Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Urban Mass Transit》 2009-10
Add to Favorite Get Latest Update

Research on the Overall Risk Assessment of Urban Rail Transit Enterpreses

Zhang Xiaoli Shenzhen Metro Group Co.,Ltd.,518026,Shenzhen,China  
High risks are existing in urban rail transit construction,operation and management,it is of great significance to implement an overall risk assessment.This paper systematically introduces the COSO-ERM framework,intends to research on the goals,the implement steps and the design of the orgainization structure of the risk assessment in urban rail transit enterprises based on the practice of Shenzhen Metro Group in this field.
【CateGory Index】: F572
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【References】
Chinese Journal Full-text Database 4 Hits
1 Zhang Hui,Li Wenyong,Ni Zhifang Shanghai Jianke Project Management Co.,Ltd.,200032,Shanghai,China;Risk Assessment and Management Measures for Shanghai Rail Transit Construction[J];Urban Mass Transit;2010-11
2 Li Luning Shenzhen Metro Group Co.,Ltd., 518026,Shenzhen,China;On Group Control Mode of Urban Mass Transit Enterprises[J];Urban Mass Transit;2011-07
3 Chen Yizhi Engineering Consultation Co.,Ltd.,China Railway Fourth Survey and Design Group,430063,Wuhan, China;The Risk Management Scheme of the Wuhan-Guangzhou Passenger Dedicated Railway Line Construction Project[J];Urban Mass Transit;2011-11
4 Long Hongde,Peng Xiuming,Li Pengju Shenzhen Metro Group Co.,Ltd., 518026,Shenzhen,China;Security Management Practices of the Middle Line of Shenzhen Metro Ring[J];Urban Mass Transit;2011-11
【Citations】
Chinese Journal Full-text Database 5 Hits
1 Gu Sufei(Operation Branch of Shenzhen Metro Co., Ltd., Shenzhen 518040);Layout and Application of Operation and Safety Management System in Shenzhen Metro[J];Urban Rapid Rail Transit;2006-01
2 Zhu Shengli1 Wang Wenbin1 Liu Weining2 Lu Meili2(1. Beijing MTR Construction Administration Corporation, Beijing 100037;2. Beijing Jiaotong University, Beijing 100044);Discussion on Risk Management of Subway Projects[J];Urban Rapid Rail Transit;2008-01
3 Zhang Hong,Liu Yong,Dong Sanxi Shenzhen Metro Co.,Ltd.,518026,Shenzhem,China;Experiences of Investment/Financing on Metro in Seven World Cities[J];Urban Mass Transit;2007-10
4 LI Minghui(Department of Accounting,Nanjing University,Nanjing 210093,China);Organizational Structure of Risk Management[J];Science of Science and Management of S.& T.;2008-01
5 ZHANG Wei-gong1,2,HE Jian-min1,DING De-chen1(1.School of Ecnomics and Management,Southeast University,Nanjing 211189; 2.Yangguang Property Insurance Company,Beijing 100020);Overview the Enterprise Risk Management[J];Soft Science;2008-12
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 Wang Fei1,2,Hu Qunfang3,Huang Hongwei1,2 (1.Department of Geotechnical Engineering,Tongji University,Shanghai 200092,China;2.Key Laboratory of Geotechnical and Underground Engineering of the Ministry of Education,Tongji University,Shanghai 200092,China;3.Institute of Disaster Prevention & Relief,Shanghai 200092,China);Dynamic Risk Management for Simultaneous Construction of Stations in Rail Transit Systems[J];Chinese Journal of Underground Space and Engineering;2010-05
2 ZHOU Yun-tao (Graduate School,University of International Business and Economics,Beijing 100029,China);On Evolution of the Theory of Enterprise Risk Management[J];Journal of Chongqing Technology and Business University(Social Science Edition);2010-05
3 CAO Yuan-kun,WANG Guang-jun(Jiangxi University of Finance and Economics,Nanchang 330013,China);Business Risk Management Development Course and New Understandings of the Research Trends[J];Contemporary Finance & Economics;2011-01
4 HAN Bao-qing (School of Business Administration, North China Electric Power University, Beijing 102206, China);Analysis on Risk Management for China’s Electric Power Enterprises[J];Electric Power Technologic Economics;2009-03
5 Zhang Xiaoli Zhang Hong Liu Yong(Shenzhen Metro Co.,Ltd.,Shenzhen 518026);Connotation and Idea of Operation of an Earning Model——"Metro Management+Property Development"[J];Urban Rapid Rail Transit;2008-02
6 Zhou Huajie(Wuhan Metro Group Co.Ltd.,Wuhan 430030);Study on the Security Management System of Metro Projects in China[J];Urban Rapid Rail Transit;2009-01
7 Zhao Bin(Beijing MTR Construction Administration Corporation,Beijing 100037);Environmental Risk Management Strategy in Urban Rail Transit Construction[J];Urban Rapid Rail Transit;2009-01
8 Xu Shuliang (Nanjing Subway Operation Branch Company,Nanjing 210012);Safety Control for the External Construction in Subway Protective Area[J];Urban Rapid Rail Transit;2009-04
9 Yan Fei1 Tang Tao2 Gao Chunhai2(1. School of Electronics and Information Engineering,Beijing Jiaotong University,Beijing 100044;2. State Key Laboratory of Rail Traffic Control and Safety,Beijing Jiaotong University,Beijing 100044);Research on Safety Assessment Framework for Urban Rail Transit[J];Urban Rapid Rail Transit;2010-03
10 Xu Jing,Xu Hangsu Shanghai Rail Transit Shenjia Line Development Co.,Ltd.,200333,Shanghai,China;On Private Capital in Rail Transit Financing[J];Urban Mass Transit;2009-07
China Proceedings of conference Full-text Database 5 Hits
1 Liu Wen,Hu Qunfang,Zhang Hong,Shi Hongxia;Dynamic Risk Management on In-Situ Construction of Urban Rail Transit Systems[A];[C];2009
2 Li Fengwei,Du Xiuli,Zhang Mingju,Gao Yunhao;Recognize of Risk Sources in Subway Station Construction with Open-Cut Method[A];[C];2009
3 Zhao Fuzhuang,Wang Yanchang;Risk Analysis and Control Measures of Air Channel Excavation of Subway Station[A];[C];2009
4 ZHANG Cheng-ping,ZHANG Ding-li,WANG Meng-shu,LIU Sheng-chun (Tunnel and Underground Engineering Research Center of Ministry of Education,Beijing Jiaotong University,Beijing 100044, China);Catastrophe mechanism and control technology of ground collapse induced by urban tunneling[A];[C];2010
5 Xie-Dongsheng,Wang-Mingyang,Lu-Hao (Engineering Institute of Engineering Corps,PLA University of Science & Technology,Nanjing 211107,China);ACCIDENTS STATISTICS AND ANALYSIS OF SUBWAY ENGINEERING[A];[C];2010
【Co-references】
Chinese Journal Full-text Database 10 Hits
1 ZHANG Li~1,ZHOU Jie~2,FAN Jie-qun~1,ZHANG Ai-li~1 (1.Faculty of Civil Engineering,Chongqing University,Chongqing400045,China; 2.Sichuan Institute of Constroction Profession Technology,Chengdu610000,China);TOT financing mode and its risk analysis[J];Building Science Research of Sichuan;2004-02
2 ZHOU Hong-bo1,2,NI Zhi-fang3,GAO Wen-jie1(1.Shanghai Jianke Project Management Co.Ltd.Shanghai.200032.China;2.Tongji University.Shanghai.200092.China.3.Shanghai Yangpu Metro Line Development Co.Ltd Shanghai 200010,China);Study on Risk Assessment and Control Measures for the Construction Safety of Metro Line Project[J];Chinese Journal of Underground Space and Engineering;2008-05
3 ZHANG Ai-lin,YUAN Tao(Inner Mongolia University of Science & Technology,Baotou 014010,Nei Monggol,China);Analysis on Risk Management in Construction Project Management[J];Science & Technology of Baotou Steel(Group) Corporation;2006-04
4 ZHANG Shi-wen1,2,LIU Xiao-ming1(1.College of Architecture and Civil Engineering,Beijing University of Technology,Beijing 100124,China;2.China Communications Construction Investment Company Limited,Beijing 100088, China);Rapid Risk Analysis for Highway BOT Project Using the Data of Feasibility Report[J];Journal of Beijing University of Technology;2010-01
5 CHEN Jian-hua(The School of Economics and Management,Nanhua University,Hengyang,Hunan,421001,China);The Research on Risk Identification in Enterprise Organizational Innovation[J];Commercial Research;2004-23
6 YU Guo-an (Department of Management,Henan Business College,Zhengzhou,Henan 450002,China);The Analysis of the Period of Infrastructure Concession[J];Commercial Research;2006-11
7 Ren Bo Yan Zhe;A Summary of Researches on BOT Methods ofInvesting and Circulating Funds[J];;1998-04
8 MA Yong-sheng (School of International Business Administration, Shanghai University of Finance and Economics, Shanghai, China, 200433);Network Organization:New Development of Organization Theory for Enterprises[J];The Study of Finance and Economics;2000-12
9 SHEN Qi-mingSchool of Management, Chongqing Jiaotong University, Chongqing 400074, China;Briefly discussed the risk of the build-transfer project in construction[J];Journal of Chongqing Jiaotong University;2005-06
10 ;BOT中特许协议的 法律性质及争议解决初探[J];Journal of Chongqing University of Post and Telecommunications(Social Sciences Edition);2005-02
【Secondary References】
Chinese Journal Full-text Database 3 Hits
1 Zhou Maosen1,Zhu Dan2(1.Shanghai Jianke Engineering Consulting Co.,Ltd.Shanghai 200032,China;2.Shanghai Branch International Business Department,PICC Property and Casualty Company Limited,Shanghai 200010,China);Risk Survey Practice for a Shanghai Metro Construction[J];Chinese Journal of Underground Space and Engineering;2012-S2
2 ;交通企业风险产生的机制与内控应对措施分析[J];Enterprise Economy;2013-05
3 Zheng Bo,Wu Jianguo;Preliminary Study of Building a Simulate Legal Person Management System of Urban Rail Transit Operational Department[J];Modern Urban Transit;2012-05
【Secondary Citations】
Chinese Journal Full-text Database 8 Hits
1 Mao Ru Sino-Hongkong International Engineering Consult Corporation Ltd, Hongkong;A Study on the Risk Management of Engineering Projects[J];Urban Rapin Rail Transit;2004-02
2 Cui Yanping;Tang Zhenmin;Wu Xu School of Traffic and Transportation, Beijing Jiaotong University Beijing 100044;Study on the Operation Safety System of Metro[J];Urban Rapin Rail Transit;2004-03
3 Zhang Dianye Jin Jian Yang Jingshuai (College of Traffic & Transportation, Southwest Jiaotong University, Chengdu 610031);The Safety Research System of Urban Rail Transit[J];Urban Rapin Rail Transit;2004-04
4 Cui Yanping~1 Tang Zhenmin~1 Li Yixiong~2(1. Beijing Jiaotong University, Beijing 100044;2. Guangzhou Metro Corporation, Guangzhou 510380);Safety Management System of Urban Rail Transit[J];Urban Rapin Rail Transit;2005-03
5 Cai WeiShanghai Shentong Metro Group Go.,Ltd. Investment & Planning Department,200031,Shanghai,China;Enlightenment of the Basic Property of Urban Rail Transit on Financing[J];Urban Mass Transit;2007-01
6 Li Zhihui;An New Trend to the Development of Crisis Control in International Finance Business:the Comprehensive Management[J];Nankai Economic Studies;2002-01
7 LIU Xiao-xia1,LI Ming-hui2(1.Department of Accounting,Xiamen University,Xiamen 361005,China;2.Department of Accounting,Nanjing University,Nanjing 210093,China);Function and Responsibility of Participants of Enterprise Risks Management[J];Audit & Economy Research;2007-04
8 LU Mei-li LIU Wei-ning,Prof. LI Xing-gao (Institute of Tunnel & Geotechnical Engineering, Beijing Jiaotong University) Classification and code of disciplines: 620.5020;Discussion on Application of Risk Management in Urban Subway Project[J];China Safety Science Journal;2005-05
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved