Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Steel Construction》 2002-02
Add to Favorite Get Latest Update

STUDY OF TENSILE ANCHOR PLATE STRUCTURE OF COMPOSITE CABLE-STAYED BRIDGE

Hou Wenqi Ye Meixin (Institute of Civil and Architectural Engineering,Central South University Changsha 410075)  
To ensure the safety of the structure,the design departments request the writer to do some dimensional nonlinear FEM analysis to two anchor structures of M Bridge,CM1 and CM21 According to the results,some advice is put forward and adopted by the design departments The bridge has been built up now,and is running well
【CateGory Index】: U441
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【References】
Chinese Journal Full-text Database 9 Hits
1 LI Xiao-zhen , CAI Jing , QIANG Shi-zhong (College of Civil Engineering, Southwest Jiaotong University, Chengdu 610031, China);MODELS OF CABLE-GIRDER ANCHORAGE FOR LONG-SPAN CABLE-STAYED BRIDGES WITH STEEL BOX GIRDER[J];Engineering Mechanics;2004-06
2 WEI Xing , LI Xiao-zhen , LI Jun , QIANG Shi-zhong , WANG Zi-jian (College of Civil Engineering, Southwest Jiaotong University, Chengdu 610031, China);EXPERIMENTAL STUDY ON ANCHOR-PLATE ANCHORAGE FOR CABLE-STAYED BRIDGES WITH STEEL BOX GIRDER[J];Engineering Mechanics;2007-04
3 BAO Li-xin1,2 , WEI Xing1 , LI Jun1, LI Xiao-zhen1 , QIANG Shi-zhong1 , REN Wei-ping1 (1. School of Civil Engineering, Southwest Jiaotong University, Chengdu, Sichuan 610031, China; 2. School of Civil Engineering, Chongqing Jiaotong University, Chongqing 430003, China);MODEL TEST FOR FATIGUE PERFORMANCE OF ANCHORAGE IN CABLE-STAYED BRIDGE WITH STEEL BOX GIRDER[J];Engineering Mechanics;2007-08
4 Zhou Liang1 Hu Yang2 Deng Weilin1 Yang Yunbiao2 (1.Shanghai Urban Construction Design and Research Institute, Shanghai 200011, China;2.Halcrow China Ltd, Shanghai 200021, China);STRESS ANALYSIS OF ANCHORAGE ZONE OF CABLE-GIRDER STEEL ANCHOR BOX FOR MINPU BRIDGE Ⅱ IN SHANGHAI[J];Steel Construction;2009-09
5 Wang Yong, Jin Weibing, Xu Ligong, Shi Liqun ( Jiangsu Communication planning and design institute, Nanjing 210005, China; Jiangsu transportation research institute, Nanjing 210017 , China);Analyze on Guanhe Cable - stayed Bridge Anchor Plate Structure[J];Modern Transportation Technology;2004-01
6 Li Xiaozhen Cai Jing Qiang Shizhong (Southwest Jiaotong University );STUDIES ON MODELS OF CABLE-GIRDER ANCHORAGE FOR LONG-SPAN CABLE-STAYED BRODGES WITH STEEL BOX GIRDER[J];China Civil Engineering Journal;2004-03
7 Ren Weiping Qiang Shizhong Li Xiaozhen Li Jun(Southwest Jiaotong University,Chengdu 610031,China);Mechanical behavior and fatigue reliability of tensile anchor plate structure in the cable-beam anchorage zones of cable-stayed bridges[J];China Civil Engineering Journal;2006-10
8 REN Weiping,QIANG Shizhong,WEI Xing,WANG Chunhan(School of Civil Eng.,Southwest Jiaotong University,Chengdu 610031,China);Fatigue Test of Tensile Anchor Plates in Cable-Beam Anchorage Zones for Zhanjiang Gulf Bridge[J];Journal of Southwest Jiaotong University;2007-01
9 WANG Zijian, WEI Xing, LI Xiaozhen, LI Jun, QIANG Shizhong (School of Civil Eng. , Southwest Jiaotong University, Chengdu 610031, China);Full Scale Model Test on Cable-Girder Anchorage of Zhanjian Gulf Bridge[J];Journal of Southwest Jiaotong University;2007-02
China Proceedings of conference Full-text Database 1 Hits
1 LI Xiao-zhen , WEI Xing, WANG Zi-jian , QIANG Shi-zhong (School of Civil Engineering, Southwest Jiaotong University, Chengdu 610031,China);State-of-the-Art Review of Cable-Girder Anchorage for Long-Span Bridges for the New Century[A];[C];2006
【Citations】
Chinese Journal Full-text Database 1 Hits
1 Sheng Guiping;Analysis of Spatial Stress in Anchorage Zone in Cable Stayed Steel Box Girder[J];BRIDGE CONSTRUCTION;1997-01
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 Xiong Xiangjun (Dept of Civil Engineering, Tsinghua University, Beijing 100084);STATE OF THE ART REPORT OF RESEARCH ON FIRE RESISTANCE OF REINCORCED CONCRETE STRUCTURES AND ITS FUTURE TRENDS[J];BUILDING SCIENCE RESEARCH OF SICHUAN;1999-04
2 SUN Tong-li~1,XIAO Zhi-qiao~2(1.Depatrment of Geotechnical Engineering,Tongji University,Shanghai 200092,China;2.Shanghai Water Conservancy Engineering Design & Research Institute,Shanghai 200063,China);The Effective Calculation Method of Rock Bolt in Geotechnical[J];Chinese Journal of Underground Space and Engineering;2006-01
3 SUN Tong-li~1,XIAO Zhi-qiao~2(1.Department of Geotechnical Engineering,Tongji University,Shanghai 200092,China;2.Shanghai Water Conservancy Engineering Design & Research Institute,Shanghai 200063,China);The Effective Calculation Method of Rock Bolt in Geotechnical Engineering[J];Chinese Journal of Underground Space and Engineering;2006-02
4 FU Yong1,LOU Xiaoming2,ZHANG Rong1(1.Shanghai Cinda Yintai Property Co.Ltd.,Shanghai 201206;2.Department of Geotechnical Engineering,Tongji University,Shanghai 200092);Simulation Analysis on Influence of Soft Clay Softening on Bearing Capacity of Steel Pipe Piles[J];Chinese Journal of Underground Space and Engineering;2007-05
5 CAI Dan 1, WEI Chen guan 1, SONG Wen yue 2 (1.School of Vehicular & Transportation Engineering, Beijing Institute of Technology, Beijing 100081, China; 2.China North Vehicle Research Institute, Beijing 100072, China);Measurement of Surface Temperature Distributions and Calculation of Surface Stresses on Clutch Discs[J];Acta Armamentarll The Volume of Tank, Armored Vehicle and Engine;2000-04
6 Yue Shigang;Yu Yueqing(Department of Basic Science, Beijing Plytechnic University,100022);A New Quick Method on Obtaining Steady State Dynamic Response of Elastic Linkages[J];JOURNAL OF BEIJING POLYTECHNIC UNIVERSITY;1994-02
7 Huang Wen Li Mingrui Huang Wenbin (Department of Basic Sciences);Geometric Non-linear Analysis of Frame Structure Using Finite Element Method(Ⅰ):Two Dimensional Problem[J];Journal of Beijing Agricultural Engineering University;1994-03
8 Zhang Ying (Dept. Basic Sciences,Beijing 100044);Numerical Simulation of Brittle Material Breakage with Cracks[J];Journal of Beijing Institute of Civil Engineering and Architecture;2004-02
9 Wang Jianqi, Zhu xinya,Wang Haibin,Dong Xuozhen, Qi Jiaxue (Dept.of BME, Fourth Military Medical University, Xi′an\ 710032);An Algorithm to Solve the Finite Element Eguations for Thoracic 3-Dimentional Steady Electric Field Analysis[J];BEIJING BIOMEDICAL ENGINEERING;2000-01
10 WANG Bao-feng~1,XIE Yan-min~1,MA Yong-lin~2(1.Institute of Metallurgical Engineering,UST Inner Mongolia,Baotou 014010,China;2.Material Science and Engineering School,UST Inner Mongolia,Baotou 014010,China);FEM of stress field of mould in high speed continuous casting of steel billet[J];Journal of Baotou University of Iron and Steel Technology;2003-03
China Proceedings of conference Full-text Database 2 Hits
1 LUO Min LIU Ju-bao ZHANG Qiang (Mechanical science and engineering college,Daqing Petroleum Institute,Daqing,Heilongjiang 163318,China);Application of Rotating Rod Dynamics Analysis in the Design of Rod String Centralizer[A];[C];2007
2 Wei qun Liu guangting Chen xinghua Wang zhou;Simulating the Whole Procedure of Progressive Failure of Joint Rock by the D.E.M.[A];[C];1990
【Co-references】
Chinese Journal Full-text Database 10 Hits
1 WAN Zhen,LI Qiao,MAO Xue-ming (School of Civil Engineering,Southwest Jiaotong University,Chengdu 610031,China);Comparison and analysis of 3D-finite-element models of steelanchor-box at the cable-girder anchorage zone for long-span cable-stayed bridge[J];Sichuan Building Science;2006-01
2 Fang Congyan,Liu Ning(College of Civil Engineering,Hehai University, Nanjing 210098);ON RELIABILITY-BASED OPTIMAL DESIGN OF STRUCTURES[J];Journal of Anhui Institute of Architecture;2002-01
3 LI Jing (Beijing University of Aeronautics and Astronautics,Dept. of Flight Vehicle Design and Applied Mechanics) LI Tian (Shenyang Institute of Aircraft) WU Zhe (Beijing University of Aeronautics and Astronautics,Dept. of Flight Vehicle Design and A;Fuzzy Optimization of Geometrical Parameters of Fighter Basing on Fluctuating Weights[J];JOURNAL OF BEIJING UNIVERSITY OF AERONAUTICS AND ASTRONAUTICS;2000-01
4 LIU Tao, XU Qi-nan, PEI Jun-hou(China Ship Scientific Research Center, Wuxi 214082,China);Buckling Analysis and Optimization Design of Composite Cylindrical Shells[J];Journal of Ship Mechanics;2000-06
5 Liang Shuo; Zen Qinyuan(Changsha Communications University) (Changsha Raiway University) Zhang Qisen(Changsha Communications University);SUMMARY OF UTIMATE LOAD CAPACITY ANALYSIS FOR LONG SPAN CONCRETE CABLE-STAYED BRIDGES[J];JOURNAL OF CHANGSHA COMMUNICATIONS UNIVERSITY;1997-03
6 ZHENG Qiang 1, LIU Yong jian 2, LI Chuan xi 2 (1.Foshan Comm. Development Corporation, Foshan 528000, China; 2.Changsha Comm. Univ., Changsha 410076, China);Finite Element Analysis of Steel Anchor Box of Fo-Chen Bridge[J];Journal of Changsha Communications University;2000-04
7 YU Xiang dong, CHEN Zheng qing (Civil Architectural Engineering College, Changsha Railway University, Changsha 410075, China);An Energy Method Used to Calculate the Stability Safety Coefficient of Towers of Cable Stayed Bridges[J];JOURNAL OF CHANGSHA RAILWAY UNIVERSITY;2000-01
8 Man Honggao Li Qiao Zhang Yuzhi(School of Civil Engineering,Southwest Jiaotong University,Chengdu 610031,China);Design optimization of fatigue test model for the cable-girder anchorage zone of steel cable-stayed bridges[J];Journal of Southeast University(Natural Science Edition);2007-02
9 GU Yuan xian, ZHAO Guo zhong, LI Yun peng (State Key Laboratory of Structural Analysis for Industrial Equipment, Department of Engineering Mechanics, Dalian University of Technology, Dalian 116024,China);OPTIMUM DESIGN AND SENSITIVITY ANALYSIS FOR BUCKLING STABILITY OF COMPOSITE LAMINATED PLATES[J];Acta Materiae Compositae Sinica;2002-04
10 Z H U O Wei - dong1 , F A N G Zhen - zheng1 , L I N Qing2(1 College of Civiland Architectural Engineering , Fujian Fuzhou 350002 , China ;2 City and Rural Construction Councilof Fuzhou City , Fujian Fuzhou 350005 , China);Spatial Stress Analysis of Fixed Pier- Tower- Beam Jointof Cable - Stayed Bridges[J];JOURNAL OF FUZHOU UNIVERSITY(NATURAL SCIENCES EDTION);1999-04
【Secondary References】
Chinese Journal Full-text Database 10 Hits
1 LIU Xiao-yu,WANG Yan-bo (School of Civil Engineering & Architecture,Chongqing Jiaotong University,Chongqing 400074,China);Test and Analysis of Welding Residual Stress for Tensile Anchor Plate of Guanyinyan Bridge[J];Journal of Chongqing Jiaotong University(Natural Science);2008-S1
2 Li Zhenxin,Wei Xing,Qiang Shizhong,Ren Weiping(School of Civil Engineering,Southwest Jiaotong University,Chengdu 610031,P.R.China);Fatigue Safety on Weak Connection of Arch Truss Cross Joint of Chaotianmen Yangtze River Bridge[J];Journal of Northeast Forestry University;2009-04
3 Chen Qifei1,2 Li Aiqun1 Zhao Daliang1 Wang Hao1(1School of Civil Engineering,Southeast University,Nanjing 210096,China)(2Engineering Institute of Engineer Corps,PLA University of Science and Technology,Nanjing 210007,China);Experiment and submodeling analysis on local stress in main girder of prestressed concrete cable-stayed bridge[J];Journal of Southeast University(Natural Science Edition);2007-02
4 WEI Xing , LI Xiao-zhen , LI Jun , QIANG Shi-zhong , WANG Zi-jian (College of Civil Engineering, Southwest Jiaotong University, Chengdu 610031, China);EXPERIMENTAL STUDY ON ANCHOR-PLATE ANCHORAGE FOR CABLE-STAYED BRIDGES WITH STEEL BOX GIRDER[J];Engineering Mechanics;2007-04
5 Li Xiaozhen Ren Weiping Wei Xing Qiang Shizhong(School of Civil Eng.,Southwest Jiaotong University Chengdu 610031);NEW STRUCTURAL TYPES AND FATIGUE PROBLEMS OF MODERN STEEL BRIDGE STRUCTURES[J];Steel Construction;2006-05
6 Ren Weiping Li Xiaozhen Li Jun Qiang Shizhong (School of Civil Eng.,Southwest Jiaotong Universitity Chengdu 610031);TEST STUDY ON CONNECTION OF CROSS BEAMS AND INTEGRAL JOINTS OF LONGSPAN STEEL TRUSS BRIDGE[J];Steel Construction;2007-04
7 LU Gui-chen1,LUO Jia-biao2 (1. Zhoushan Strait Bridge Development Co. Ltd.,Zhoushan 316000,China; 2. Zhejiang Marine Engineering Co. Ltd.,Ningbo 315000,China);Application of Engineering Plastics in Bridge Construction[J];China Harbour Engineering;2006-06
8 REN Wei-ping,LI Xiao-zhen,LI Jun,WEI Xing,QIANG Shi-zhong (School of Civil Engineering,Southwest Jiaotong University,Chengdu 610031,China);Fatigue Problems of Some Typical Details in Modern Steel Highway Bridge Structures[J];Highway;2007-04
9 BAI Guang-liang,PU Qian-hui,XIA Zhao-guang(School of Civil Engineering,Southwest Jiaotong University,Chengdu Sichuan 610031,China);Analysis of 3D Finite Element Models for Concrete Pylon Steel-anchor-box in Long-span Cable-stayed Bridge[J];Journal of Highway and Transportation Research and Development;2008-08
10 LIU Xiao-yu,LIU Xiu-wei (School of Civil Engineering and Architecture,Chongqing Jiaotong University,Chongqing 400074,China);Experimental Study on Releasing Welding Residual Stress in Steel Tensile Anchor Plate Area of Cable-stayed Bridges[J];Journal of Highway and Transportation Research and Development;2008-11
China Proceedings of conference Full-text Database 3 Hits
1 LI Xiao-zhen , WEI Xing, WANG Zi-jian , QIANG Shi-zhong (School of Civil Engineering, Southwest Jiaotong University, Chengdu 610031,China);State-of-the-Art Review of Cable-Girder Anchorage for Long-Span Bridges for the New Century[A];[C];2006
2 LU Chun-yang WU Chong (Dep.of Bridge Engineering,Tongji University,Shanghai 200092);Numerical Analysis of Anchorage Zone of Shanghai Yangzi River Bridge[A];[C];2007
3 ZHENG Zhou-jun,LIU Hong,GUO Zhi-min (Wuhan Bridge Science Research Institute Ltd.,China roilway big Bridge Engineering Coroup, Wuhan 430071,China);Study on Fatigue Tost of Cable-grider Anchorage Zone[A];[C];2007
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved