Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Industrial Engineering Journal》 2011-06
Add to Favorite Get Latest Update

An Approach to the Design of Dynamic Kanban System for a Multi-Product Series-Parallel Production System

Jin Qing,Ding Zhao-guo(School of Business Administration,Changzhou Institute of Technology,Changzhou 213022,China)  
A multi-product series-parallel production system that is common in electro-mechanical product enterprises is considered.To increase the productivity and reduce the work in process(WIP),a dynamic kanban system is designed such that the products can be produced in an alternate way.The product mix is dynamically controlled by the dynamic Kanbans.Algorithm is presented to calculate the number of kanbans such that the number of products for different types can be dynamically changed according to "the demands".Based on this approach,the "balance production of multi-products" can be realized and the number of WIP can be effectively controlled.
【CateGory Index】: TB497
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Citations】
Chinese Journal Full-text Database 10 Hits
1 HE Zhen,ZHOU Yan-hu,GAO Xue-feng(School of Management Tianjin University,Tianjin 300072,China);Study on Kanban System with Variations in Management[J];Journal of University of Science and Technology Beijing(Social Sciences Edition);2007-01
2 CHE Jian-guo1,HE Zhen2,KONG Xiang-fen3(1.TEDA College,Nankai University,Tianjin 300457,China;2.School of Management, Tianjin University,Tianjin 300072,China;3.School of Aeronautical and Engineering,Civil Aviation University of China,Tianjin 300300,China);The Applicability of Lean Production System under Multi-item and Low-volume Settings[J];Commercial Research;2009-09
3 QI Er-shi, LI Zhong-yang, AN Jing-ling (School of Management, Tianjin University, Tianjin 300072, China);Analysis and Design of Intermittently Moved Production Lines[J];Industrial Engineering Journal;2004-02
4 Jiang Nan-yun1,Jiang Min2,Cai Hong1,Fan Shu-hai1(1.Nanjing University of Technology,Department of Industrial Engineering,Nanjing 210009,China;2.Research Institute of Automation,Southeast University,Nanjing 210096,China);Master Production Scheduling for Series-Parallel Continuous Production System with Multiple Products[J];Industrial Engineering Journal;2009-06
5 Wang Hong-liang(GAC TOYOTA Motor CO.,LTD,Guangzhou 511455,China);Application of Just-In-Time Material Handling to Auto Industry in China[J];Industrial Engineering Journal;2009-06
6 DU Yu 1,2 , LI Zhi zhu 2 (1. Manufacturing Division, Jiangsu Fujitsu Telecommunication Technology Co., Ltd., Suzhou, Jiangsu 215011, China; 2. Dept. of Computer Sci.& Eng., Shanghai Jiao Tong Univ., Shanghai 200030, China);Application and Development of ERP in Small-Batch Production[J];Industrial Engineering and Management;2002-05
7 LI He-you, HAO Jian-nan (1. Tangshan Aisin Gear Co., Ltd. , Tangshan 063033, China; 2. School of Mechanical Engineering, Tianjin University, Tianjin 300072, China);Research of Controlling Methods in the Process of Kanban Management[J];Industrial Engineering and Management;2003-06
8 LI Zhan-kai,HE Yu-lin(Mechanical College,Chongqing University,Chongqing 400044,China);Study on the Applcation of Kanban Management in Corporation[J];Industrial Engineering and Management;2009-04
9 WANG Hong-liang(GAC Toyota Motor Company Guangzhou,Guangzhou 511455,China);A Study on Design Method of JIT Purchasing System[J];Industrial Engineering and Management;2010-03
10 Jin Qing~1,Zhang Zhong~1,Pan Xue-tao~2,Wang Xiao-yu~1,Ge Bing~1 (Changzhou Institute of Technology 1.School of Business Administration,Changzhou 213022,China; 2.School of Photoelectric Engineering,Changzhou 213002,China);A Visualized E-Kanban System for Small-Batch JIT Production[J];Industrial Engineering Journal;2011-03
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 Xu Xiaolong1,Wang Yuzhen2,Yao Honghua2 (1.School of Mechanical Engineering of Shanghai JiaoTong University,Shanghai 200240,China; 2.Shanghai Automobile Industry Corporation,Shanghai 200041,China);Analysis of Balance Production Based on Compressor Assembly Line with Small Batch Mixed-model[J];Design and Manufacture of Diesel Engine;2009-03
2 LIANG Yong-jian1,YANG Guang-xun2, XIA Guo-ping1(1.School of Economics & Management,BeijingUniversitiy of Aeronautics and Astronautics;2.School of Mechanical Engineering &Automation,Beijing Universitiy of Aeronautics and Astronautics,Beijing 100191,China);Lean Production in Non Mass Production[J];Group Technology & Production Modernization;2010-02
3 HUANG Jian-hui~1, XU Xue-jun~1, SUN Hong~2 (1.School of Business Administration, South China University of Technology, Guangzhou 510641,China; 2.Guangzhou New Oriental School, Guangzhou 510260, China);Optimization of In-plant Transportation of Parts in Kanban Control Systems[J];Industrial Engineering Journal;2004-04
4 Ren Pei-yu,Nie Fang (School of Business Administration,Sichuan University,Chengdu 610064,China);A Case Study of Cellular Manufacturing in a PLC Plant[J];Industrial Engineering Journal;2009-03
5 Lü Xiu-jie(Mechanical Engineering College,Liaoning Technical University,Fuxin 123000,China);Application of Procedure Analysis to Galvanized Steel Sheet Production[J];Industrial Engineering Journal;2011-01
6 LI Yun-tao;Application of TPS and its New Development in Chinese Agricultural Machine Enterprise[J];Chinese Agricultural Mechanization;2006-04
7 ;五菱易通公司装配线改进设计[J];Journal of Guangxi Institute of Technology;2005-S3
8 LI He-you, HAO Jian-nan (Tangshan Aisin Gear Ltd., Co. , Tangshan 063033,China);Kanban Administration in Corporations[J];Industrial Engineering and Management;2003-02
9 LI He-you, HAO Jian-nan (1. Tangshan Aisin Gear Co., Ltd. , Tangshan 063033, China; 2. School of Mechanical Engineering, Tianjin University, Tianjin 300072, China);Research of Controlling Methods in the Process of Kanban Management[J];Industrial Engineering and Management;2003-06
10 LI He-you, HAO Jian-nan (Tangshan Aisin Gear Ltd., Co., Tangshan 063033,China);The Convey Mode During KANBAN Management[J];Industrial Engineering and Management;2004-04
China Proceedings of conference Full-text Database 2 Hits
1 HAN Wen-min,JIN Li-hua (Jiangsu University of Science and Technology,Zhenjiang 212003,China);Analysis and Design of Fixed Production Line[A];[C];2009
2 TONG Qiang,XIE Yongchun,LI Changhua,YANG Haijun(Offshore Oil Engineering(Qingdao) Co.,Ltd,Qingdao 266555,Shandong,China);Analysis and Application of JIT in the Offshore Manufacturing Industry[A];[C];2011
【Secondary Citations】
Chinese Journal Full-text Database 10 Hits
1 HE Zhen,ZHOU Yan-hu,GAO Xue-feng(School of Management Tianjin University,Tianjin 300072,China);Study on Kanban System with Variations in Management[J];Journal of University of Science and Technology Beijing(Social Sciences Edition);2007-01
2 CHE Jian-guo1,HE Zhen2,KONG Xiang-fen3(1.TEDA College,Nankai University,Tianjin 300457,China;2.School of Management, Tianjin University,Tianjin 300072,China;3.School of Aeronautical and Engineering,Civil Aviation University of China,Tianjin 300300,China);The Applicability of Lean Production System under Multi-item and Low-volume Settings[J];Commercial Research;2009-09
3 WANG Pin(Tianjin University of light Industry, Tianjin 300222, China);Study on Development of Lean Production in Japan[J];Group Technology & Production Modernization;2002-01
4 Li Jianzhong;Dynamic Programming and Heuristic Algorithm for Balancing Mixed Model Lines[J];Systems Engineering;1996-02
5 TIAN Qing, ZHOU Gang, QI Er-shi (1. Dandong Textile College, Dandong 118003, China; 2. Management School of Tianjin University, Tianjin 300072, China);A Study on Material Flow System of TPS[J];Industrial Engineering Journal;2000-04
6 DING Bo-hui1,2,QI Er-shi2,ZHANG Jie2,YANG Zuo-gang3 (1.School of Mechanical Engineering,2.School of Management,Tianjin University,Tianjin 300072,China;3.MBA Education Center,Tianjin University of Finance & Economics,Tianjin 300222,China);Manufacturing Execution System based on Toyota Production System[J];Industrial Engineering Journal;2007-05
7 Li Chao-lin(Department of LTD Technique,Bingshan Group Dalian Refrigeration Co.,Dalian 116033,China);Production Control Based on Kanban-net and Lean Production[J];Industrial Engineering Journal;2008-06
8 By MA Shi hua(College of Management,Huazhong University of Sci. and Tech.,Wuhan 430074,China);A Study on New Issues and Countermeasures of Production Management under the Mass Customization[J];JOURNAL OF INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT;2000-03
9 Dr.Qi Ershi,( Professor,Vice Dean of Management School,Tianjin University,Tianjin 300072,China);Toyota Production System and the Analysis of its Application in China[J];INDUSTRIAL ENGINEERING AND MANAGEMANT;1997-04
10 ;The Toyota Production System That We Understand[J];INDUSTRIAL ENGINEERING AND MANAGEMANT;2000-01
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved