Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Reformation & Strategy》 2009-06
Add to Favorite Get Latest Update

Cost Control of Engineering Project Based on Earned Value Theory

Li Tao(Shijiazhuang Vocational Technology Institute, Shijiazhang, Hebei 050081)  
Construction corporation is the stanchion industry in China, it plays the leading and basic role in national economy and social development.In order to survive, improve and develop in competitive market nowadays, new ways to cut the costs are seriously needed for those construction corporations.Based on the analysis of existing cost management problems of China's construction corporations, the costs control method is proposed based on earned value theory so as to reduce the costs.
【CateGory Index】: F285;F224
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【References】
Chinese Journal Full-text Database 1 Hits
1 Qin Wei;Application of Earned Value Theory in Cost Control of Engineering Project[J];Municipal Engineering Technology;2013-02
【Citations】
Chinese Journal Full-text Database 2 Hits
1 Qi Anbang;On the Multi-factors Integration Management Method for Project Management[J];Nankai Business Review;2002-06
2 Wang Zhongwei(Huazhong University of Science & Technology,Wuhan 300074,Hubei Province);Application of Earned Value Method in Forest Project[J];Forest Engineering;2004-05
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 ZHAO Hui,WANG Xue-qing(School of Management,Tianjin University,Tianjin 300072);Information System Construction of Compositive Project Management[J];Journal of Beijing Institute of Technology(Social Sciences Edition);2008-06
2 WU Xiao-hong(Civil Engineering Department of Tangshan College,Hebei Tangshan 063000,China);A research on integrated management in large-scale topographic mapping[J];Science of Surveying and Mapping;2011-03
3 ZHANG Xiao-fang (Henan University of Urban Construction,Pingdingshan 467036,China);Contrastive analysis of Chinese and foreign construction contract management[J];Journal of Henan University of Urban Construction;2011-06
4 LI Rui*1,2,LIU Yu-jun1,2,ZHANG Fan1,2,WANG Ji1,2,DENG Yan-ping1,21.State Key Laboratory of Structural Analysis for Industrial Equipment, Dalian University of Technology,Dalian 116024,China;2.Department of Naval Architecture,Dalian University of Technology,Dalian 116024,China;Research on project cost performance evaluation method using earned value of risk[J];Journal of Dalian University of Technology;2011-02
5 CHEN Xi,XU Rong,XU Wei,WANG Xu-feng(College of Civil Engineering,Tongji University,Shanghai 200092,China);STUDY ON ORGANIZATION DESIGN IN LIFE-CYCLE MANAGEMENT OF EXPO VILLAGE PROJECT[J];Low Temperature Architecture Technology;2010-09
6 GUO Shi-hong,HU Zhi-yuan,LIU Pei-feng(Xi'an University of Architecture and Technology,Xi'an,Shaanxi 710055,China);Quality Earned Value Method Based on Delghi Method[J];Journal of Water Resources and Architectural Engineering;2011-02
7 LU Ning,FENG Yangping,WANG Fang,ZHOU Xuan,WANG Wei(College of Architectural,Chang’an University,Xi’an 710061,China);Quality earned value for integrated management[J];Journal of Liaoning Technical University(Natural Science);2009-01
8 GAO Ming~1,CHEN Yong-qiang~1,QIAO Yue~2(1.School of Management,Tianjin University,Tianjin 300072;2.CCC First Harbor Consultants Co.,Ltd.,Tianjin 300222,China);Analysis of Time-cost-quality Trade-off in Engineering Project Management[J];Port Engineering Technology;2007-01
9 GAO Peng1,FENG Jun-wen1,WANG Hua-ting2(1.School of Economics and Management,Nanjing University of Science & Technology,Nanjing 210094,China;2.The State Key Laboratory of Intelligent Technology and System,Tsinghua University,Beijing 100084,China);Method for Scheduling Forecasting with Time-based Earned Value Technology[J];Systems Engineering;2009-12
10 ZHANG Lian-ying,LUAN Yan,ZOU Xu-qing(School of Management,Tianjin University,Tianjin 300072,China);Time-cost-quality Trade-off Optimization Model of Construction Project[J];Systems Engineering;2012-03
China Proceedings of conference Full-text Database 1 Hits
1 XU Yuan1, QI Anbang2 , ZHANG Jie2 (1. Tianjin Chengtou Constructing Ltd.) (2. Project Management Research center of Nankai University);The research on the Total Element Integration Management Method of the Government Investment Project Constructing Agent Enterprise[A];[C];2008
【Co-references】
Chinese Journal Full-text Database 10 Hits
1 JI Liang zhong (Capital Construction Office,AHUT,Ma'anshan 243002,Anhui,China);On the Control of Capital Construction Project Cost[J];Journal of Anhui University of Technology(Sociel Sciences);2004-04
2 QIAO Li-hong1,GUO Guang-xin1,YANG Zhi-bing2(1.School of Mechanical Engineering and Automation,Beihang University,Beijing 100191,China;2.School of Mechanical Engineering,Beijing Institute of Technology,Beijing 100081,China);Application of Improved Earned Value Method in Project Management Processes[J];Transactions of Beijing Institute of Technology;2010-01
3 HE Yun long, LIU Xiong, CHE Yun (Changsha Communications University, Changsha 410076, China);Comprehensive Analysis and Evaluation Methods of Project Cost[J];Journal of Changsha Communications University;2002-02
4 FU Hong-yuan,HUANG Chuang-bin,ZHAO Lang(College of Construction Management and Real Estate,Chongqing University,Chongqing 400030,China);Quality Earned Value Method Based on Quality Evaluation[J];Journal of Chongqing University(Natural Science Edition);2007-03
5 GAO Ming~1,CHEN Yong-qiang~1,QIAO Yue~2(1.School of Management,Tianjin University,Tianjin 300072;2.CCC First Harbor Consultants Co.,Ltd.,Tianjin 300222,China);Analysis of Time-cost-quality Trade-off in Engineering Project Management[J];Port Engineering Technology;2007-01
6 GAO Peng1,FENG Jun-wen1,WANG Hua-ting2(1.School of Economics and Management,Nanjing University of Science & Technology,Nanjing 210094,China;2.The State Key Laboratory of Intelligent Technology and System,Tsinghua University,Beijing 100084,China);Method for Scheduling Forecasting with Time-based Earned Value Technology[J];Systems Engineering;2009-12
7 WANG Hua~1, YIN Yi-lin~2,LU Wen-xue~1 (1. School of Management, Tianjin University, Tianjin 300072,China; 2.School of Economy and Management, Tianjin University of Technology, Tianjin 300191,China);Organization Integration Management of Engineering Projects for the Whole Life Cycle[J];Industrial Engineering Journal;2005-02
8 MA Guo-feng,TU Mei-zeng (Management School,Shanghai Jiaotong University,Shanghai 200052);The Application of TOC in Project Schedule Management[J];Journal of Industrial Engineering and Engineering Management;2002-04
9 DING Bao-feng,ZHANG Hong-guo(College of Computer Science and Technology,Harbin University of Science and Technology,Harbin 150080,China);The improvement of earned value analysis in schedule measurement method[J];Information Technology;2006-02
10 ZHONG Dong-mei,YU Xiao-zhong(Industrial and Commercial Management Department of Southwest Petroleum Institute,Chengdu 610500,China);Improvement of Earned Value Management in Engineering Management[J];Chemical Techno-Economics;2005-03
【Secondary Citations】
Chinese Journal Full-text Database 2 Hits
1 Wang Zhongwei;Application of WBS in Interior Decoration Project[J];Furniture & Interior Decoration;2003-11
2 Wang Zhongwei;Risk management of forest exploitation projects[J];Forest Engineering;2002-06
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved