Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Traffic Engineering and Technology for National Defence》 2012-06
Add to Favorite Get Latest Update

The Design and Use of the Bailey-Type Portable Steel Bridge for the Shenglian Island of the Kwan-yin Lake

Xu Guanyao1,Tian Jing1,Li He2,Zhu Jie3(1.No.2 Institute of Engineer Corps,General Equipment Headquarters,Beijing 100093,China;2.Development and Construction Administration Committee of Suining Kwan-yin Lake,Suining 629000,China;3.Zhejiang Li Xiang Tong Ji Engineering Machinery Co.Ltd.,Shangyu 312367,China)  
Being 606 m(46×12 m+6 m+4×12 m) in total length,the portable steel bridge for the Shenglian Island of the Kwan-yin Lake is made up of Type-321 Bailey Panels.50 spans of this bridge are deck-type while the side span(the first span) is through-type.The choice of the designed loads and designed water levels for the bridge,the structural lay-out of the portable bridge and the points for attention in the design of the bridge are introduced in the paper,with technical measures for the use and maintenance of the bridge proposed.The vehicle test shows that the design meets the requirements.The practical use of the portable bridge proves the bridge safe and reliable,which helps speed up the developing progress of the Kwan-yin Lake.
【CateGory Index】: U448.19
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Citations】
Chinese Journal Full-text Database 5 Hits
1 ZHU Yong-zhuo 1, XU Guan-yao 2, GOU Ming-kang 3 (1. Planning Department of the Ministry of Communications,Bejing,China 100736; 2.No.2 Institute of Engineering Corps of the General Equipment Headquarters, Beijing, China 100093; 3. No.1 Institute of Engineering Corps of the General Equipment Headquarters, Wuxi,Jiangsu,China 214035);Design and Realization of Type-ZB-200 Prefabricated Highway Steel Bridges[J];Traffic Engineering and Technology for National Defence;2004-01
2 Xu Guanyao,Sun Hongcai,TIAN Ping(No.2 Scientific Research Institute of the Engineering Corps,General Equipment Headquarters,Beijing 100093,China);Safety Assessment of Type-321 Portable Steel Bridge[J];Traffic Engineering and Technology for National Defence;2009-02
3 Hou Yulin(The Sixth Bureau Group Co.Ltd.of the Railway Ministry,Beijing 100036,China);Safety Assessment of Portable Steel Bridges for Emergencies[J];Traffic Engineering and Technology for National Defence;2011-06
4 Xu Guanyao1 Zhu Jie2 (1. No.2 Institute of Engineer Corps, General Equipment Headquarters, Beijin g 100093, China; 2. Zhejiang Lixiang Tongji Engineering Machinery Co. Ltd, Shangyu 31236 7, China);DEVELOPMENT AND APPLICATION OF PORTABLE STEEL BRIDGES IN CHINA[J];Steel Construction;2009-07
5 Xu Guanyao1 Yin Cunxin2 Zhou Jian3(1. No. 2 Institute of Engineer Corps,General Equipment Headquarters,Beijing 100093,China;2. Beijing General Municipal Engineering Design & Research Institute,Beijing 100082,China;3. Jiangsu Zhongjian Bridge Engineering Equipment Co.Ltd,Zhenjiang 212011,China);TO SPEED UP BRIDGE CONSTRUCTION USING ASSEMBLED STEEL BRIDGE TECHNOLOGY[J];Steel Construction;2011-02
【Co-citations】
Chinese Journal Full-text Database 8 Hits
1 Xu Guanyao,Sun Hongcai,TIAN Ping(No.2 Scientific Research Institute of the Engineering Corps,General Equipment Headquarters,Beijing 100093,China);Safety Assessment of Type-321 Portable Steel Bridge[J];Traffic Engineering and Technology for National Defence;2009-02
2 Hou Yulin(The Sixth Bureau Group Co.Ltd.of the Railway Ministry,Beijing 100036,China);Safety Assessment of Portable Steel Bridges for Emergencies[J];Traffic Engineering and Technology for National Defence;2011-06
3 Xu Guanyao1 Zhu Jie2 (1. No.2 Institute of Engineer Corps, General Equipment Headquarters, Beijin g 100093, China; 2. Zhejiang Lixiang Tongji Engineering Machinery Co. Ltd, Shangyu 31236 7, China);DEVELOPMENT AND APPLICATION OF PORTABLE STEEL BRIDGES IN CHINA[J];Steel Construction;2009-07
4 Zhao Jialiang Song Huawei(Beijing Chongjian Construction Co.Ltd,Beijing 100061,China);THE TECHNOLOGY OF THE PREFABRICATED STEEL-BOX GIRDER SEGMENT INTERFACE MATCHING AND THE LAW OF INTERFACE GIRTH WELDING DEFORMATION[J];Steel Construction;2010-09
5 Ouyang Chu 1 Ma Guangshun 1 Xu Guanyao 1 Zhang Hengfei 2(1.No.2 Institute of Engineer Corps,General Equipment Headquarters,Beijing 100093,China;2.Jiangsu Donghua Testing Technology Co.Ltd,Jingjiang 214500,China);DESIGN OF HEALTH MONITORING AND SAFETY EVALUATION SYSTEM FOR ASSEMBLED STEEL BRIDGE[J];Steel Construction;2010-12
6 Xu Guanyao1 Yin Cunxin2 Zhou Jian3(1. No. 2 Institute of Engineer Corps,General Equipment Headquarters,Beijing 100093,China;2. Beijing General Municipal Engineering Design & Research Institute,Beijing 100082,China;3. Jiangsu Zhongjian Bridge Engineering Equipment Co.Ltd,Zhenjiang 212011,China);TO SPEED UP BRIDGE CONSTRUCTION USING ASSEMBLED STEEL BRIDGE TECHNOLOGY[J];Steel Construction;2011-02
7 CHEN Zheng~1 SHU Bi-qing~1 ZHANG Yan-hong~2 YANG Ping~1 SUN Hong-yan~1 (1.College of Civil Engineering of Nanjing Forestry University,Nanjing Jiangsu 210003 China;2.Bridge & Tunnel Construction Company of No.3 Bureau of China Railway Construction Bureau,Taiyuan Shanxi 030000 China);Inner Force and Deflection Analysis in the Temporary Bridge of Metro Station Loading Test[J];Jiangsu Construction;2007-01
8 SUN Hong-cai,XU Guan-yao,TIAN Ping(No.2 Institute of Engineer Corps,General Equipment Headquarters,Beijing 100093,China);Design Alternatives Evaluation of Emergency Bridge by Applying Analytic Network Process(ANP)[J];Systems Engineering-Theory & Practice;2007-03
China Proceedings of conference Full-text Database 2 Hits
1 Qilin Zhao,Fei Li,kang Xu (Engineering Institute of Engineer Corps,PLA University of Science and Technology, Nanjing 210007,China);The static loading experimental research of the new composite truss[A];[C];2011
2 LIU Yu-juan LIU Yong-jian SUN Hao;Status and Research of the Fabricated Steel Bridge[A];[C];2012
【Secondary Citations】
Chinese Journal Full-text Database 10 Hits
1 ZHU Yong-zhuo 1, XU Guan-yao 2, GOU Ming-kang 3 (1. Planning Department of the Ministry of Communications,Bejing,China 100736; 2.No.2 Institute of Engineering Corps of the General Equipment Headquarters, Beijing, China 100093; 3. No.1 Institute of Engineering Corps of the General Equipment Headquarters, Wuxi,Jiangsu,China 214035);Design and Realization of Type-ZB-200 Prefabricated Highway Steel Bridges[J];Traffic Engineering and Technology for National Defence;2004-01
2 LIU Liang-mou1,XU Guan-yao2 (1.Zhongshan Highway Steel Structure Manufacture Co.,Ltd., Zhongshan528436, China;2.No. 2 Institute of Engineer Corps, General Equipment Headquarters, Beijing100093, China);A Study of the Monolithic Stability of the “321” Prefabricated 21m-spanned Highway Steel Bridge[J];Traffic Engineering and Technology for National Defence;2007-01
3 Xu Guanyao,Sun Hongcai,TIAN Ping(No.2 Scientific Research Institute of the Engineering Corps,General Equipment Headquarters,Beijing 100093,China);Safety Assessment of Type-321 Portable Steel Bridge[J];Traffic Engineering and Technology for National Defence;2009-02
4 Xu Guanyao(No.2 Institute, Engineer Corps, Engineer Corps, PLA Beijing 100093)Yu Zhongquan (Highway Planning & Design Institute Beijing 100010);THE STATUS AND DEVELOPMENT OF PREFABRICATED BRIDGE[J];STEEL CONSTRUCTION;1999-03
5 Miao Guangquan (No.1 Machinery Plant of Jiangsu Provincial Communications Engineering Corporation Zhenjiang 212001) Xu Guanyao (No.2 Institute of Engineer Corps, General Equipment Headquarters Beijing 100093);DEFICIENCY OF TYPE 100 BAILEY BRIDGES UNDER TODAY′S TRAFFIC CONDITIONS AND FEATURES OF TYPE 200 BRIDGES[J];Steel Construction;2002-05
6 Xu Guanyao Sun Hongcai (No. 2 Institute of Engineer Corps, General Equipment Headquarters Beijing 100093) Liu Yong Xie Feng (Engineering Institute of Engineering Corps,PLA Univ. of Sci. & Tech. Nanjing 210007);RESEARCH ON IMPACT FACTOR FOR PREFABRICATED HIGHWAY STEEL BRIDGES[J];Steel Construction;2002-05
7 Xu Guanyao1 Zhu Jie2 (1. No.2 Institute of Engineer Corps, General Equipment Headquarters, Beijin g 100093, China; 2. Zhejiang Lixiang Tongji Engineering Machinery Co. Ltd, Shangyu 31236 7, China);DEVELOPMENT AND APPLICATION OF PORTABLE STEEL BRIDGES IN CHINA[J];Steel Construction;2009-07
8 Xie Jifeng Luo Jiaguang Gao Zhi (Anyang Iron and Steel Group Co. Ltd);OPERATIONAL PRACTICE OF NEGATIVE DEVIATION ROLLING IN THE LIGHT SECTION MILL OF ANYANG IRON AND STEEL GROUP CO.LTD[J];Reseach On Iron and Steel;2002-06
9 LI Yi-dong, GAO Ming-jie(Medium Section Rolling Plant, Tangshan Iron and Steel Company, Tangshan, Hebei, 063016);SECTION STEEL ROLLING WITH NEGATIVE TOLERANCE[J];Hebei Metallurgy;2005-04
10 SUN Hong-cai,XU Guan-yao,TIAN Ping(No.2 Institute of Engineer Corps,General Equipment Headquarters,Beijing 100093,China);Design Alternatives Evaluation of Emergency Bridge by Applying Analytic Network Process(ANP)[J];Systems Engineering-Theory & Practice;2007-03
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved