institute,Changzhou,Jiangsu,213000,China);A Study of Price Adjustment Model on the Wastewater and Backwater Treatment in the BOT and BT Mode[J];Journal of Jingchu University of Technology;2009-09
8 BAO Shaohua;& YANG Wenbin;Urban Construction School of Zhejiang Shuren University;Jiashan Rongda Construction and Installation Co.,Ltd.;;Superficial Analysis of the Project-financing Innovative Practice in Urban Construction of Hangzhou City[J];Journal of Zhejiang Shuren University(Acta Scientiarum Naturalium);2008-02
【Secondary Citations】
Chinese Journal Full-text Database 10 Hits
1 WANG Jun-hao, WANG Jian-ming (Zhejiang University of Finance & Economics, Hangzhou 310012,China);Marketization of China's Urban Sewage and Rubbish Treatment and Regulatory Policy[J];Collected Essays on Finance and Economics;2005-02
2 He Hong-ming(School of Finance and Financial, Renmin University of China, Beijing 100872);The Theory on the Reform of the Investment and Operation of the Urban Infrastructure in China[J];Urban Studies;2004-01
3 LI Xiuhui, ZHANG Shiying;PUBLIC-PRIVATE PARTNERSHIP AND URBAN INFRASTRUCTURE CONSTRUCTION[J];City Planning Review;2002-07
4 ;BOT在我国水务行业中的应用及风险规避[J];Urban Problems;2005-02
5 QI Yu-dong;Theory and Practice of Control of Natural Monopoly[J];Contemporary Finance & Economics;2001-12
6 Yu Bo;A Risk Evaluation for BOT Project of Sewage Treatment[J];Fujian Construction Science & Technology;2006-01
7 BIAN Xingyu1, XIAO Hong2(1.Shandong Environment Science Research and Design Institute, Jinan 250013;2.Shandong Environment Protection Bureau, Jinan 250012);Initial Purchase Negotiation to Construct a Small-scale Wastewater Treatment Plant by BOT[J];Environmental Science and Technology;2002-S1
8 YU Bo, YU Jian-xing(College of Civil Engineering,Tianjin University, Tianjin 300072,China);Analysis of financial risk for investment decision--Illustrated with sewage BOT project[J];Journal of Fujian Agriculture and Forestry University (philosophy and Science);2005-02
9 HE Bo sen,WAN Cai yun (School of Management,Tianjin University,Tianjin 300072,China);Risk Allocation and Contract Management of BOT Projects[J];China Harbour Engineering;2001-05
10 By LI Qi ming(College of Civil Engineering,Southeast University,Nanjing 210096,China);SHENG Li yin(Department of Building & Real Estate,HongKong Polytechnic University,HongKong,China);Decision-Making Model on Concession Term for Infrastructure BOT Projects[J];JOURNAL OF INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT;2000-01
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved