TO SPEED UP BRIDGE CONSTRUCTION USING ASSEMBLED STEEL BRIDGE TECHNOLOGY

Xu Guanyao1 Yin Cunxin2 Zhou Jian3(1. No. 2 Institute of Engineer Corps,General Equipment Headquarters,Beijing 100093,China;2. Beijing General Municipal Engineering Design & Research Institute,Beijing 100082,China;3. Jiangsu Zhongjian Bridge Engineering Equipment Co.Ltd,Zhenjiang 212011,China)  
The characteristics of assembled steel bridge technology is analysisd,the method of using of assembled steel bridge technology to erect temporary bridge and falsework is studied,the problems and effective technical measures of solving problems during the using are proposed.The practical results show that the use of assembled steel bridge technology is good to speed up bridge construction,advance construction efficiency,and increase economical benefits finally.
【CateGory Index】: U448.36
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Citations】
Chinese Journal Full-text Database 2 Hits
1 ZHU Yong-zhuo 1, XU Guan-yao 2, GOU Ming-kang 3 (1. Planning Department of the Ministry of Communications,Bejing,China 100736; 2.No.2 Institute of Engineering Corps of the General Equipment Headquarters, Beijing, China 100093; 3. No.1 Institute of Engineering Corps of the General Equipment Headquarters, Wuxi,Jiangsu,China 214035);Design and Realization of Type-ZB-200 Prefabricated Highway Steel Bridges[J];Traffic Engineering and Technology for National Defence;2004-01
2 Xu Guanyao1 Zhu Jie2 (1. No.2 Institute of Engineer Corps, General Equipment Headquarters, Beijin g 100093, China; 2. Zhejiang Lixiang Tongji Engineering Machinery Co. Ltd, Shangyu 31236 7, China);DEVELOPMENT AND APPLICATION OF PORTABLE STEEL BRIDGES IN CHINA[J];Steel Construction;2009-07
【Co-citations】
Chinese Journal Full-text Database 6 Hits
1 Xu Guanyao,Sun Hongcai,TIAN Ping(No.2 Scientific Research Institute of the Engineering Corps,General Equipment Headquarters,Beijing 100093,China);Safety Assessment of Type-321 Portable Steel Bridge[J];Traffic Engineering and Technology for National Defence;2009-02
2 Xu Guanyao1 Zhu Jie2 (1. No.2 Institute of Engineer Corps, General Equipment Headquarters, Beijin g 100093, China; 2. Zhejiang Lixiang Tongji Engineering Machinery Co. Ltd, Shangyu 31236 7, China);DEVELOPMENT AND APPLICATION OF PORTABLE STEEL BRIDGES IN CHINA[J];Steel Construction;2009-07
3 Zhao Jialiang Song Huawei(Beijing Chongjian Construction Co.Ltd,Beijing 100061,China);THE TECHNOLOGY OF THE PREFABRICATED STEEL-BOX GIRDER SEGMENT INTERFACE MATCHING AND THE LAW OF INTERFACE GIRTH WELDING DEFORMATION[J];Steel Construction;2010-09
4 Ouyang Chu 1 Ma Guangshun 1 Xu Guanyao 1 Zhang Hengfei 2(1.No.2 Institute of Engineer Corps,General Equipment Headquarters,Beijing 100093,China;2.Jiangsu Donghua Testing Technology Co.Ltd,Jingjiang 214500,China);DESIGN OF HEALTH MONITORING AND SAFETY EVALUATION SYSTEM FOR ASSEMBLED STEEL BRIDGE[J];Steel Construction;2010-12
5 CHEN Zheng~1 SHU Bi-qing~1 ZHANG Yan-hong~2 YANG Ping~1 SUN Hong-yan~1 (1.College of Civil Engineering of Nanjing Forestry University,Nanjing Jiangsu 210003 China;2.Bridge & Tunnel Construction Company of No.3 Bureau of China Railway Construction Bureau,Taiyuan Shanxi 030000 China);Inner Force and Deflection Analysis in the Temporary Bridge of Metro Station Loading Test[J];Jiangsu Construction;2007-01
6 SUN Hong-cai,XU Guan-yao,TIAN Ping(No.2 Institute of Engineer Corps,General Equipment Headquarters,Beijing 100093,China);Design Alternatives Evaluation of Emergency Bridge by Applying Analytic Network Process(ANP)[J];Systems Engineering-Theory & Practice;2007-03
【Secondary Citations】
Chinese Journal Full-text Database 4 Hits
1 ZHU Yong-zhuo 1, XU Guan-yao 2, GOU Ming-kang 3 (1. Planning Department of the Ministry of Communications,Bejing,China 100736; 2.No.2 Institute of Engineering Corps of the General Equipment Headquarters, Beijing, China 100093; 3. No.1 Institute of Engineering Corps of the General Equipment Headquarters, Wuxi,Jiangsu,China 214035);Design and Realization of Type-ZB-200 Prefabricated Highway Steel Bridges[J];Traffic Engineering and Technology for National Defence;2004-01
2 Xu Guanyao(No.2 Institute, Engineer Corps, Engineer Corps, PLA Beijing 100093)Yu Zhongquan (Highway Planning & Design Institute Beijing 100010);THE STATUS AND DEVELOPMENT OF PREFABRICATED BRIDGE[J];STEEL CONSTRUCTION;1999-03
3 Miao Guangquan (No.1 Machinery Plant of Jiangsu Provincial Communications Engineering Corporation Zhenjiang 212001) Xu Guanyao (No.2 Institute of Engineer Corps, General Equipment Headquarters Beijing 100093);DEFICIENCY OF TYPE 100 BAILEY BRIDGES UNDER TODAY′S TRAFFIC CONDITIONS AND FEATURES OF TYPE 200 BRIDGES[J];Steel Construction;2002-05
4 Xu Guanyao Sun Hongcai (No. 2 Institute of Engineer Corps, General Equipment Headquarters Beijing 100093) Liu Yong Xie Feng (Engineering Institute of Engineering Corps,PLA Univ. of Sci. & Tech. Nanjing 210007);RESEARCH ON IMPACT FACTOR FOR PREFABRICATED HIGHWAY STEEL BRIDGES[J];Steel Construction;2002-05
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved