Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《INDUSTRIAL ENGINEERING JOURNAL》 2000-02
Add to Favorite Get Latest Update

Varied Convertible Assembly Line Balance and Improve

LIN Jun, LI Sui-cheng (College of Business Administration, Xi'an University of Techology, Xi'an 710048, China)  
This Paper makes varied convertible assembly line as studying object and analysis the main factors which have effect on the balance of assembly line. Based on the time study, the MOI and promote the persons, feature are improved. So the balance of assembly line is insured and the productivity increased.
【CateGory Index】: F406.2
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【References】
Chinese Journal Full-text Database 2 Hits
1 LI Sui-cheng,Wang Rui(Management School,Xi'an University of Technology,Xi'an 710048,China);The Study of Man-hour and Operation Method in the X Company[J];Industrial Engineering Journal;2006-03
2 SHEN Wei-lei,XIE Feng,CHAI Chang(School of Mechanical and Automotive Engineering,Hefei University of Technology,Hefei 230009,China);Method about Assembly Line Balance based on Heuristic Balancing Search[J];Modular Machine Tool & Automatic Manufacturing Technique;2008-11
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 JIA Chun-yu (Management College,Changchun University,Changchun*"130022,China);A study of new near optimal method for one kind of 3×n water-flowing ordering problems[J];Journal of Changchun University;2004-06
2 JIA Chun-yu~1,HONG Qi~2,WANG Fu-li~3(1.Management College,Changchun University,Changchun 130022,China;2.Basic Department,Shengzhen Technological Institute of Information Job,Shengzhen 518029,China;3.Auditting Office,Changchun University,Changchun 130022,China);A discussion of approximate optimal solution to another two kinds of 3×n permutation schedule problems[J];Journal of Changchun University;2005-01
3 JIA Chun-yu~1,HONG Qi~2,WANG Fu-li~3(1.Management College,Changchun University,Changchun 130022,China;2.Fundamental Department,Shenzhen Vocational and Technological College,Shenzhen 518029,China;3.Audit Department,Changchun University,Changchun 130021,China);The study of paths number method for m×n permutation schedule problems[J];Journal of Changchun University;2005-04
4 JIA Chun-yu,ZHEN Yu-min,LIU Fu-cheng(Management College,Changchun University,Changchun,130022,China);The study of methods for maximum near optimal solution of m×n permutation schedule problems[J];Journal of Changchun University;2007-09
5 SUN Jian-hua,GAO Guang-zhang, JIANG Zhi-qiang (Zhengzhou Institute of Aeronautical Industrial Management, Zhengzhou 450015, China);Research on the Methods of Streamline Balance[J];Group Technology & Production Modernization;2004-04
6 GUO Fu(School of Business Administration, Northeastern University, Shenyang 110004, China);Application of the MOD Method in Production Line Capability Balancing[J];Journal of Northeastern University Social Science;2003-01
7 ;A Algorithm and Model of Productive Capacity Balance in Factory of Multi-Product Continuous Batch Process[J];Dongfang Electric Review;1993-01
8 Ren Zhongqi;Arrange Machines According to Maximal Tree Principle[J];;1991-02
9 JIA Chun-yu(School of Economics & Management,Ningbo University of Technology,Ningbo 315016,China);Study on adjusting optimization method for near optimal solution to permutation schedule problem[J];Journal of Liaoning Technical University;2006-04
10 Liu Guang;Optimizing Assembly Process of Paver with Process Program Analysis[J];Construction Machinery and Equipment;2005-06
【Co-references】
Chinese Journal Full-text Database 10 Hits
1 WANG Li (Anshan Teachers College,Liaoning Anshan 114005,China) ZHAO Ya ming (Department of Mathematics,Anshan Teachers College,Liaoning Anshan 114005,China);Agile Manufacturing and Computer Network Technology[J];JOURNAL OF ANSHAN TEACHERS COLLEGE;2000-03
2 WANG Li ZHU Jing (Anshan Normal University,Anshan Liaoning 114005,China);The Status and Advances of Flexible Flow Shop Scheduling Problem[J];Journal of Anshan Teachers College;2002-01
3 Zhang Weibo Wang Longshan(Jilin University, Changchun, 130025) Luo Hongyun(Jilin Institute of Technology);REALIZATION OF GENETIC ALGORITHM IN THE SEQUENCING OF MACHINING OPERATIONS AND A DISCUSSION OF RELEVANT PROBLEMS[J];Acta Armamentarii;2002-02
4 Guo Chuiyuan Huang Haijun Chen Liangyou;AN IMPLEMENTATION AND APPLICATION OF HEURISTIC METHODS ON PC FOR THE LINE BALANCING PROBLEM[J];Journal of Beijing University of Aeronautics and Astronautics;1989-02
5 Zhou Hong Cai Miaofeng\ Feng Yuncheng (Beijing University of Aeronautics and Astronautics,School of Management);KIND OF GENETIC ALGORITHM FOR SOLVING FlOW SHOP SEQUENCING PROBLEMS[J];JOURNAL OF BEIJING UNIVERSITY OF AERONAUTICS AND ASTRONAUTICS;1997-04
6 Han Limin\ Huang Hongxuan\ Feng Yuncheng (Beijing University of Aeronautics and Astronautics,School of Management);Job Shop Scheduling by Simulated Annealing Algorithm Combined with Tabu Search[J];JOURNAL OF BEIJING UNIVERSITY OF AERONAUTICS AND ASTRONAUTICS;1998-01
7 Shen Yingjun\ Huang Haijun (Beijing University of Aeronautics and Astronautics,Dept. of School of Management) Wu Sa (Beijing University of Aeronautics and Astronautics,Dept. of System Engineering of Engineering Technology) Wu Jing (Beijing University;New Scheduling Heuristic for the Permutation Flowshop Problem[J];JOURNAL OF BEIJING UNIVERSITY OF AERONAUTICS AND ASTRONAUTICS;1998-01
8 ZHENG Dawei, GEN Mitsuo (Department of Industrial and Systems Engineering Ashikaga Institute of Technology, Ashikaga, 326 Japan);Hybrid Genetic Algorithms with Fuzzy Logic Controller[J];Journal of University of Science and Technology Beijing;2002-01
9 TU De sheng (Department of Mathematics,Physics and Mechanics, Changsha Railway University, Changsha 410075,China);The Mathematical Modeling of the Placing of the Workpieces in a Production Line[J];JOURNAL OF CHANGSHA RAILWAY UNIVERSITY;2000-02
10 Liu Chen' guang, Li Suicheng;The Latest Development of Manufacturing Model - Mass-Customization[J];Group Technology & Production Modernization;2000-01
【Secondary References】
Chinese Journal Full-text Database 4 Hits
1 LIU Jian TANG Xiao-song LI Meng-jun (School of Information System and Management,National University of Defense Technology,Hunan,Changsha,410073);The Study of Estimation Approach of the Purchase and Equipping Cost of the Aerospace Products[J];Journal of Projectiles,Rockets,Missiles and Guidance;2005-S4
2 SU Xiao-jin,JIANG Zu-hua(School of Mechanical Engineering,Shanghai Jiao Tong University,Shanghai 200240,China);The analysis and simulation for the effect of production variability on production line[J];Industrial Engineering and Management;2008-02
3 WANG He-ping, SUN Wei-wei (School of Management Science and Engineering, Anhui University of Technology, Ma'anshan 243002, China);Application of the TOPSIS in Multi-objective Mix-assembly Line Sequencing[J];Logistics Sci-Tech;2009-09
4 SONG Hua-ming~(1,2),MA Shi-hua~1 (1.College of Management,Huazhong University of Science and Technology,Wuhan 430074,China;2.Institution of Economy Management,Nanjing University of Science & Technology,Nanjing 210094,China);Co-optimization for Mixed-Model Assembly Flow Line to Minimize Makespan[J];Systems Engineering-Theory & Practice;2007-02
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved